LIME SILO DEMOLITION CONTRACT SUMMARY

This is a project manual and invitation to bid for a public works construction project issued by the Lancaster Area Sewer Authority (LASA) located in Lancaster, Pennsylvania. The work consists of the complete demolition of a 12-foot diameter steel lime silo and its associated superstructure located above the sludge loading garage at the Blue Rock Water Resource Recovery Facility in Manor Township. The silo was installed approximately 35 years ago for sludge treatment to produce Class B biosolids but is no longer needed due to the Authority's transition to anaerobic digestion and sludge drying processes. Online sealed bids are due on April 16, 2026, at 11:00 a.m. prevailing time via the PennBid Program (www.PennBid.net), with bids to be publicly opened and read aloud at that time. Site visits may be arranged by contacting Brian Wilcox at 717-344-5812. The contract term is 90 calendar days for substantial completion and 110 calendar days for final completion. The contract documents include the project manual, general and supplementary conditions, specifications, drawings, and all required bonds and insurance certifications.

Each bid must be accompanied by bid security equal to 10 percent of the total bid amount in the form of a certified check, bank check, or bid bond. The lowest responsible and responsive bidder will be required to submit actual bid security documentation within three business days after bid opening. Liquidated damages are assessed at $100 per calendar day for failure to achieve substantial completion or final completion within the specified timeframes. The contract requires full compliance with Pennsylvania Prevailing Wage Act requirements, with applicable wage rates current as of February 25, 2026, ranging from approximately $41 to $107 per hour depending on worker classification. Contractors must provide performance and payment bonds, comprehensive general liability insurance with limits of $1,000,000 per occurrence and $2,000,000 aggregate, workers' compensation insurance, commercial auto liability coverage, and umbrella liability insurance of $10,000,000. The Lancaster Area Sewer Authority reserves the right to reject any or all bids and to waive any omissions, errors, or irregularities in bids submitted.

View the file

Other files

File Type Posted
2-PROJECT PLANS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

LIME SILO DEMOLITION

Contract No. 26-04-001

APRIL 2026

for the

Lancaster Area Sewer Authority 130 Centerville Road Lancaster, PA 17603

TABLE OF CONTENTS

TITLE PAGE NO.

BIDDING REQUIREMENTS

INVITATION TO BID 00010-1

INSTRUCTIONS TO BIDDERS 00100-1

BID FORM 00300-1

BID BOND 00350-1

EXPERIENCE QUESTIONNAIRE 00400-1

LIST OF PROPOSED SUBCONTRACTORS 00450-1

CONTRACT FORMS

AGREEMENT 00500-1

PERFORMANCE BOND 00610-1

PAYMENT BOND 00620-1

NON-COLLUSION AFFIDAVIT 00630-1

CONDITIONS OF THE CONTRACT

STANDARD GENERAL CONDITIONS OF THE

CONSTRUCTION CONTRACT EJCDC C-700

SUPPLEMENTARY CONDITIONS 00800-1

PENNSYLVANIA REQUIREMENTS 00805-1

PREVAILING WAGE REQUIREMENTS 00810-1

PREVAILING WAGE RATES

SPECIFICATIONS

TECHNICAL SPECIFICATION COVER SHEET

DIVISION 1 - GENERAL REQUIREMENTS

SUMMARY OF WORK 01010-1

DEMOLITION 024100-1

SECTION 00010-1

INVITATION TO BID – SECTION 00010

Project: LIME SILO DEMOLITION Project No. 26-04-001

Owner: LANCASTER AREA SEWER AUTHORITY

Lancaster, PA 17603-4087

Engineer: Scot A. Fertich, PE

Lancaster Area Sewer Authority

Lancaster, PA 17603

All questions about the meaning or intent of the Contract Documents shall be submitted via Penn Bid’s “Questions” tab. No questions will be accepted by phone, fax or direct e-mail.

Online sealed bids for this contract – LIME SILO DEMOLITION will be received by the Lancaster Area Sewer Authority via the PennBid Program (www.Pennbid.net) until Thursday, April 16, 2026 at 11:00 am local prevailing time. To schedule a site visit, contact Brian Wilcox at 717-344-5812.

The SCOPE OF WORK to be performed under this contract consists of the demolition of a 12-foot diameter steel Lime Silo and surrounding structure located on top of the sludge loading garage and all general requirements, appurtenances and incidental items of work as shown on the Drawings, specified in the Specifications or as directed by the Engineer. Bidding Documents may be examined without charge at the office of the Authority at the address shown above. Copies of the Contract Documents may be obtained at www.PennBid.net.

