Solicitation No. 11-102-SOL-00004 Senior Software Developer

Page 2 of 34 Part I – Contract Terms and Conditions

1. PRICE SCHEDULE

Hourly Extended

Hours Rate Total

Base Year 1,831 $________ $___________

Option Year One 1,831 $________ $___________

Option Year Two 1,831 $________ $___________

Option Year Three 1,831 $________ $___________

Option Year Four 1,831 $________ $___________

Total: $___________

2. COMMERCIAL ITEM ACQUISITION

This commercial item solicitation for Senior Software Developer Services is subject to Federal

Acquisition Regulation (FAR) Part 12 and Part 13, Simplified Acquisition Procedures. This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular No. 2005-53 dated

07/05/2011. Also, reference FAR 13.500 – Test Program for Certain Commercial Items.

3. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERICAL ITEMS (JUNE 2010)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727).

However, when a third party makes payment (e.g., use of the Government-wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C.

601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_233_240.html#wp1113304

Page 3 of 34 Part I – Contract Terms and Conditions reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice to the address designated in the contract to receive invoices (SF 1449 Block 18(a)), one copy shall be provided to the COTR and one to the

Contracting Officer. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or

52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor

Registration), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and

Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the https://www.acquisition.gov/far/current/html/52_200_206.html#wp1137572 https://www.acquisition.gov/far/current/html/52_232.html#wp1153351 https://www.acquisition.gov/far/current/html/52_232.html#wp1153375 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20

Page 4 of 34 Part I – Contract Terms and Conditions performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt

Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting

Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_212_213.html#wp1179527 https://www.acquisition.gov/far/current/html/Subpart%2033_2.html#wp1079912 https://www.acquisition.gov/far/current/html/Subpart%2032_6.html#wp1031290

Page 5 of 34 Part I – Contract Terms and Conditions

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the

Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the

Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The

Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the

Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the

Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the

Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

https://www.acquisition.gov/far/current/html/Subpart%2032_6.html#wp1031326

Page 6 of 34 Part I – Contract Terms and Conditions

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31

U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work

Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10

U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with

Laws Unique to Government Contracts paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) Central Contractor Registration (CCR).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)(i) If a Contractor has legally changed its business name, ―doing business as‖ name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of

Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer.

http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t17t20+160+141++%2818%29%20%25 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+1574+51++%2840%29%20%20AND%20%28%2840%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t09t12+37+408++%2810%29%20%252 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t09t12+37+408++%2810%29%20%252 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t49t50+2+224++%2849%29%20%20AND%20%28%2849%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_212_213.html#wp1179527 https://www.acquisition.gov/far/current/html/FormsStandard68.html#wp1189284 https://www.acquisition.gov/far/current/html/Subpart%2042_12.html#wp1084217 https://www.acquisition.gov/far/current/html/Subpart%2042_12.html#wp1084217

Page 7 of 34 Part I – Contract Terms and Conditions

The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the ―Suspension of Payment‖ paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims

(see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the ―Suspension of payment‖ paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.ccr.gov or by calling 1-888-227-2423 or 269-961-5757.

ADDENDUM TO FAR 52.212-4

4. PERIOD OF PERFORMANCE

(a) The base period of performance for this contract shall commence January 1, 2012 and end

December 31, 2012. The contract includes four one year option periods that may be exercised. If an option period is exercised, the period of performance is extended through the end of that option period.

(b) The option periods that may be exercised are as follows:

Period Start Date End Date

Option I January 1, 2013 December 31, 2013

Option II January 1, 2014 December 31, 2014

Option III January 1, 2015 December 31, 2015

Option IV January 1, 2016 December 31, 2016

5. CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE (COTR)

(a) The Contracting Officer may designate, in writing, one or more Government employees by name and position title, to take action for the Contracting Officer as the Contracting Officer’s Technical

Representative (COTR) under this contract.

(b) The COTR responsibilities shall include continuous overall monitoring of the Contractor’s compliance with all substantive project objectives. Specific duties and responsibilities are:

(1) Directions to the Contractor which redirect the contract effort, shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish the contractual statement of work.

https://www.acquisition.gov/far/current/html/Subpart%2032_8.html#wp1029202 http://www.ccr.gov/

Page 8 of 34 Part I – Contract Terms and Conditions

(2) Provision of information to the Contractor which assists in the interpretation of drawings, specifications, or technical portions of the work description.

