1-LIMS RFP TNI2016 7 6 2026-Final (DNC)(8063872.1).pdf
PDF 418 KB Posted
- Attached to
- Laboratory Information Management System
- Solicitation number
- LIMS2026
- Issued by
- Utah
About this file
This is a Request for Proposals (RFP) issued by the Metropolitan Water District of Salt Lake & Sandy (Metro Water) for the procurement, implementation, and ongoing support of a Laboratory Information Management System (LIMS). The laboratory, located in Cottonwood Heights, Utah, is a NELAP-accredited environmental testing facility that processes approximately 3,300 samples monthly with 6 staff members, focusing on drinking water testing and microbiological analysis. The RFP was issued on July 6, 2026, with a proposal submission deadline of July 27, 2026, at 5:00 PM MST. Vendor demonstrations are scheduled for the week of August 3, 2026, with anticipated award notification on August 14, 2026, and board approval on August 17, 2026. The target contract start date is August 21, 2026, with a target go-live date of December 1, 2026. The selected vendor must provide a fully configured and tested LIMS installation (cloud-hosted/SaaS preferred), system integration with laboratory instruments and enterprise systems, user acceptance testing support, staff training across all roles, validation documentation for NELAP accreditation audits, and ongoing technical support and maintenance. All submissions must include an executive summary, technical proposal addressing all requirements, completed requirement response matrix, implementation plan and timeline, vendor qualifications with minimum three NELAP laboratory references, pricing proposal, and sample contract with Service Level Agreements.
The RFP establishes a comprehensive evaluation framework weighted 50% on functional and technical requirements, 20% on vendor qualifications and references, 20% on implementation/training/support, and 10% on pricing for a five-year total cost of ownership. Vendors must demonstrate minimum five years of experience implementing LIMS solutions in environmental laboratories with at least three current NELAP-accredited installations and U.S.-based technical support staff. Pricing must include software licensing, implementation fees, validation documentation, training, hardware costs, integration development, and annual maintenance and support for years 1-5, with price increases capped at 3-5% or CPI, whichever is lower. The contract requires vendor provision of a sample contract and SLA that ensure Metro Water retains data ownership, vendor provision of data export in open formats upon termination, compliance with 24-hour data breach notification requirements, annual security audit rights, a minimum two-year warranty, and 90-day termination for convenience or immediate termination for material breach provisions. The LIMS must achieve full compliance with all mandatory requirements in the TNI 2016 Standard for Accreditation of Environmental Laboratories and support integration with multiple instruments and software systems including Agilent, Shimadzu, Thermo Fisher Scientific, and Metrohm analytical equipment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice of Request for Proposals Laboratory Information Management System (LIMS)
Issued By:
Metropolitan Water District of Salt Lake & Sandy
3430 East Danish Rd Cottonwood Heights, UT 84093
RFP Number: [RFP-LIMS-2026-001]
Issue Date: July 6, 2026
Proposal Due Date: July 27, 2026 at 5:00 PM MST
Point of Contact: Josie Taber, Lab Supervisor
Contact Email: taber@mwdsls.gov
Contact Phone: 801-942-9651
NELAP Accreditation #: UT000172025-18
Accrediting Body: Utah Program
LIMS RFP Page 2 of 29
Table of Contents Table of Contents
1. Introduction and Background
1.1 Purpose
1.2 Laboratory Overview
1.3 Accreditation Context
2. Procurement Process and Schedule
2.1 Key Dates
2.2 Submission Instructions
2.3 Questions and Clarifications
3.1 Deliverables
3.2 Deployment Model
4. Functional and Technical Requirements
4.1 Sample Receipt and Chain of Custody
4.2 Work Orders, Test Methods, and Analyte Management
4.3 Quality Control and QC Acceptance
4.4 Instrument and Equipment Management
4.5 Results Entry, Review, and Reporting
4.6 Data Integrity, Audit Trail, and Electronic Records
4.7 Personnel Qualifications and Training Records
4.8 Document Control and Standard Operating Procedures
4.9 Nonconformances, Corrective Actions, and Complaints
4.10 Subcontracted Work Management
4.11 Integration and Interoperability
5. Vendor Qualifications and References
5.1 Required Vendor Experience
5.2 Client References
6. Implementation, Training, and Support
6.1 Implementation Plan
6.2 System Validation
6.3 Training
6.4 Ongoing Support and Maintenance
7. Pricing Proposal Requirements
8. Proposal Evaluation and Award
LIMS RFP Page 3 of 29
8.1 Evaluation Criteria
8.2 Evaluation Process
8.3 Demonstration Requirements
9. Contract Terms and Conditions Appendix A: Requirement Response Matrix Appendix B: TNI 2016 Standard Cross-Reference Appendix D: List of Accredited Methods Appendix E: List of Instruments & Software for Integration
LIMS RFP Page 4 of 29
1. Introduction and Background
1.1 Purpose
Metropolitan Water District of Salt Lake & Sandy (Metro Water) is soliciting proposals from qualified vendors for the procurement, implementation, and ongoing support of a Laboratory Information Management System (LIMS) for its laboratory (the Laboratory). The selected LIMS must fully support the Laboratory's operational workflows and, critically, must enable compliance with the TNI Standard for Accreditation of Environmental Laboratories, 2016 Edition (TNI 2016 Standard) as required for our NELAC Institute (TNI) accreditation under the National Environmental Laboratory Accreditation Program
(NELAP).
This Request for Proposals (RFP) defines the functional, technical, and regulatory requirements that the proposed LIMS must satisfy. Vendors are expected to provide detailed responses demonstrating their system's capabilities, implementation approach, pricing, and ongoing support model.
Terms used but not otherwise defined in this RFP have the meanings assigned to them in the Glossary (Appendix C).
1.2 Laboratory Overview
The Laboratory is a NELAP-accredited environmental testing laboratory holding accreditation in the following matrices and analyte groups:
• Drinking Water (Safe Drinking Water Act matrices) The Laboratory processes approximately 3300 samples per month and employs 6 staff members. About 50% of the samples received are for microbiological testing.