Bids may be modified or withdrawn via the PennBid Program at any time prior to the opening of the Bids.

After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a government agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids.

Each Bid must be accompanied by Bid security in the form of a certified check, bank check, or Bid bond (in the required form) for ten percent of the Bid total in the same fashion as all other submittals that are made with the Bid. The lowest responsible bidder shall submit the actual Bid security to the Authority within three (3) business days after bid opening.

https://protect.checkpoint.com/v2/r01/___http:/www.Pennbid.net___.YzJ1OmxhbmNhc3RlcnNld2VyYXV0aG9yaXR5OmM6bzo5ZTQzODU3NzQxMWVjODllN2I5Y2JjMjIxMDc2OTY3OTo3OmQ4YTc6NzdiMmU1OTBkYmFiNTM3MDg3N2YwOGQwMDNmOWM4OWMzMzQ4ZDhmMDFlMDAyMGY1Y2FmNzI5NTNmYzAxZDhjNDpwOlQ6VA https://protect.checkpoint.com/v2/r01/___http:/www.PennBid.net___.YzJ1OmxhbmNhc3RlcnNld2VyYXV0aG9yaXR5OmM6bzo5ZTQzODU3NzQxMWVjODllN2I5Y2JjMjIxMDc2OTY3OTo3OmNhODQ6ZjhkZDkzNmQwMTI0NWJiYmFjMjE0MzcxMmFiOTBmY2M3OWZhZTk2OTY1MGUwZGVmMjMyY2FiMzAyMDM2NDg3NDpwOlQ6VA

SECTION 00010-2

The LANCASTER AREA SEWER AUTHORITY hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, mistakes, defects or irregularities in any Bid.

LANCASTER AREA SEWER AUTHORITY

MICHAEL J. WOLGEMUTH

EXECUTIVE DIRECTOR

INSTRUCTIONS TO BIDDERS

SECTION 00100-1

SECTION 00100 - INSTRUCTIONS TO BIDDERS

BID CHECKLIST

At a minimum, each Bid must be submitted electronically on PennBid with the following additional information prior to the bid opening, as well as any additional information required by the Bidding Documents. This checklist is provided solely as a convenience to Bidders and compliance with this checklist is not a substitute for complying with the requirements of the Bidding Documents as a whole. Controlling requirements for these documents may appear elsewhere in the Bidding Documents in addition to the Section references provided below.

□ Bidder’s Experience Questionnaire. 5-year minimum documented experience record.

(See Sections 1.3, 1.13)

□ Bid Security (bond or check). (See Sections 1.7, 1.13)

□ Non-Collusion Affidavit. (See Sections 1.3, 1.13)

□ Evidence of Bidder’s qualification to do business in Pennsylvania (or covenant to obtain).

(See Sections 1.3, 1.13)

PART 1 GENERAL

1.1 DEFINED TERMS

A. Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract prepared by Engineer’s Joint Contract Documents Committee (EJCDC) have the meanings assigned to them in the General Conditions, as modified by the Supplementary Conditions.

B. Certain additional terms used in these Instructions to Bidders have meanings indicated below which are applicable to both the singular and plural thereof.

1. Bidder – One who submits a Bid directly to Owner as distinct from a sub-bidder, who submits a bid to a bidder.

2. Successful Bidder – The lowest, responsible and responsive Bidder to whom

Owner (on the basis of Owner’s evaluation as hereinafter provided) makes an award.

1.2 COPIES OF BIDDING DOCUMENTS

A. Complete sets of the Bidding Documents may be obtained online via the PennBid Program (www.PennBid.net).

B. Complete sets of Bidding Documents must be used in preparing Bids; the Owner assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

SECTION 00100-2

C. Copies of Bidding Documents are made available on the above terms only for the purpose of obtaining Bids on the Work and not to confer a license or grant for any other use.

1.3 QUALIFICATIONS OF BIDDERS

A. To demonstrate qualifications to perform the Work, each Bidder must submit with the Bid the qualification data indicated in the following Paragraphs of Article 1.3.

Additionally, each Bidder must be prepared to submit, upon Owner’s request, any documentation that may, in the opinion of the Owner, be necessary to assist in bid evaluation.

B. Bidders shall have a minimum of five (5) years of documented experience in projects of the same type as that described in the Project Manual.

C. To obtain information concerning qualifications of a Bidder, the Owner requires that a completed Experience Questionnaire (Section 00400) be submitted. Bidder shall include the completed Experience Questionnaire with the Bid.