(3) Review and, where required by the contract, approval of technical reports, drawings, specifications, and technical information to be delivered by the Contractor to the Government under the contract.

(c) Technical direction must be within the general Statement of Work stated in the contract. The

COTR does not have the authority to and may not issue any technical directions which:

(1) Constitutes an assignment of additional work outside the general Statement of Work of the contract.

(2) In any manner cause an increase or decrease in the total estimated contract cost, fixed-fee, or the time required for contract performance.

(3) Change any of the expressed terms, conditions, or specifications of the contract.

(d) All technical direction shall be issued in writing by the COTR or shall be confirmed by him/her in writing within 5 working days after issuance. The Contractor shall proceed promptly with the performance of technical direction duly issued by the COTR in the manner prescribed by this article and within his/her authority under the provisions of this article. If, in the opinion of the

Contractor, any instruction or direction issued by the COTR is within one of the categories as defined in c(1) through c(3) above, the Contractor shall not proceed but shall notify the

Contracting Officer.

6. CONTRACTING OFFICER

(a) The term Contracting Officer means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority delegated by the Contracting Officer.

(b) Notwithstanding any of the other provisions of this Contract, the Contracting Officer shall be the

ONLY individual authorized to:

(1) enter into and commit/bind the Government by contract for supplies or services;

(2) accept nonconforming work or waive any requirement of this Contract;

(3) authorize reimbursement to the Contractor for any costs incurred during the performance of the Contract, and

(4) modify any term or condition of this Contract, i.e., make any changes in the Statement of

Work; modify/extend the period of performance; change the delivery schedule.

7. WORKING PAPERS/DATA TO BE DELIVERED

(a) The Contractor shall provide, at the request of the Contracting Officer, all the working papers used by the participating officials and employees of the Contractor in connection with this project.

(b) Any working papers, interim reports, data given by the Government or first produced by the

Contractor under the contract or collected or otherwise obtained by the Contractor under the contract, or results obtained or developed by the Contractor (subcontractor or consultants) pursuant to the fulfillment of this contract are to be delivered, documented, and formatted as directed by the Contracting Officer.

(c) In addition, information and/or data, which are held by the Contractor related to the operation of their business and/or institution and which are obtained without the use of Federal funds, shall be

Page 9 of 34 Part I – Contract Terms and Conditions considered ―PROPRIETARY DATA‖ and are not subject data to be delivered under this contract.

The rights to data developed, if any, in the execution of the services required by this contract shall become the sole property of the Government,

8. USE OF GOVERNMENT – DATA (REPORTS/FILES/INFORMATION TECHNOLOGY)

Any data given to the Contractor by the Government shall be used only for the performance of the contract unless the Contracting Officer specifically permits another use, in writing. Should the

Contracting Officer permit the Contractor the use of Government-supplied data for a purpose other than solely for performance of this contract and, if such use could result in a commercially viable product, the Contracting Officer and the Contractor must negotiate a financial benefit to the

Government. This benefit should most often be in the form of a reduction in the price of the contract;

however, the Contracting Officer may negotiate any other benefits he/she determines is adequate compensation for the use of these data.

Upon the request of the Contracting Officer, or the expiration date of this contract, whichever shall come first, the Contractor shall return or destroy all data given to the Contractor by the Government.

However, the Contracting Officer may direct that the data be retained by the Contractor for a specific period of time, which period shall be subject to agreement by the Contractor. Whether the data are to be returned, retained, or destroyed shall be the decision of the Contracting Officer with the exception that the Contractor may refuse to retain the data. The Contractor shall retain no data, copies of data, or parts thereof, in any form, when the Contracting Officer directs that the data be returned or destroyed. If the data are to be destroyed, the Contractor shall directly furnish evidence of such destruction in a form the Contracting Officer shall determine is adequate.

9. CONTRACT TYPE

This is a firm-fixed price contract for Senior Software Developer services.