1.3 Accreditation Context
The Laboratory holds accreditation under NELAP, administered by the state of Utah. Our accreditation requires full alignment with the TNI 2016 Standard, which consists of:
• Volume 1: Management and Technical Requirements for Laboratories Performing Environmental Analysis
• Volume 2: General Requirements: Competence of Testing and Calibration Laboratories (ISO/IEC 17025:2005-based)
• Module 2: Quality Systems All LIMS functionality described in this RFP must be evaluated against these requirements. Mandatory requirements are non-negotiable; failure to meet any mandatory requirement will result in disqualification of the proposal.
LIMS RFP Page 5 of 29
2. Procurement Process and Schedule
2.1 Key Dates
RFP Issue Date: July 07, 2026
Deadline for Written Questions: July 20, 2026 at 5:00 PM MST
Metro Water’s Response to Questions: July 22, 2026
Proposal Submission Deadline: July 27, 2026 at 5:00 PM MST
Vendor Demonstrations (if applicable): Week of August 03, 2026
Anticipated Award Notification: August 14, 2026
Board Approval of Procurement August 17, 2026
Target Contract Start Date: August 21, 2026
Target Go-Live Date: December 1, 2026
2.2 Submission Instructions
Proposals are to be submitted electronically via the Utah Public Procurement Place (U3P) website (https://utah.bonfirehub.com/portal/?tab=openOpportunities) no later than Monday, July 27, 2026 at 5:00 PM MST with the subject line: "LIMS RFP Response – [Vendor Name] – [RFP Number]." It is the Vendor’s responsibility to assure submission of the proposal. Late submissions will not be accepted (special or extenuating circumstances may permit a grace period as deemed reasonable by the Metro Water). Metro Water will be the sole judge as to which proposals best meet the selection criteria. Metro Water reserves, at its sole discretion, the right to reject any or all responses received, to waive any submission requirements contained within this RFP, or to waive any irregularities in any submitted response.
Submissions must include
1. Executive summary (maximum 2 pages)
2. Technical proposal addressing all requirements in section 4
3. Completed requirement response matrix (Appendix A)
4. Implementation plan and timeline
5. Vendor qualifications and references (minimum 3 NELAP laboratory references)
6. Pricing proposal
7. Sample contract and Service Level Agreements (SLA)
Metro Water reserves the right to request clarification of any item in a proposal or to request additional information necessary to properly evaluate proposals. All requests for clarification and responses will be via email.
https://utah.bonfirehub.com/portal/?tab=openOpportunities
LIMS RFP Page 6 of 29
Metro Water’s RFP does not obligate the Metro Water to award any contract or to pay any costs incurred in the preparation of a proposal, interview, or associated materials.
Metro Water is subject to the Utah Government Records Access and Management Act, Title 63G, Chapter 2 of the Utah Code (GRAMA). If a vendor claims any portion of its proposal contains proprietary information, it is responsible for understanding and implementing any protection provided by GRAMA, including Section 63G-2-309, as that section may be amended. Metro Water will not be bound by any instructions or watermarks, stamps, or similar designations contained in a proposal, but rather, will only be governed by GRAMA and Metro Water’s GRAMA regulations. All materials become the property of Metro Water and may be returned at Metro Water’s option.
2.3 Questions and Clarifications
All questions must be submitted through the U3P website by July 20, 2026 at 5:00 PM MST. Vendor questions and answers will be distributed to all registered proposers via U3P website (https://utah.bonfirehub.com/portal/?tab=openOpportunities). No oral answers will be binding.
3. Scope of Work
3.1 Deliverables
The selected vendor shall deliver:
• Fully configured and tested LIMS installation (cloud-hosted / Software as a service (SaaS)
• Integration with Laboratory instruments and existing enterprise systems (see Appendix E)
• User acceptance testing (UAT) support and sign-off documentation
• Training for all staff categories (administrators, bench analysts, project managers, QA)
• System validation documentation suitable for NELAP accreditation audit review
• Ongoing technical support, maintenance, and software updates
3.2 Deployment Model
Describe the deployment model, including data residency, uptime SLAs, disaster recovery, and access during outages.
The preferred deployment would be SaaS.
For cloud-hosted systems, all data must reside on servers located within the United States and comply with applicable data security standards (see Section 4.6).
4. Functional and Technical Requirements Requirements are categorized by priority:
• Mandatory — System must fully support this capability; non-compliance disqualifies the proposal.
• High — Strongly preferred; absence must be explained and workaround proposed.
• Desirable — Adds value; vendors should describe capability or roadmap.
Proposals shall include a completed Requirement Response Matrix (Appendix A) that, for each requirement, indicates compliance level (Full Compliance / Partial Compliance (describe gap) / Not Supported) and provides explanatory notes where applicable.
https://utah.bonfirehub.com/portal/?tab=openOpportunities
LIMS RFP Page 7 of 29
4.1 Sample Receipt and Chain of Custody
The LIMS must manage the complete sample lifecycle from login through final reporting. The following requirements directly support TNI 2016 Vol. 1 Section 5 (Technical Requirements) and Module 2 (Quality Systems).
Requirement TNI 2016 Reference Priority
Record sample receipt date, time, and receiving analyst
TNI 2016 Vol.1 §5.8.3 Mandatory
Capture and enforce holding times with automated alerts before expiration
TNI 2016 Vol.1 §5.8.3;
EL-V1M2 §4.11
Mandatory
Assign unique, non-repeating sample IDs with laboratory tracking numbers
TNI 2016 Vol.1 §5.8.2 Mandatory
Record sample condition upon receipt (e.g., temperature, intact seals, headspace)
TNI 2016 Vol.1 §5.8.3 Mandatory
Document rejection of non-conforming samples with reason code and notification
TNI 2016 Vol.1 §5.8.3 Mandatory
Support container and preservative tracking per method requirements
TNI 2016 Vol.1 §5.8.3 Mandatory
Maintain electronic Chain of Custody (COC) with e-signature capability
TNI 2016 Vol.1 §5.8 High
Support subsampling and aliquot tracking with parent-child relationships
TNI 2016 Vol.1 §5.8.2 High
Barcode / RFID scanning for sample login and tracking
TNI 2016 Vol.1 §5.8 High
Track client-submitted COC vs.
laboratory COC discrepancies
TNI 2016 Vol.1 §5.8.3 Desirable
LIMS RFP Page 8 of 29
4.2 Work Orders, Test Methods, and Analyte Management
Requirement TNI 2016 Reference Priority
Associate specific EPA/ASTM/SM methods with each analyte and matrix.