D. Failure or refusal to submit documentation required by the Bidding Documents will be reason for rejection of the Bid.

1.4 EXAMINATION OF CONTRACT DOCUMENTS AND SITE

A. It is the responsibility of each Bidder before submitting a Bid:

1. To examine thoroughly the Bidding Documents;

2. To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work;

3. To consider federal, state, and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;

4. To study and carefully correlate Bidder’s knowledge and observations with the Bidding Documents and such other related data; and

5. To promptly notify Owner of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Bidding Documents.

B. Reference is made to the Supplementary Conditions for identification of:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the site.

2. Those drawings of physical conditions in or relating to existing surface and surface structures (except Underground Facilities) which are at or contiguous to the site.

3. To the extent provided in the Supplementary Conditions, Owner will make copies of such data available to any Bidder requesting them. These data are not part of the Bidding Documents.

C. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the site is based upon information and data furnished to Owner by owners of such Underground Facilities or others, and

SECTION 00100-3

Owner does not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions.

D. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities or unanticipated, and possible changes in the Bidding Documents due to differing conditions appear in Article 5 of the General Conditions, and as amended by the Supplementary Conditions.

E. Before submitting a Bid, each bidder will be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incidental thereto or which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price, and other terms and conditions of the Contract Documents.

F. On request, Owner will provide each Bidder access to the areas of the project to conduct such examinations, investigations, explorations, tests, and studies, as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up, and restore the site to its former condition upon completion of such explorations, investigations, tests and studies.

1. To gain access to each area of the proposed Work, contact the following individual:

Brian Wilcox – Plant Operations Director – (717) 344-5812

G. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of the Bidding Documents, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Bidding Documents, that if Bidder has any questions concerning the Bidding Documents, Bidder has given Owner written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Owner is acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

H. The provisions of this Article 1.4 do not apply to constituents of concern as defined by the General Conditions.

1.5 AVAILABILITY OF LANDS FOR WORK

A. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the

SECTION 00100-4

Work are identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents.

1.6 INTERPRETATIONS AND ADDENDA

A. All questions about the meaning or intent of the Bidding Documents shall be submitted in writing via PennBid’s “Questions” tab. Interpretations, or clarifications to the Contract Documents, considered necessary by Engineer in response to such questions, will be posted to PennBid and issued by Addenda. All Addenda will be posted within PennBid’s “Documents” tab. Notice will be emailed to all bidders of record at the time of issuance. Only questions answered by formal written Addenda will be binding. Oral statements, interpretations, or clarifications will not be binding, or legally effective. Any Addenda issued change the terms of the Bidding Documents.

B. It shall be the duty of each prospective Bidder to ascertain Addenda posted within PennBid’s Documents tab, if any, which may affect the work to be covered by their proposal, and to inform their prospective subcontractors thereof to the extent that they may be affected.

C. Failure of any Bidder to receive any Addenda, as provided for in this article, shall not relieve such Bidder from the obligation of their proposal.

D. Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner.

1.7 BID SECURITY

A. Each Bid must be accompanied by Bid security in the form of a certified check, bank check or Bid Bond (in the required form) for ten percent of the Bid total in the same fashion as all other submittals that are made with the Bid. The lowest responsible bidder shall submit the actual Bid security to the Authority within three (3) business days after bid opening.

B. The Bid security of Successful Bidder will be retained until such Bidder has executed the Agreement and furnished acceptable Contract bonds and insurance certificate, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish acceptable Contract bonds and insurance certificate within 15 days after the Notice of Award, Owner may annul the Notice of Award and the full amount of the Bid security of that Bidder will be forfeited.

C. The Owner will return the Bid security of all Bidders, except the apparent lowest responsible, responsive Bidder, within 30 days after the date of Bid opening; and upon execution of the Agreement and furnishing of acceptable Contract bonds and insurance certificate, the remaining Bid securities will be returned.

SECTION 00100-5

1.8 CONTRACT TIME

A. The number of calendar days within which, or the date by which, the Work is to be substantially completed (the Contract Time) are set forth in the Agreement.

1.9 LIQUIDATED DAMAGES

A. Provisions for liquidated and other damages, if any, are set forth in the Agreement.

1.10 SUBSTITUTIONS AND “OR EQUAL” ITEMS

A. Bids shall be based on Products covered in the Specifications and shown on the Drawings. When a Product specification includes the name or names of manufacturer(s), Bids shall be based on a Product which: (1) meets all Specification requirements; and (2) is produced by one of the manufacturers specifically named in the Specifications for that particular Product.

