10-K. CBI FORM 3 Services - Subcontractor Supplier Utilization Commitment.pdf

PDF 879 KB Posted

Attached to
Structural Engineering and Parking Deck Inspection Services State and local contract opportunity
Solicitation number
269-2026-160
Issued by
Mecklenburg County, Charlotte City, North Carolina

About this file

This document is a CBI Form 3: Subcontractor / Supplier Utilization Commitment form for the City of Charlotte's Structural Engineering and Parking Deck Inspection Services project (Contract #269.2026.160). The form is designed to capture information about Minority, Women, and Small Business Enterprise (M/W/SBE) subcontractors and suppliers that a proposer intends to use on the contract. It requires proposers to list all M/W/SBEs and non-M/W/SBE subcontractors and suppliers, including their names, descriptions of work/materials, and corresponding NIGP codes. The form must be submitted at the time of proposal opening, and failure to properly complete and submit it can result in proposal rejection.

The document outlines specific requirements for M/W/SBE participation, including the need to submit Letters of Intent within three business days of the City's request and maintaining the level of M/W/SBE participation throughout the contract duration. All subcontractors and suppliers must be registered in the City of Charlotte's vendor database. The form includes provisions for adding subcontractors or suppliers after initial submission, with strict guidelines for maintaining M/W/SBE goals and compliance with the CBI Administrative Procedures Manual. The proposer must certify compliance with the CBI Policy and agree that failure to properly document compliance could lead to proposal rejection.

View the file

Other files for this state and local contract opportunity

Other files attached to Structural Engineering and Parking Deck Inspection Services, newest first.
File Type Posted
11-L. Commercial Non-Discrimination.pdf PDF
5-F. Licensing and Certifications.pdf PDF
12-B. RFQ 269.2026.160 Structural Engineering and Parking Deck Inspection Services.pdf PDF
2-C. Sample Services Contract.pdf PDF
7-H. Certification Regarding Debarment.pdf PDF
1-A. Bonfire Instructions Procurement Portal.pdf PDF
3-D. Submission Form.pdf PDF
4-E. References Form.pdf PDF
6-G. Key Personnel and Other Resources.pdf PDF
8-I. Byrd Anti-Lobbying Certification.pdf PDF
9-J. Exceptions to RFQ.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 06-2023

269.2026.160 Structural Engineering and Parking Deck Inspection Services CBI FORM 3: Subcontractor / Supplier Utilization Commitment

This form MUST be submitted at the time of Proposal Opening. Copy this CBI Form 3 as needed.

Failure to properly complete and submit Form 3 with the Proposal constitutes grounds for rejection of the Proposal.

Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Proposer intends to use on the Contract FOR ALL TIERS.

M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the Contract Goal, and must list themselves below.

Proposer Name:

Project Name:

MWBE Goal: MBE Goal:

MSBE Goal: WBE Goal:

MWSBE Goal: SBE Goal:

List below all M/W/SBEs that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Proposal Opening Date.

M/W/SBE Vendor Name (Non-Hauling Services)

Description of work / materials NIGP Code

CBI FORM 3: Subcontractor / Supplier Utilization Commitment

List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract

Vendor Name Description of work / materials NIGP Commodity Code

Version 06-2023

Letters of Intent submitted upon notice from the City Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City (or within such longer time as may be communicated by the City in writing), Proposers must submit a separate Letter of Intent (CBI Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the Proposer. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. The Proposer is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.

Adding subcontractors or suppliers after submitting this form Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:

You must maintain the level of M/W/SBE participation stated in the Contract throughout the duration of the Contract, except as specifically allowed in Section 5

If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3 If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4 A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.

All Subcontractors and Suppliers must be registered with the City of Charlotte.

Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.

Signature Your signature below indicates that the undersigned firm certifies and agrees that:

(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,

(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and

Administrative Procedures Manual shall constitute grounds for rejection of your proposal.

Signature of Authorized Official Printed Name Title Submittal Date

File details come from the government source that posted it. Updated .