See Appendix D
TNI 2016 Vol.1 §5.4.1 Mandatory
Restrict analysis to methods within the Laboratory's NELAP scope of accreditation
TNI 2016 Vol.1 §5.4.1;
NELAP policy
Mandatory
Track method revisions and enforce use of current approved version
TNI 2016 Vol.1 §5.4.4 Mandatory
Store method detection limits (MDL), practical quantitation limits (PQL), and reporting limits by method
TNI 2016 Vol.1 §5.4.6 Mandatory
Support method-specific QC requirements (blanks, spikes, duplicates, surrogates)
TNI 2016 Vol.1 §5.9 Mandatory
Manage client-specific reporting limits and turnaround time (TAT) requirements
TNI 2016 Vol.1 §5.10 High
Track subcontracted analysis with associated accreditation documentation
TNI 2016 Vol.1 §4.5 Mandatory
Flag results outside accredited scope or for out-of-scope methods
TNI 2016 Vol.1 §5.4.1 Mandatory
Support Client portal for logging in samples, sample status, and retrieving reports
High
LIMS RFP Page 9 of 29
4.3 Quality Control and QC Acceptance
This section is critical to NELAP compliance. TNI 2016 Vol. 1 Section 5.9 establishes specific QC requirements that must be enforced by LIMS.
Requirement TNI 2016 Reference Priority
Automatically generate required QC samples (method blanks, LCS, MS/MSD, field blanks, duplicates) based on method and batch size
TNI 2016 Vol.1 §5.9.1 Mandatory
Track QC sample placement within analytical batches
TNI 2016 Vol.1 §5.9.1 Mandatory
Calculate and evaluate QC acceptance criteria (% recovery, RPD, control limits) against method-specific limits
TNI 2016 Vol.1 §5.9.1 Mandatory
Flag QC failures and link to associated samples, preventing result reporting until resolved
TNI 2016 Vol.1 §5.9.2 Mandatory
Document corrective action and re-analysis for QC failures with full audit trail
TNI 2016 Vol.1 §5.9.2;
EL-V1M2 §4.11
Mandatory
Generate and maintain control charts (X-bar, range, Shewhart) for ongoing QC monitoring
TNI 2016 Vol.1 §5.9.1 High
Support proficiency testing (PT) sample tracking, results entry, and PT provider data import
TNI 2016 Vol.1 §5.9.3;
NELAP policy
Mandatory
Track and report MDL study data and initial demonstration of capability
(IDOC/ODOC)
TNI 2016 Vol.1 §5.4.6 Mandatory
Support ongoing demonstration of capability (ODOC) tracking with expiration alerts
TNI 2016 Vol.1 §5.9.1 Mandatory
Enable matrix-specific QC requirements (drinking water)
TNI 2016 Vol.1 §5.9 Mandatory
LIMS RFP Page 10 of 29
4.4 Instrument and Equipment Management
Requirement TNI 2016 Reference Priority
Maintain an inventory of all analytical instruments and equipment
TNI 2016 Vol.1 §5.5.1 Mandatory
Track instrument calibration schedules, calibration data, and calibration due dates with automated alerts
TNI 2016 Vol.1 §5.5.2 Mandatory
Store initial and continuing calibration verification (ICV/CCV) results with acceptance criteria
TNI 2016 Vol.1 §5.5.2 Mandatory
Link instrument calibration records to associated analytical results
TNI 2016 Vol.1 §5.5.2 Mandatory
Record instrument maintenance, service, and repair events
TNI 2016 Vol.1 §5.5.3 Mandatory
Flag results analyzed on instruments outside calibration or with failed calibrations
TNI 2016 Vol.1 §5.5.2 Mandatory
Support electronic data import from instruments (ASCII, CSV, EDD formats)
TNI 2016 Vol.1 §5.4.7 High
Track reference standards, reagents, and consumables with lot numbers and expiration dates
TNI 2016 Vol.1 §5.5.4 High
4.5 Results Entry, Review, and Reporting
Requirement TNI 2016 Reference Priority
Support multi-level results review workflow (analyst, supervisor, QA) with e-signature at each stage
TNI 2016 Vol.1 §5.10.2;
21 CFR Part 11
Mandatory
Apply and document all result qualifiers and data flags (e.g., J, B, E, HT, QC failure codes)
TNI 2016 Vol.1 §5.10.3 Mandatory
LIMS RFP Page 11 of 29
Prevent reporting of unreviewed or unapproved results
TNI 2016 Vol.1 §5.10.2 Mandatory
Generate client reports in configurable formats (PDF, Excel, EDDs)
TNI 2016 Vol.1 §5.10 Mandatory
Support Electronic Data Deliverables (EDDs) for regulatory submittal (e.g., EPA EQuIS, WQX, state formats)
TNI 2016 Vol.1 §5.10 High
Automatically apply dilution factors, moisture corrections, and result calculations
TNI 2016 Vol.1 §5.4.7 Mandatory
Support client-specific report templates and regulatory compliance statements
TNI 2016 Vol.1 §5.10.2 High
Track and document sample-level narrative comments and report flags
TNI 2016 Vol.1 §5.10.3 Mandatory
Generate Certificate of Analysis (CoA) with required laboratory identification and accreditation statement
TNI 2016 Vol.1 §5.10.2;
NELAP
Mandatory
Maintain record of all issued and revised reports with reason for amendment
TNI 2016 Vol.1 §5.10.4 Mandatory
4.6 Data Integrity, Audit Trail, and Electronic Records
TNI 2016 and NELAP place significant emphasis on data integrity. The LIMS must maintain a complete and unalterable audit trail consistent with the principles of ALCOA+ (Attributable, Legible, Contemporaneous, Original, Accurate, plus Complete, Consistent, Enduring, and Available).