B. Requests for Product substitutions will not be considered prior to the Bid opening date. See General Conditions Paragraph 7.04 and 7.05 as modified by the Supplementary Conditions for procedures to be used in requesting substitutions after award of the Contract.

1.11 SUBCONTRACTORS

A. Paragraph 7.06 of the General Conditions sets forth requirements as to the approval of Subcontractors.

B. The Bidder shall submit, with the Bid, the name of the proposed first tier Subcontractor. If there is a pre-approved list of Subcontractors, the Bidder shall identify one and only one Subcontractor.

1.12 BID FORM

A. The Bid Form is available within PennBid’s “Bid” tab.

B. The Bid shall contain an acknowledgement of receipt of all Addenda.

C. The Bid Form may call for lump sum prices, unit prices, or a combination of both.

1. If the Bid Form calls for lump sum prices, the Bidder shall state a single lump sum price for the Work or single lump sum prices for each portion of the Work subject to a lump sum price as set forth in the Bid Form, as applicable. Any such lump sum price or prices shall include all the Work described in the Contract Documents as being part of the Work.

2. If the Bid Form calls for unit prices, the Bidder shall state a single unit price for each item to be furnished or work to be done as set forth in the Bid Form. The Bid Form sets forth opposite each item for which a unit price is required the Owner’s estimate of the quantity of units of such items which will be required in the prosecution of the Work.

D. Bid prices shall include all taxes of whatever nature applicable to the Work or performance thereof.

SECTION 00100-6

E. Owner may be exempt from sales and use taxes for certain items to be incorporated into the Work. Each Bidder shall obtain legal advice to determine how and to what extent the Owner’s tax exemption may be utilized by the Contractor. Owner will provide, at the Contractor’s request, documentation required to obtain applicable tax exemptions.

1.13 SUBMISSION OF BIDS

A. Sealed Bids shall be submitted electronically via the PennBid Program (www.PennBid.net) by the date and time indicated in the Advertisement for Bids.

B. Documents to be submitted electronically via PennBid along with the Bid are the Bid Bond form, the Bidder’s Experience Questionnaire, the Non-Collusion Affidavit and evidence of qualification to do business in Pennsylvania.

C. Upon Owner’s request, any Bidder shall submit original signed and notarized paper copies of the Bidder’s Experience Questionnaire, Non-Collusion Affidavit, evidence of qualification to do business in Pennsylvania and a financial statement. The financial statement shall consist of data which is current within the range of six months prior to the Bid opening date.

1.14 MODIFICATION AND WITHDRAWAL OF BIDS

A. Bids may be modified or withdrawn via the PennBid Program at any time up to the date and time indicated on Advertisement for Bids.

1.15 OPENING OF BIDS

A. Bids will be “opened” and (unless obviously non-responsive) made public via the PennBid Program at the time set forth in the Advertisement for Bids.

B. An abstract of the amounts of Base Bids and major Alternates (if any) will be made available to Bidders after the opening of Bids.

1.16 BIDS TO REMAIN SUBJECT TO ACCEPTANCE

A. Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. The Owner will either award the Contract within the applicable time period or reject all Bids, returning the Bid security to the Bidders. Thirty-day extensions of the date for the award may be made by the mutual written consent of the Owner and the apparent Successful Bidder.

1.17 AWARD OF CONTRACT

A. Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make any award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Owner also

SECTION 00100-7

reserves the right to waive all informalities not involving price, time or changes in the work and to negotiate contract terms with the Successful Bidder.

B. In evaluating Bids, Owner will consider the qualifications of Bidders, whether or not the Bids comply with the prescribed requirements, and such Alternates (if any), unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

C. Owner will consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for those portions of the Work for which the identity of additional subcontractors, suppliers, and other persons and organizations are requested by Owner prior to Notice of Award.

D. Owner may consider the operating costs, maintenance requirements, performance data, and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data are required to be submitted prior to the Notice of Award.

E. Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to Owner’s satisfaction within the prescribed time.

F. If the Contract is to be awarded, it will be awarded to the lowest responsible, responsive Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests of the Project.

G. If the Contract is to be awarded, Owner will give the apparent Successful Bidder a Notice of Award within the time limits prescribed in Article 1.16.

H. Bidders may be required by Owner, prior to and as a condition of Contract award, to execute and sign documents related to financing of the Project.

I. More than one bid from an individual, partnership, corporation, or an association under the same name or different names will not be considered. Reasonable grounds for believing that the Bidder is interested in more than one Bid for the same Work will cause the rejection of all Bids in which such Bidder is interested. Any or all Bids will be rejected if there is any reason for believing that collusion exists among any of the Bidders; participants in such collusion will not be considered in future bidding.