10. SECURITY / BACKGROUND CHECK

Contractor will be required to successfully complete a background investigation through e-QIP, initiated by the Indian Health Service. The Contractor will also be required to obtain a Department of

Health and Human Services identification card, using the HHS-745. Temporary access will be provided during the investigation, which will last 3-6 months. If for any reason the key person fails to pass the background investigation, the contractor may offer a similarly qualified individual, based on the qualifications included in the solicitation and resulting contract, and as deemed acceptable by the

Government. If no acceptable replacement is identified within 2 business days, the contract will be terminated for cause at no cost to the Government in accordance with the terms and conditions of this contract and applicable laws and regulations.

11. SECURITY PRECLEARANCE

(a) Performance of this contract will require routine access by employees of the Contractor or its subcontractors to facilities or systems controlled by the Indian Health Service (IHS).

(b) Before starting work requiring routine access to IHS facilities or systems each person must complete a FBI National Criminal History Check (fingerprint check) adjudicated by an IHS employee using the Office of Personnel Management Personnel Investigations Processing

System. Contractors shall allow five business days for IHS processing of fingerprints taken electronically at an IHS site and thirty business days for non-electronic processing of fingerprints

Page 10 of 34 Part I – Contract Terms and Conditions using FBI Form FD-258. A list of IHS sites with electronic fingerprint capability is available from the Contracting Officer.

(c) In addition, no Contractor or subcontractor employee shall be permitted to perform work under this contract if listed on the HHS Office of Inspector General List of Excluded Individuals/Entities

(LEIE), http://exclusions.oig.hhs.gov. As soon as practicable prior to the start of work, the

Contractor shall provide to the Contracting Officer the names of all individuals to be used in performance of the work for screening against the LEIE. During performance the Contractor shall provide to the Contracting Officer the names of any additional or substitute employees for screening before they begin work.

(d) The Contractor is responsible for conducting security preclearance investigations in sufficient depth to assure that each Contractor or subcontractor employee referred to IHS is not on the

LEIE and can obtain a favorable fingerprint clearance. Each security preclearance shall be conducted sufficiently in advance of the start of performance to avoid delays caused by denial of access. If this is a Time-and-Materials, Labor-Hour or Cost-Reimbursement contract, the contractor shall not charge for or be reimbursed for labor hours or other costs incurred for employees who are unable to perform because of denial of access or the excess time required to resolve and clear unfavorable security clearance findings. If this is a Fixed-Price contract, denial of access due to security clearance findings shall not be a basis for excusable delay or an increase to the contract amount.

12. CONTRACTOR ACCCESS AND TERMINATION FROM ACCESS TO IHS BUILDINGS

(a) IHS is a professional environment and contractor personnel coming onto the premises are advised that it is a non-smoking environment as well. Contractor personnel and the COTR shall coordinate regarding the need for contractor access to the facility and the possible need for badges to allow for such access. Security procedures defined in paragraph 10 are applicable prior to obtaining a badge for contractor employees.

(b) In the event that the contractor terminates an employee working on this contract, or an employee working on this contract voluntarily leaves the employment of the contractor and that employee has been issued a contractor’s badge by IHS for access to IHS buildings. The contractor shall immediately take the following actions:

(1) Secure the IHS contractor’s badge from the employee;

(2) Formally advise the contracting officer that the individual is no longer an employee of the contractor, and;

(3) return the badge with the notification to the contracting officer.

13. CONTRACTOR PERFORMANCE ASSESSMENT RATING SYSTEM

(a) Past Performance Evaluation

In accordance with Federal Acquisition Regulation (FAR) 42.15, IHS will complete annual and final contractor performance evaluations. Annual evaluations will be prepared to coincide with the anniversary date of the contract. Additional interim performance evaluations may be prepared at

Contracting Officer discretion, as necessary. Final performance evaluations will be completed upon contract expiration.

IHS will utilize the Contractor Performance Assessment Reporting System (CPARS) in order to execute annual and final contractor performance evaluations. CPARS is a secure Internet website located at http://www.cpars.csd.disa.mil/cparsmain.htm. IHS will register the contractor in CPARS http://exclusions.oig.hhs.gov/

Page 11 of 34 Part I – Contract Terms and Conditions upon receipt of the name and email address of two (2) individuals who will be responsible for serving as the Contractor's primary and alternate CPARS contacts. Once IHS registers the contractor in

CPARS, the Contractor will receive an automated CPARS email message that contains User IDs and instructions for creating a password.