Requirement TNI 2016 Reference Priority
Maintain a complete, tamper-evident audit trail of all data entries, edits, and deletions, capturing who, what, when, and reason for change
TNI 2016 EL-V1M2
§4.13; ALCOA+
Mandatory
Enforce role-based user access controls with unique user IDs and passwords
TNI 2016 EL-V1M2
§4.13
Mandatory
LIMS RFP Page 12 of 29
Support 21 CFR Part 11 compliant electronic signatures for result approval
21 CFR Part 11; TNI 2016 §5.10.2
Mandatory
Restrict deletion of records; require supervisor authorization and documented reason
TNI 2016 EL-V1M2
§4.13
Mandatory
Provide immutable raw data storage;
original values preserved after edits
TNI 2016 EL-V1M2
§4.13; ALCOA+
Mandatory
Generate audit trail reports filterable by user, date range, sample, or data field
TNI 2016 EL-V1M2
§4.13
Mandatory
Support data retention policies aligned with regulatory requirements (minimum 5–10 years)
TNI 2016 EL-V1M2
§4.13
Mandatory
Encrypt data at rest and in transit (AES- 256 minimum for cloud deployments)
NIST SP 800-53; SOC
Mandatory
Provide SOC 2 Type II compliance documentation (for SaaS/cloud deployments)
SOC 2 Mandatory
Generate automated backups with tested recovery procedures and documented RTO/RPO
TNI 2016 EL-V1M2
4.7 Personnel Qualifications and Training Records
Maintain personnel qualification records (education, experience, training) per analyst
TNI 2016 Vol.1 §5.2 Mandatory
Track initial and ongoing competency demonstrations by method and matrix
TNI 2016 Vol.1 §5.2.2 Mandatory
Issue automated alerts for expiring analyst qualifications or training requirements
TNI 2016 Vol.1 §5.2 High
LIMS RFP Page 13 of 29
Restrict sample analysis entry to analysts qualified for the applicable method and matrix
TNI 2016 Vol.1 §5.2 High
Record analyst assignments to each analytical result for traceability
TNI 2016 Vol.1 §5.2 Mandatory
4.8 Document Control and Standard Operating Procedures
Requirement TNI 2016 Reference Priority
Maintain a controlled document library for SOPs, methods, and forms with version control
TNI 2016 EL-V1M2
§4.3; Vol.1 §5.4.4
Mandatory
Enforce document approval workflow prior to release and track approval signatures
TNI 2016 EL-V1M2 §4.3 Mandatory
Prevent use of superseded document versions; automatically archive previous versions
TNI 2016 EL-V1M2 §4.3 Mandatory
Notify relevant staff of document updates and require acknowledgment
TNI 2016 EL-V1M2 §4.3 High
Link SOPs to associated methods, instruments, and analyte groups
TNI 2016 Vol.1 §5.4.4 High
4.9 Nonconformances, Corrective Actions, and Complaints
Record and track nonconformances including source, root cause, corrective action, and verification of effectiveness
TNI 2016 EL-V1M2
§4.9; §4.11
Mandatory
Link nonconformances to affected samples, results, QC batches, instruments, or personnel
TNI 2016 EL-V1M2
§4.11
Mandatory
Track corrective actions to closure with target dates and responsible party
TNI 2016 EL-V1M2
§4.11
LIMS RFP Page 14 of 29
Maintain a complaint log with resolution documentation and client notification records
TNI 2016 EL-V1M2 §4.8 Mandatory
Support preventive action (PA) documentation separate from corrective action
TNI 2016 EL-V1M2
§4.12
High
Provide management review reports aggregating QC failures, NCs, and CAPAs
TNI 2016 EL-V1M2
§4.15
High
4.10 Subcontracted Work Management
Identify and flag samples or analyses sent to a subcontracted laboratory
TNI 2016 Vol.1 §4.5 Mandatory
Store and verify subcontractor NELAP accreditation scope documentation
TNI 2016 Vol.1 §4.5 Mandatory
Import and review results from subcontractors with associated QC and qualifiers
TNI 2016 Vol.1 §4.5 Mandatory
Disclose subcontracted results on client reports with subcontractor identification
TNI 2016 Vol.1 §4.5;
§5.10.2
4.11 Integration and Interoperability
Provide documented, open API (REST or SOAP) for third-party integration
IT best practice High
Support bidirectional instrument data import (See Appendix E)
TNI 2016 Vol.1 §5.4.7 High
Export data to EQuIS, EPA WQX, and state-specific EDD formats
Regulatory EDD requirements
High
Integrate with billing/ERP systems via standard data exchange
Operational requirement Desirable
LIMS RFP Page 15 of 29
Support LIMS-to-LIMS data import for subcontractor result ingestion
TNI 2016 Vol.1 §4.5 Desirable
5. Vendor Qualifications and References
5.1 Required Vendor Experience
Vendors must demonstrate the following minimum qualifications:
• Minimum five years of experience implementing LIMS solutions in environmental testing laboratories
• At least three current client installations at NELAP-accredited laboratories using the proposed system
• Demonstrated experience with TNI 2016 Standard compliance documentation support
• U.S.-based technical support staff with environmental laboratory knowledge
5.2 Client References
Provide contact information for a minimum of three (3) NELAP-accredited laboratory references currently using the proposed LIMS version. References must be willing to be contacted by the Metro Water’s evaluation team. For each reference, provide:
• Laboratory name, location, and NELAP accreditation number
• Contact name, title, phone, and email
• Number of users, sample volume, and matrices analyzed
• Implementation date and current LIMS version
• Summary of any compliance-related customizations performed
6. Implementation, Training, and Support
6.1 Implementation Plan
Vendors must provide a detailed implementation plan including:
• Project plan with milestones, deliverables, and timelines from contract award through go-live
• Roles and responsibilities (vendor and Laboratory)
• Data migration strategy, including data mapping, validation, and acceptance testing protocol
• System configuration and customization approach for TNI/NELAP-specific workflows
• Risk register and mitigation strategies
• Go-live and parallel operation (parallel run) plan
• Post-go-live hyper care support plan
6.2 System Validation
The vendor must provide comprehensive validation documentation demonstrating LIMS fitness for purpose under NELAP audit requirements. This must include:
• Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) documentation
• Validation test scripts and expected results
• Gap analysis against TNI 2016 Standard requirements
LIMS RFP Page 16 of 29
• Ongoing validation support for system updates or configuration changes
6.3 Training
Propose a training plan covering:
• System administrator training (configuration, user management, backup/recovery)
• Bench analyst training (sample login, result entry, QC workflows)
• Project manager / client services training (work order management, reporting)
• QA manager training (QC review, audit trail review, nonconformance management)
• Train-the-trainer materials for future staff onboarding
• Access to online training portal or recorded sessions post-implementation
6.4 Ongoing Support and Maintenance
Describe your support model including:
• Help desk availability (hours, response time SLAs by severity level)
• Software update and version management policy
• Customer notification process for regulatory-driven updates (e.g. new TNI standard requirements)
• Account management and annual system review process
• User community / peer network access
7. Pricing Proposal Requirements Provide a total cost of ownership (TCO) breakdown including:
Software Licensing: Annual license or subscription fees (all modules required to meet this
RFP)
Implementation Fees: Project management, configuration, customization, data migration
Validation Documentation: IQ/OQ/PQ package preparation
Training: All training described in Section 6.3
Hardware (if applicable): Server, client hardware, barcode scanners, etc.