1.18 CONTRACT BONDS AND INSURANCE CERTIFICATE

A. Paragraphs 6.01 and 6.02 of the General Conditions set forth Owner’s requirements as to performance and payment bonds. When the apparent Successful Bidder delivers the signed Agreement to Owner, it must be accompanied by the required performance and payment bonds on the forms provided in the Bidding Documents.

B. Article 6 of the General Conditions, and the Supplementary Conditions, set forth Owner’s requirements as to insurance to be carried by the Contractor. When the apparent Successful Bidder delivers the signed Agreement to the Owner, it must be

SECTION 00100-8

accompanied by the required insurance certificate on the latest version of the Acord 25 Certificate of Insurance form. The Acord 25 form shall be modified to state: “All policies of insurance shown on this form shall not be cancelled or materially changed or renewal refused until at least thirty days’ prior written notice has been given to Owner and to each additional insured.”

1.19 SIGNING OF AGREEMENT

A. When Owner gives a Notice of Award to the apparent Successful Bidder, it will be accompanied by four (4) unsigned counterparts of the Agreement (each having a copy of the Bid submission attached), and four (4) each of the Payment Bond, and Performance Bond. Within 15 days thereafter, apparent Successful Bidder shall sign and deliver to the Owner the four (4) signed counterparts of the Agreement accompanied by the four (4) executed counterparts of the performance and payment bonds (with a power-of-attorney certificate attached to each) and four (4) originals of the required insurance certificate(s).

B. If the Owner finds the documents submitted by the apparent Successful Bidder acceptable, it will, within ten days after receipt of such documents, complete the signing of the Agreement and submit two fully executed copies to the Contractor.

C. If the Owner elects to issue a Notice to Proceed, such notice will accompany the fully executed copies of the Agreement. If no Notice to Proceed is issued, the Contract Time will commence to run as specified in Paragraph 4.1 of the General Conditions, as amended by Supplementary Conditions Paragraph SC-4.01.

1.20 PRE-BID MEETING

A. A non-mandatory pre-bid meeting will be held at the time and place set forth in the Advertisement for Bids. Owner will transmit to all prospective Bidders of record such Addenda as Owner considers necessary in response to questions arising at the meeting. Oral statements may not be relied upon and will not be binding or legally effective. Attendance at the pre-bid meeting is mandatory.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION 00100

BID FORM

SECTION 00300-1

BID FORM - SECTION 00300

BIDDER (Name and Address):

PROJECT

Bid Date: April 16, 2026 Project Identification: LIME SILO DEMOLITION

LASA PROJECT NO.: 26-04-001

THIS BID IS SUBMITTED TO: LANCASTER AREA SEWER AUTHORITY

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Bidding Documents for the Contract Price and within the Contract Time(s) and in accordance with the other terms and conditions of the Bidding Documents.

The undersigned Bidder submits this Bid with the understanding that the Owner reserves the right to reject any or all bids submitted.

2. Bidder accepts all the terms and conditions of the Invitation to Bid and

Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain open for sixty (60) days after the day of Bid opening, unless award is delayed due to required approvals of another governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. Thirty-day extensions of the date for the award may be made by the mutual written consent of the Owner and the apparent Successful Bidder.

Bidder agrees, if required by Owner prior to and as a condition of Contract award, to execute and sign any documents related to financing of the Project.

Bidder will sign and submit the Agreement with the Bonds and other documents required by the Bidding Documents within 15 days after the date of Owner’s Notice of Award.

3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

SECTION 00300-2

3.1 Bidder has examined copies of the Bidding Documents and of the following Addenda (receipt of all of which is hereby acknowledged):

Date Number

3.2 This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules or any group, association, organization, or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

Bidder has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work;

3.3 Bidder is familiar with and is satisfied as to all federal, state and local

Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.

3.4 Bidder covenants and warrants that they have had sufficient time to examine the site of the Work; that they have examined the site of the Work; and that they have based their Contract Prices on their own independent examination and investigation of the site, subsurface materials, and conditions and has not relied on any subsurface information furnished to them by Owner or Engineer. Bidder has examined the legal requirements (federal, state and local laws, ordinances, rules and regulation) and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as Bidder deems necessary.

3.5 Bidder is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Bidding Documents and Contract Documents.

3.6 Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Bidding Documents and Contract Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents and Contract Documents.