(b) Past Performance Registration

Once a performance evaluation is issued, the Contractor's primary and alternate CPARS contact will receive an email instructing them to logon to CPARS in order to review the performance evaluation.

The Contractor has 30 days from the date of performance evaluation issuance in which to review the evaluation. If the Contractor is in agreement with the performance evaluation outcome, the evaluation becomes final. Should the Contractor be in disagreement with the performance evaluation outcome, rebuttal comments must be submitted via the CPARS within 30 days from date the evaluation was issued by IHS. Any disagreement between the Contracting Officer and the Contractor will be referred to the Chief of the Contracting Office (Engineering Services-Seattle), whose decision will be final.

Copies of each performance evaluation and contractor responses, if any, will be retained as part of the official contract file and will be used to support future award decisions. Evaluations will also be stored for a 3-year period in the Past Performance Information Retrieval System (PFPRS) at www.PfPrs.gov.

Contractors may obtain CPARS training material and register for on-line training at http://www.cpars.csd.disa.mil/allapps/cpcbtdlf.htm. There is no fee for registration or use of the

CPARS.

14. HHSAR 352.242-70 KEY PERSONNEL (JAN 2006)

(a) The key personnel specified in this contract are considered to be essential to work performance.

At least 30 days prior to diverting any of the specified individuals to other programs or contracts

(or as soon as possible, if an individual must be replaced, for example, as a result of leaving the employ of the Contractor), the Contractor shall notify the Contracting Officer and shall submit comprehensive justification for the diversion or replacement request (including proposed substitutions for key personnel) to permit evaluation by the Government of the impact on performance under this contract. The Contractor shall not divert or otherwise replace any key personnel without the written consent of the Contracting Officer. The Government may modify the contract to add or delete key personnel at the request of the contractor or Government.

The following individual is considered key personnel under this contract:

Senior Software Developer

15. INDIAN PREFERENCE (APR 1984)

(a) The Contractor agrees to give preference in employment opportunities under this contract to

Indians who can perform required work, regardless of age (subject to existing laws and regulations), sex, religion, or tribal affiliation. To the extent feasible and consistent with the efficient performance of this contract, the Contractor further agrees to give preference in employment and training opportunities under this contract to Indians who are not fully qualified to perform regardless of age

(subject to existing laws and regulations), sex, religion, or tribal affiliation. The Contractor also agrees to give preference to Indian organizations and Indian-owned economic enterprises in the awarding of

Page 12 of 34 Part I – Contract Terms and Conditions any subcontracts to the extent feasible and consistent with the efficient performance of this contract.

The Contractor shall maintain statistical records as are necessary to indicate compliance with this paragraph.

(b) In connection with the Indian employment preference requirements of this clause, the

Contractor shall provide opportunities for training incident to such employment. Such training shall include on-the-job, classroom or apprenticeship training which is designed to increase the vocational effectiveness of an Indian employee.

(c) If the Contractor is unable to fill its employment and training opportunities after giving full consideration to Indians as required by this clause, the Contractor may satisfy those needs by selecting persons other than Indians in accordance with the clause of this contract entitled "Equal

Opportunity."

(d) If no Indian organizations or Indian-owned economic enterprises are available under reasonable terms and conditions, including price, for awarding of subcontracts in connection with the work performed under this contract, the Contractor agrees to comply with the provisions of this contract involving utilization of small businesses; HUBZone small businesses; service-disabled, veteran-owned small businesses; 8(a) small businesses; veteran-owned small businesses; women-owned small businesses; or small disadvantaged businesses.

(e) As used in this clause,

(1) "Indian" means a person who is a member of an Indian Tribe. If the Contractor has reason to doubt that a person seeking employment preference is an Indian, the Contractor shall grant the preference but shall require the individual to provide evidence within 30 days from the Tribe concerned that the person is a member of the Tribe.

(2) "Indian Tribe" means an Indian Tribe, pueblo, band, nation, or other organized group or community, including Alaska Native village or regional or village corporation as defined in or established pursuant to the Alaska Native Claims Settlement Act (85 Stat. 688; 43 U.S.C. 1601) which is recognized as eligible for the special programs and services provided by the United States to

Indians because of their status as Indians.