Integration Development: Instrument interfaces, EDD exports, API integrations
Annual Maintenance & Support:
Years 1–5 (itemized separately)
Optional Add-Ons: Describe and price separately (e.g., mobile apps, advanced analytics, customer portal)
Clearly identify any costs not included in the above that may be required to meet the full scope of this RFP. Price increases in Years 2–5 must be capped at no more than 3 – 5 % or CPI, whichever is lower.
LIMS RFP Page 17 of 29
8. Proposal Evaluation and Award
8.1 Evaluation Criteria
Proposals will be evaluated by the LIMS Selection Committee using the following weighted criteria:
Evaluation Criterion Max Points Weight Vendor Score
Weighted Score
1. Functional and Technical Requirements
50 50%
2. Vendor Qualifications and References
20 20%
3. Implementation, Training, and Support
20 20%
4. Pricing / Total Cost of Ownership (5-yr)
10 10%
TOTAL 100 100%
Vendors scoring below 70% of available points in the Functional and Technical requirements category will not be considered further, regardless of total score.
8.2 Evaluation Process
1. Initial responsiveness review — all mandatory requirements must be marked full compliance
2. Scoring by Evaluation Committee using criteria above
3. Reference checks for top two to three vendors
4. Live system demonstration (virtual or on-site) by top two or three proposals — scored separately as set out below
5. Price proposal evaluation
6. Award recommendation and contract negotiation
8.3 Demonstration Requirements
Vendors invited to demonstrate must show live system functionality including:
• Sample login with holding time enforcement
• Analytical batch QC setup and automatic QC failure flagging
• Multi-level result review and electronic signature workflow
• Audit trail query and reporting
• Certificate of Analysis generation
• Control chart display for a QC parameter
• Nonconformance entry and corrective action tracking
• Instrument interfacing and automated data import (raw data capture, timestamps, traceability)
• Electronic record retention and retention period configuration
LIMS RFP Page 18 of 29
• User roles/permissions matrix and configurable access controls (least privilege)
• Time-synchronized timestamps and time zone handling (immutable)
• System validation evidence and validation status tracking (IQ/OQ/PQ records)
• Method management (method versions, approvals, applicability to sample types)
• Sample chain-of-custody and tracking (sample receipt, custody transfers, hold/release)
• Batch/sample lineage (linking samples → analyses → results → QC)
• Calculation traceability and configurable calculation formulas with auditability
• Data review workflows with reviewer comments, sign-offs, and escalation rules
• Reporting templates and tamper-evident report generation (including metadata)
• Calibration management (calibration events, certificates, due/overdue alerts)
• LOD/LOQ and QC limit management and documentation
• Field/sample acceptance/rejection rules and automated holds for invalid samples
• Exportable audit trail and data in machine-readable format (CSV/XML)
• Electronic signature compliance (binding signatures, reasons, and timestamps)
• Data integrity controls (checksums, write-once audit logs, immutability)
• Training records and competency tracking linked to user accounts
• Security controls: encryption (at rest/in transit) and patch/update management
• Third-party/cloud hosting details and vendor responsibilities (data ownership)
• Capability to demonstrate corrective action verification and CAPA closure evidence
• Change control log and version history for configurations and system updates
• Configurable retention and purge policies with secure deletion workflows
• Inter-lab data exchange and proficiency testing result handling (if applicable)
Demonstration Evaluation Scoring
Each vendor demonstration will be scored by the Evaluation Committee using the criteria below. Scores reflect the quality and completeness of the live demonstration only. Rating scale: 0 = not demonstrated;
partial credit at evaluator discretion up to the maximum points shown. Demonstration scores will be added to the evaluation criteria scores.