SECTION 00300-3

3.7 Bidder has given Owner written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

4. Bidder will complete the Work for the following lump sum price:

4.1 :

Item No. Description Unit Quantity Bid Unit

Price ($) Extended Price in

Figures ($)

Demolition of Lime Silo and surrounding structure including disposal of all existing materials

Lump Sum 1 $_____________

Total Lump Sum Price Bid Amount in Figures:

TOTAL LUMP SUM PRICE BID (Words)

5. The following documents are attached to and made a condition of this Bid:

5.1 Required Bid Security in the form of

5.2 Experience Questionnaire: Document 00400 (for use by Bidder and its first-tier subcontractor(s)).

5.3 Non-Collusion Affidavit: Document 00630.

5.4 Evidence of Bidder’s and its first-tier subcontractors’ qualification to do business in Pennsylvania or covenant to obtain such qualification prior to and as a condition for award of a Contract (if Bidder or first-tier subcontractor(s) is/are out of State).

6. Communications concerning this Bid will be addressed to (Bidder’s Contact

Person):

Phone:

Email:

SECTION 00300-4

7. The terms used in this Bid which are defined in the General Conditions included as part of the Bidding Documents have the meanings assigned to them in the General Conditions as modified by the Supplementary Conditions.

SUBMITTED on , 20 .

(If Bidder is an Individual)

Signature of Witness Signature of Individual

Trading and doing business as:

Name of Business

Address of Business

(If Bidder is a Partnership)

Name of Partnership

Address of Partnership

Signature of Witness Signature of Partner

SECTION 00300-5

(If Bidder is a Corporation)

Attest:

Name of Corporation

Signature of Secretary or Address of Principal Office Assistant Secretary

(Corporate Seal) State of Incorporation

Signature of President or Vice President

Type or print name below each signature.

END OF BID FORM

BID BOND

SECTION 00350-1

BID BOND - SECTION 00350

BIDDER (Name and Address): SURETY (Name and Address):

OWNER (Name and Address): LANCASTER AREA SEWER AUTHORITY

Lancaster, PA 17603-4087

PROJECT

Bid Date: April 16, 2026 Project Identification: LIME SILO DEMOLITION

LASA PROJECT NO.: 26-04-001

BOND

Date:

Amount:

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder the full face amount of this Bond.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents the executed Agreement required by the Bidding Documents and any Performance Bonds, Payment Bonds, Certificates of Insurance, or other documents required by the Bidding Documents and Contract Documents.

3. This obligation shall be null and void if:

a. Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or an extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any Performance Bonds, Payment Bonds, Certificates of Insurance, or other documents required by the Bidding Documents and Contract Documents, or

b. All Bids are rejected by Owner, or

c. Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof).

SECTION 00350-2

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt of Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award, provided that the time for issuing Notice of Award shall not in the aggregate exceed 120 days from Bid opening date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety, and in no case later than one year after Bid opening date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the county in which the Project is located.

8. Notice required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the first page of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage prepaid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of

Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of the Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The terms used in this Bid Bond which are defined in the General Conditions have the meaning assigned to them in the General Conditions as modified by the Supplementary Conditions.

SECTION 00350-3

(If Bidder is an Individual)

Signature of Witness Signature of Individual

Trading and doing business as:

Name of Business

Address of Business

(If Bidder is a Partnership)

Name of Partnership

Address of Partnership

SECTION 00350-4

(If Bidder is a Corporation)

(Corporation Surety)

Address of Office

Signature of Witness Signature of Attorney-in-fact

Attach an appropriate power of attorney, dated as of the same date as the Bond, evidencing the authority of the Attorney-in-fact to act in behalf of the corporation.

END OF BID BOND

EXPERIENCE QUESTIONNAIRE

SECTION 00400-1

EXPERIENCE QUESTIONNAIRE - SECTION 00400

PROJECT IDENTIFICATION: LIME SILO DEMOLITION

LASA PROJECT NUMBER: 26-04-001

SUBMITTED TO: LANCASTER AREA SEWER AUTHORITY

130 Centerville Road Lancaster, PA 17603-4087

(-Corporation BY: (-Partnership (BIDDER) (SUB-BIDDER) (-An Individual

PRINCIPAL OFFICE ADDRESS:

(The signer of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatories hereinafter made.)

1. What type of business if Bidder’s organization?

2. How many years had Bidder’s organization been performing work, as a contractor or subcontractor, of the type required for this Project?

3. Provide information on all projects currently in progress.

Contract Amount

Type of Work Completion Date

Name/Address of Owner

Name/ Address of Engineer/Architect

SECTION 00400-2

4. What projects, comparable to this Project, has Bidder’s organization completed within the last five years?

Contract Amount

Type of Work Completion Date

Name/Address of Owner

Name/ Address of Engineer/Architect

5. Has Bidder’s organization ever defaulted on any contract or failed to complete any contract?

If so, where and why?