(3) "Indian organization" means the governing body of any Indian Tribe or entity established or recognized by such governing body in accordance with the Indian Financing Act of 1974 (88 Stat. 77;

25 U.S.C. 1451).

(4) "Indian-owned economic enterprise" means any Indian-owned commercial, industrial, or business activity established or organized for the purpose of profit, provided that such Indian ownership shall constitute not less than 51 percent of the enterprise, and that ownership shall encompass active operation and control of the enterprise.

(f) The Contractor agrees to include the provisions of this clause, including this paragraph (f) of this clause, in each subcontract awarded at any tier under this contract.

(g) In the event of noncompliance with this clause, the Contracting Officer may terminate the contract in whole or in part or may impose any other sanctions authorized by law or by other provisions of the contract.

http://www.law.cornell.edu/uscode/uscode43/usc_sup_01_43_10_33.html http://www.law.cornell.edu/uscode/html/uscode25/usc_sup_01_25_10_17.html

Page 13 of 34 Part I – Contract Terms and Conditions

16. FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of

Management and Budget (OMB) guidance M-05-24 and Federal Information Processing Standards

Publication (FIPS PUB) Number 201.

(b) The Contractor shall account for all forms of Government-provided identification issued to the

Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee’s employment.

(3) Upon contract completion or termination.

(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor’s employees are required to have routine physical access to a

Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.

17. FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (JAN 2011)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity

Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the Central Contractor Registration database at http://www.ccr.gov.

(b)(1) The Contractor will receive notification when the Government posts new information to the

Contractor’s record.

(2) The Contractor will have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.

(3)(i) Public requests for system information posted prior to April 15, 2011, will be handled under

Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.

(ii) As required by section 3010 of Public Law 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.

18. FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed six (6) months. The

Page 14 of 34 Part I – Contract Terms and Conditions

Contracting Officer may exercise the option by written notice to the Contractor no later than fifteen

(15) days prior to the completion of the period of performance.

19. FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within thirty (30) days prior to the end of the contract period of performance; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least forty-five (45) days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.

Page 15 of 34 Part II – Contract Terms and Conditions Required to Implement Statutes and Executive Orders

1. FAR 52.212-5 CONTRACT TERMS AND CONITIONS REQUIRED TO IMPLEMENT STATUTES

AND EXECUTIVE ORDERS (MAY 2011)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).

___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting

Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

XX (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with

Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American

Recovery and Reinvestment Act of 2009.)

XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2010)

(Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010)

(Pub. L. 111-5).

XX (6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (DEC 2010) (31 U.S.C. 6101 note). (Applies to contracts over $30,000). (Not applicable to subcontracts for the acquisition of commercially available off-the-shelf items).

XX (7) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (section 740 of

Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of

Division D of Pub. L. 110-161).

__ (8) 52.219-3, Notice of Total HUBZone Set-Aside or Sole-Source Award (Jan 2011) (15 U.S.C.

657a).

__ (9) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN

2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (10) [Reserved]

__ (11)(i) 52.219-6, Notice of Total Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-6.

__ (iii) Alternate II (Mar 2004) of 52.219-6.

__ (12)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (13) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)).

__ (14)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)).

https://www.acquisition.gov/far/current/html/52_222.html#wp1151848 http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/52_222.html#wp1151848 http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/52_233_240.html#wp1113329 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_233_240.html#wp1113344 https://www.acquisition.gov/far/current/html/52_200_206.html#wp1137622 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+2+13++%2841%29%20%20AND%20%28%2841%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t09t12+37+408++%2810%29%20%252 https://www.acquisition.gov/far/current/html/52_200_206.html#wp1141983 http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/52_200_206.html#wp1144881 https://www.acquisition.gov/far/current/html/52_200_206.html#wp1141649 http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/52_200_206.html#wp1144992 https://www.acquisition.gov/far/current/html/52_207_211.html#wp1140926 http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/52_207_211.html#wp1146366 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1135955 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1135970 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136004 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136004 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136004 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136017 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136017 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136032 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20

Page 16 of 34 Part II – Contract Terms and Conditions Required to Implement Statutes and Executive Orders

__ (ii) Alternate I (Oct 2001) of 52.219-9.

__ (iii) Alternate II (Oct 2001) of 52.219-9.

__ (iv) Alternate III (Jul 2010) of 52.219-9.

__ (15) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).

__ (16) 52.219-16, Liquidated Damages—Subcontracting Plan…