Demonstration Criteria Max Points Score Notes
Audit Trail and Data Integrity (ALCOA+) 5
Calibration Management 5
Calibration Management Linked to Results 5
Certificate of Analysis Report Generation 5
CMDP / EDD Export 5
Control Chart Display for a QC Parameter 5
Corrective Action Workflows 5
LIMS RFP Page 19 of 29
Data Review Workflows 5
Document Control Process 5
Employee Training Record 5
Exportable Audit Trail 5
Field/Sample Acceptance 5
Instrument Interfacing and Automated Data Importing
Inter-lab Data Exchange 5
Multi-Level Result Review and E-Signature Workflow
Nonconformance and Corrective Action Tracking
QC Batch Management and Failure Flagging 5
Record Retention 5
Sample Login and Holding Time Enforcement 5
User Roles and Access Controls 5
TOTAL 100
9. Contract Terms and Conditions Vendor shall supply a sample contract and SLA. Such contract and SLA (as applicable) shall contain the following provisions:
• Ownership of all data and configurations always remains with the Metro Water
• Vendor must provide data export in open, non-proprietary formats upon contract termination
• All data must be available for regulatory audit and legal discovery
• Vendor must notify Metro Water of any data breach within 24 hours of discovery
• Metro Water retains the right to audit vendor security practices annually
• A warranty period of at least 2 years
• If Vendor receives notice of a defect or non-conformance during the warranty period, Vendor will, at its option, repair or replace the affected Product, including labor, shipping and handling, LIMS RFP Page 20 of 29 training, and any other costs associated with repair or replacement. Vendor will pay expenses for return of such Product to Vendor and for shipment of the repaired or replacement Product.
• In the event the LIMS does not function as warranted and is not repaired or replaced within 21 business days after notice to Vendor, Vendor will reimburse Metro Water for reasonable costs of replacing the LIMS, including labor for removal and installation.
• Termination for convenience: 90-day notice by either party; termination for cause: immediate upon material breach
Metro Water shall be the sole determiner of the acceptability of any contracts or SLA. Please see Utah Code Section 63G-6a-1203 for provisions that are void and unenforceable and will not be accepted by Metro Water, and note certain provisions that are required by law to be included (see Utah Code §§ 63G- 12-302, 63G-27-201).
After the selection process is complete, Metro Water will either enter into the provided contract / SLA with the top-ranked vendor (if acceptable to Metro Water) or negotiate changes to the contract / SLA with the top-ranked vendor. If any such negotiations are not successful, Metro Water may award the contract to, or negotiate with, the second highest-ranked vendor.
LIMS RFP Page 21 of 29
Appendix A: Requirement Response Matrix Complete this matrix for every requirement listed in Section 4. For each row, mark compliance level and provide explanatory notes where applicable.
Requirement Response Matrix Requirement TNI 2016 Reference Compliance Level (Full, Partial, Not Supported) Vendor Notes / Details
Record sample receipt date, time, and receiving analyst
TNI 2016 Vol.1 §5.8.3
Capture and enforce holding times with automated alerts before expiration
TNI 2016 Vol.1
§5.8.3; EL-V1M2
§4.11
Assign unique, non-repeating sample IDs with laboratory tracking numbers
TNI 2016 Vol.1 §5.8.2
Record sample condition upon receipt (e.g., temperature, intact seals, headspace)
TNI 2016 Vol.1 §5.8.3
Document rejection of non-conforming samples with reason code and notification
TNI 2016 Vol.1 §5.8.3
Support container and preservative tracking per method requirements
TNI 2016 Vol.1 §5.8.3
Maintain electronic Chain of Custody (COC) with e-signature capability
TNI 2016 Vol.1 §5.8
Support subsampling and aliquot tracking with parent-child relationships
TNI 2016 Vol.1 §5.8.2
Barcode / RFID scanning for sample login and tracking TNI 2016 Vol.1 §5.8 Track client-submitted COC vs.
laboratory COC discrepancies
TNI 2016 Vol.1 §5.8.3
Associate specific EPA/ASTM/SM methods with each analyte and matrix. See Appendix D
TNI 2016 Vol.1 §5.4.1
Restrict analysis to methods within the Laboratory's NELAP scope of accreditation
TNI 2016 Vol.1 §5.4.1; NELAP policy
Track method revisions and enforce use of current approved version
TNI 2016 Vol.1 §5.4.4
Store method detection limits (MDL), practical quantitation limits (PQL), and reporting limits by method
TNI 2016 Vol.1 §5.4.6
Support method-specific QC requirements (blanks, spikes, duplicates, surrogates)
TNI 2016 Vol.1 §5.9
LIMS RFP Page 22 of 29
Manage client-specific reporting limits and turnaround time (TAT)
TNI 2016 Vol.1 §5.10
Track subcontracted analysis with associated accreditation documentation
TNI 2016 Vol.1 §4.5
Flag results outside accredited scope or for out-of-scope methods
TNI 2016 Vol.1 §5.4.1
Support Client portal for logging in samples, sample status, and retrieving reports
Automatically generate required QC samples (method blanks, LCS, MS/MSD, field blanks, duplicates) based on method and batch size
§5.9.1
Track QC sample placement within analytical batches
TNI 2016 Vol.1 §5.9.1
Calculate and evaluate QC acceptance criteria (% recovery, RPD, control limits) against method-specific limits
§5.9.1
Flag QC failures and link to associated samples, preventing result reporting until resolved
TNI 2016 Vol.1 §5.9.2
Document corrective action and re-analysis for QC failures with full audit trail
TNI 2016 Vol.1
§5.9.2; EL-V1M2
§4.11
Generate and maintain control charts (X-bar, range, Shewhart) for ongoing QC monitoring
TNI 2016 Vol.1 §5.9.1
Support proficiency testing (PT) sample tracking, results entry, and PT provider data import