SECTION 00400-3

6. List names, addresses, and phone numbers of individuals or organizations that can be contacted by Owner or Engineer to obtain references.

7. What is the construction experience of the principal individuals of Bidder’s organization?

Individual’s Name Present Position or Office

Magnitude and Type of Work

In What Capacity?

SECTION 00400-4

STATE OF

COUNTY OF

being duly sworn deposes and says that he is of Title Name of Organization and that the answers to the foregoing questions and all statements therein are true and correct.

Signature

Sworn to before me this Day of , 20 .

My commission expires

Signature of Notary Public

Type or print name below each signature

END OF EXPERIENCE QUESTIONNAIRE

LIST OF SUBCONTRACTORS

SECTION 00450-1

LIST OF PROPOSED SUBCONTRACTORS - SECTION 00450

PROJECT IDENTIFICATION: LIME SILO DEMOLITION

LASA PROJECT NO.: 26-04-001

SUBMITTED TO: LANCASTER AREA SEWER AUTHORITY

Lancaster, PA. 17603-4087

List proposed subcontracts as required in Instruction to Bidders.

Description of Subcontract Subcontractor’s Name Subcontractor’s Address

Signature

Typed or Printed Name

Date________________ __________________________________ Title

NOTE: This List of Proposed Subcontractors must be submitted with the Bid, and failure to submit will be considered justification for rejection of the Bid. Attach and Experience Questionnaire (Document 00400) for each of the Subcontractors listed above.

END OF LIST OF SUBCONTRACTORS

AGREEMENT

SECTION 00500-1

AGREEMENT - SECTION 00500

This Agreement made and entered into this day of , by and between LANCASTER AREA SEWER AUTHORITY, hereinafter called the Owner, and

A Corporation known as , Organized and existing under the laws of the State of hereinafter called the Contractor, Witnesseth, that the parties hereto for the consideration stated do mutually agree as follows:

Article 1 – SCOPE OF WORK

1.1 The Contractor agrees to furnish all labor, superintendence, materials, necessary equipment, and other utilities and facilities for, perform all work necessary for or incidental to, and perform all other obligations imposed by this Agreement for, the complete Work in connection with LIME SILO DEMOLITION herein called for, all in strict accordance with the Contract Documents as prepared by the Lancaster Area Sewer Authority.

1.2 The Contract Documents are defined in the General Conditions. The Contract Documents comprise the entire Agreement between Owner and Contractor and are incorporated in this Agreement and made a part hereof. The Contract Documents may only be altered, amended, or repealed as described in Paragraphs 3.5 and 3.6 of the General Conditions.

1.3 The Drawings for the Work covered under this Agreement consist of the following sheets:

DRAWING TITLE

COVER SHEET

2 SIDE VIEW

3 DEMOLITION DETAILS

ARTICLE 2 – CONTRACT TIMES

2.1 The Work will be substantially completed within 90 calendar days after the date when the Contract Times commence to run as provided in General Conditions Paragraph 4.01 as amended by the Supplementary Conditions and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 110 calendar days after the date when the Contract Times commence to run.

SECTION 00500-2

2.2 Liquidated Damages. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 2.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay Owner $100.00 for each calendar day that expires after the time specified in Paragraph 2.1 above for Substantial Completion until that Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 2.1 above for completion and readiness for final payment or any proper extension thereof granted by Owner, Contractor shall pay Owner $100.00 for each calendar day that expires after the time specified in Paragraph 2.1 above for completion and readiness for final payment. Between Commencement of the Contract Time, as defined in General Conditions Paragraph 4.01 as amended by the Supplementary Conditions, and the date of Substantial Completion, if Contractor shall neglect, refuse, or fail to meet the Milestones described below in Paragraph 2.3, Contractor shall pay Owner the liquidated damages amount shown in Paragraph 2.3 for each calendar day following the time specified in Paragraph 2.3 below that the Milestone Work remains uncompleted.

2.3 Milestones. The milestones specified below represent the maximum number of calendar days by which the specified items shall be completed to the extent described.