TNI 2016 Vol.1 §5.9.3; NELAP policy
Track and report MDL study data and initial demonstration of capability (IDOC/ODOC)
TNI 2016 Vol.1 §5.4.6
Support ongoing demonstration of capability (ODOC) tracking with expiration alerts
TNI 2016 Vol.1 §5.9.1
Enable matrix-specific QC requirements (drinking water) TNI 2016 Vol.1 §5.9 Maintain an inventory of all analytical instruments and equipment
TNI 2016 Vol.1 §5.5.1
Track instrument calibration schedules, calibration data, and calibration due dates with automated alerts
§5.5.2
Store initial and continuing calibration verification (ICV/CCV) results with acceptance criteria
§5.5.2
LIMS RFP Page 23 of 29
Link instrument calibration records to associated analytical results
TNI 2016 Vol.1 §5.5.2
Record instrument maintenance, service, and repair events
TNI 2016 Vol.1 §5.5.3
Flag results analyzed on instruments outside calibration or with failed calibrations
TNI 2016 Vol.1 §5.5.2
Support electronic data import from instruments (ASCII, CSV, EDD formats)
TNI 2016 Vol.1 §5.4.7
Track reference standards, reagents, and consumables with lot numbers and expiration dates
TNI 2016 Vol.1 §5.5.4
Support multi-level results review workflow (analyst, supervisor, QA) with e-signature at each stage
TNI 2016 Vol.1 §5.10.2; 21 CFR Part
Apply and document all result qualifiers and data flags (e.g., J, B, E, HT, QC failure codes)
TNI 2016 Vol.1 §5.10.3
Prevent reporting of unreviewed or unapproved results
TNI 2016 Vol.1 §5.10.2
Generate client reports in configurable formats (PDF, Excel, EDDs)
Support Electronic Data Deliverables (EDDs) for regulatory submittal (e.g., EPA EQuIS, WQX, state formats)
Automatically apply dilution factors, moisture corrections, and result calculations
TNI 2016 Vol.1 §5.4.7
Support client-specific report templates and regulatory compliance statements
TNI 2016 Vol.1 §5.10.2
Track and document sample-level narrative comments and report flags
TNI 2016 Vol.1 §5.10.3
Generate Certificate of Analysis (CoA) with required laboratory identification and accreditation statement
§5.10.2; NELAP
Maintain record of all issued and revised reports with reason for amendment
TNI 2016 Vol.1 §5.10.4
Maintain a complete, tamper-evident audit trail of all data entries, edits, and deletions, capturing who, what, when, and reason for change
TNI 2016 EL-V1M2
§4.13; ALCOA+
Enforce role-based user access controls with unique user IDs and passwords
LIMS RFP Page 24 of 29
Support 21 CFR Part 11 compliant electronic signatures for result approval
21 CFR Part 11; TNI 2016 §5.10.2
Restrict deletion of records; require supervisor authorization and documented reason
TNI 2016 EL-V1M2
§4.13
Provide immutable raw data storage; original values preserved after edits
TNI 2016 EL-V1M2
§4.13; ALCOA+
Generate audit trail reports filterable by user, date range, sample, or data field
TNI 2016 EL-V1M2
§4.13
Support data retention policies aligned with regulatory requirements (minimum 5–10 years)
Encrypt data at rest and in transit (AES-256 minimum for cloud deployments)
NIST SP 800-53;
SOC 2
Provide SOC 2 Type II compliance documentation (for SaaS/cloud deployments)
SOC 2
Generate automated backups with tested recovery procedures and documented RTO/RPO
TNI 2016 EL-V1M2
§4.13
Maintain personnel qualification records (education, experience, training) per analyst
TNI 2016 Vol.1 §5.2
Track initial and ongoing competency demonstrations by method and matrix
TNI 2016 Vol.1 §5.2.2
Issue automated alerts for expiring analyst qualifications or training
Restrict sample analysis entry to analysts qualified for the applicable method and matrix
Record analyst assignments to each analytical result for traceability TNI 2016 Vol.1 §5.2 Maintain a controlled document library for SOPs, methods, and forms with version control
TNI 2016 EL-V1M2
§4.3; Vol.1 §5.4.4
Enforce document approval workflow prior to release and track approval signatures
TNI 2016 EL-V1M2
§4.3
Prevent use of superseded document versions; automatically archive previous versions
TNI 2016 EL-V1M2
§4.3
Notify relevant staff of document updates and require acknowledgment
§4.3
LIMS RFP Page 25 of 29
Link SOPs to associated methods, instruments, and analyte groups
TNI 2016 Vol.1 §5.4.4
Record and track nonconformances including source, root cause, corrective action, and verification of effectiveness
§4.9; §4.11
Link nonconformances to affected samples, results, QC batches, instruments, or personnel
TNI 2016 EL-V1M2
§4.11
Track corrective actions to closure with target dates and responsible party
TNI 2016 EL-V1M2
§4.11
Maintain a complaint log with resolution documentation and client notification records
TNI 2016 EL-V1M2
§4.8
Support preventive action (PA) documentation separate from corrective action
TNI 2016 EL-V1M2
§4.12
Provide management review reports aggregating QC failures, NCs, and CAPAs
TNI 2016 EL-V1M2
§4.15
Identify and flag samples or analyses sent to a subcontracted laboratory
Store and verify subcontractor NELAP accreditation scope documentation
Import and review results from subcontractors with associated QC and qualifiers
Disclose subcontracted results on client reports with subcontractor identification
TNI 2016 Vol.1 §4.5;
§5.10.2
Provide documented, open API (REST or SOAP) for third-party integration
IT best practice
Support bidirectional instrument data import (See Appendix E)
TNI 2016 Vol.1 §5.4.7
Export data to EQuIS, EPA WQX, and state-specific EDD formats
Regulatory EDD requirements
Integrate with billing/ERP systems via standard data exchange
Operational requirement
Support LIMS-to-LIMS data import for subcontractor result ingestion TNI 2016 Vol.1 §4.5
LIMS RFP Page 26 of 29
Appendix B: TNI 2016 Standard Cross-Reference The table below maps major TNI 2016 Standard sections to corresponding LIMS functional areas addressed in this RFP.