Contractor certifies that the number of calendar days, indicated on the Bid Form, hereto attached have been determined by Contractor in order to meet his/her obligation to perform the Work within the Contract Times specified under Paragraph 2.1. Contractor agrees to meet the Milestones specified below and agrees to pay the liquidated damages specified below if any such milestones are not met:

Item No. Description

Calendar Days After Date of Notice to

Proceed Milestones by Contractor

Liquidated Damages Amount

($) Per day

1. SUBSTANTIAL COMPLETION 90 100

3. FINAL COMPLETION 110 100

2.4 In addition to the liquidated damages amount(s) specified above under Paragraphs 2.2 and 2.3, Contractor also agrees to reimburse Owner for all administrative, legal, engineering and construction inspection/observation costs, associated with Contractor’s failure to meet any deadline(s) specified above under Paragraphs 2.1 and 2.3.

2.5 Alternate Damages: The Owner, at its option, may waive liquidated damages as provided in Paragraphs 2.2 and 2.3 and elect to recover from Contractor, Owner’s actual damages for such delay. Actual damages may include, without limitation, any fines or penalties imposed on Owner by any regulatory body plus all actual damages suffered by Owner as a result of such delay including, without limitation, loss of revenue, engineering fees and consulting fees, construction observation fees, and legal fees incurred by Owner as a result of such delay.

SECTION 00500-3

2.6 Regulatory Fines: When Project completion times are mandated by the Pennsylvania Department of Environmental Protection, or any other State, Federal, or local regulatory agency, the Contractor shall pay any fines established in Paragraphs 2.1 and 2.3 above. When the Owner elects to use the dollar amount established in Paragraph 2.2 to determine the amount of liquidated damages, the amount of the fines will be added to the established dollar amount. When the Owner elects to proceed in accordance with Paragraph 2.5, the amount of fines will be included in the amount of actual damages.

ARTICLE 3 – CONTRACT PRICE, PAYMENT, AND RETAINAGE

3.1 The Owner shall pay, and the Contractor shall receive and accept as full payment for the performance of the Contractor’s obligations hereunder, the price(s) stipulated in the Bid Form hereto attached and in the manner as specified in the General Conditions subject to the retainage set forth below.

3.2 Retainage:

3.2.1 The Owner shall withhold ten percent of the amount of approved Applications for Payment until the Work is 50% completed. When the Work is 50% completed, one-half of the amount retained by Owner shall be returned to Contractor; provided that the Engineer approves the payment of this portion of the retained amount; and, provided further, that the Contractor is making satisfactory progress and there is no specific cause for greater withholding.

3.2.2 After the Work is 50% completed, subsequent approved Applications for Payment shall be paid by Owner subject to withholding by Owner of five percent of each such approved Application for Payment so that the total amount withheld from Contractor shall not exceed five percent of the value of completed Work based on approved Applications for Payment.

3.2.3 In the event that a dispute arises between Owner and the Contractor, which dispute is based on increased costs incurred by one contractor occasioned by delays or other actions of another contractor, additional retainage in the sum of one and one-half times the amount of any possible liability may be withheld by the Owner from the Contractor until such times as a final resolution is agreed to by all parties directly or indirectly involved, unless the contractor causing the additional claim furnishes a Bond satisfactory to Owner to indemnify Owner against the claim.

3.3 Final Payment: Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer in accordance with said Paragraph 15.06.

3.4 Interest: The final payment if not paid when due in accordance with Paragraph

15.06 of the General Conditions shall bear interest at the rate of ten percent per annum or, when the Owner has issued bonds to finance the Project, at the rate of interest of the bond issue, whichever is less. No interest will be paid on progress payments.

SECTION 00500-4

ARTICLE 4 – CONTRACTOR’S REPRESENTATIONS

In order to induce Owner to enter into this Agreement, Contractor makes the following representations:

4.1 Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents including “technical data”.

4.2 Contractor has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work.

4.3 Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.

4.4 Contractor has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Article 5 of the General Conditions. Contractor accepts the determination set forth in Paragraph SC-5.03.B of the Supplementary Conditions of the extent of the “technical data” contained in such reports and drawings upon which Contractor is entitled to reply as provided in Paragraph Article 5 of the General Conditions. Contractor acknowledges that such reports and drawings are not Contract Documents and may not be complete for Contractor’s purposes. Contractor acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. Contractor has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site of otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents.

4.5 Contractor is aware of the general nature of work to be performed by Owner and others at the site that relates to the Work as indicated in the Contract Documents.

4.6 Contractor has correlated the information known to Contractor, information and observations obtained from visits to the site, reports, and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

SECTION 00500-5

4.7 Contractor has given Authority written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents and the written resolution thereof by Authority is acceptable to Contractor, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

ARTICLE 5 – MISCELLANEOUS

5.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions.

5.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

5.3 Owner and Contractor each binds itself, its partners, successors, assigns and legal representatives to…