TNI 2016 Section Topic RFP Section(s)
Vol.1 §5.2 Personnel Competence and Qualifications
Section 4.7 of this RFP
Vol.1 §5.4.1 Method Selection and Verification Section 4.2 of this RFP
Vol.1 §5.4.4 Method Documentation and SOPs Section 4.8 of this RFP
Vol.1 §5.4.6 MDL / Reporting Limits Section 4.2 of this RFP
Vol.1 §5.4.7 Data Integrity / Instrument Data Section 4.4, 4.6 of this RFP
Vol.1 §5.5 Equipment and Calibration Section 4.4 of this RFP
Vol.1 §5.8 Sampling and Sample Management
Section 4.1 of this RFP
Vol.1 §5.9 Quality Control Section 4.3 of this RFP
Vol.1 §5.10 Reporting of Results Section 4.5 of this RFP
Vol.1 §4.5 Subcontracted Work Section 4.10 of this RFP
EL-V1M2 §4.3 Document Control Section 4.8 of this RFP
EL-V1M2 §4.8 Complaints Section 4.9 of this RFP
EL-V1M2 §4.9 Control of Nonconforming Work Section 4.9 of this RFP
EL-V1M2 §4.11 Corrective Action Section 4.9 of this RFP
EL-V1M2 §4.12 Preventive Action Section 4.9 of this RFP
EL-V1M2 §4.13 Control of Records Section 4.6 of this RFP
EL-V1M2 §4.15 Management Reviews Section 4.9 of this RFP
LIMS RFP Page 27 of 29
Appendix C: Glossary
ALCOA+ Attributable, Legible, Contemporaneous, Original, Accurate + Complete, Consistent, Enduring, Available — data integrity framework
CAPA Corrective Action / Preventive Action
CoA Certificate of Analysis
CCV Continuing Calibration Verification
EDD Electronic Data Deliverable
IDOC/ODOC Initial Demonstration of Capability / Ongoing Demonstration of capability
IQ/OQ/PQ Installation / Operational / Performance Qualification
LCS/LCSD Laboratory Control Sample / Laboratory Control Sample Duplicate
MDL Method Detection Limit
MS/MSD Matrix Spike / Matrix Spike Duplicate
NELAP National Environmental Laboratory Accreditation Program
NELAC National Environmental Laboratory Accreditation Conference (former name of TNI)
PQL Practical Quantitation Limit
RPD Relative Percent Difference
SaaS Software as a Service
SLA Service Level Agreement
SOP Standard Operating Procedure
TCO Total Cost of Ownership
TNI The NELAC Institute
TNI 2016 TNI Standard for Accreditation of Environmental Laboratories, 2016 Edition
UAT User Acceptance Testing
LIMS RFP Page 28 of 29
Appendix D: List of Accredited Methods
SM 2540 D – Total Suspended Solids Clean Water Act
SM 4500-H+ B - pH Safe Drinking Water Act
SM3500-Ca B – Calcium Hardness Safe Drinking Water Act
SM 9215 E - Simplate Safe Drinking Water Act
SM 9223 – Colilert & Quantitray Safe Drinking Water Act
SM 2130 B - Turbidity Safe Drinking Water Act
SM 2150 B - Odor Safe Drinking Water Act
SM 2320 B – Alkalinity as CaCO3 Safe Drinking Water Act
SM 2340 C – Total Hardness Safe Drinking Water Act
SM 2510 B - Conductivity Safe Drinking Water Act
SM 2540 C – Total Dissolved Solids Safe Drinking Water Act
SM 4500-Cl G – Residual Chlorine Safe Drinking Water Act
SM 5310 B – High Combustion TOC/DOC Safe Drinking Water Act
SM 5910 B – UV 254 Safe Drinking Water Act
EPA 200.8 – Metals By ICP MS Safe Drinking Water Act
EPA 300.0 - Safe Drinking Water Act
EPA 300.1 – Bromate, Bromide Safe Drinking Water Act
EPA 524.2 – THM’s Safe Drinking Water Act
EPA 552.2 – HAA’s Safe Drinking Water Act
LIMS RFP Page 29 of 29
Appendix E: List of Instruments & Software for Integration
Manufacturer Instrument Software
Metrohm
800 Dosino Tiamo Version 2.4 Build 109
Agilent GC-7890A, MSD-5975C, Purge & Trap, Autosampler
MSD Chemstation Version E.02.00.493
Thermo Fisher Scientific
GC, Trace 1300 Chromeleon, Version 7.2.8
Shimadzu TOC-L CPH TOC-Control L Ver 1.09
Theroscientific Ion Chromatograph Chromeleon, Version 7.2.8
Agilent ICP MS 7850 Mass Hunter Software 5.2
Shimadzu UV-1800
UV Probe
HACH TU5200 Turbidimeter
End of Request for Proposal
| Table of Contents |
| 1. Introduction and Background |
| 1.1 Purpose |
| 1.2 Laboratory Overview |
| 1.3 Accreditation Context |
| 2. Procurement Process and Schedule |
| 2.1 Key Dates |
| 2.2 Submission Instructions |
| 2.3 Questions and Clarifications |
| 3. Scope of Work |
| 3.1 Deliverables |
| 3.2 Deployment Model |
| 4. Functional and Technical Requirements |
| 4.1 Sample Receipt and Chain of Custody |
| 4.2 Work Orders, Test Methods, and Analyte Management |
| 4.3 Quality Control and QC Acceptance |
| 4.4 Instrument and Equipment Management |
| 4.5 Results Entry, Review, and Reporting |
| 4.6 Data Integrity, Audit Trail, and Electronic Records |
| 4.7 Personnel Qualifications and Training Records |
| 4.8 Document Control and Standard Operating Procedures |
| 4.9 Nonconformances, Corrective Actions, and Complaints |
| 4.10 Subcontracted Work Management |
| 4.11 Integration and Interoperability |
| 5. Vendor Qualifications and References |
| 5.1 Required Vendor Experience |
| 5.2 Client References |
| 6. Implementation, Training, and Support |
| 6.1 Implementation Plan |
| 6.2 System Validation |
| 6.3 Training |
| 6.4 Ongoing Support and Maintenance |
| 7. Pricing Proposal Requirements |
| 8. Proposal Evaluation and Award |
| 8.1 Evaluation Criteria |
| 8.2 Evaluation Process |
| 8.3 Demonstration Requirements |
| 9. Contract Terms and Conditions |
| Appendix A: Requirement Response Matrix |
| Appendix B: TNI 2016 Standard Cross-Reference |
| Appendix C: Glossary |
| Appendix D: List of Accredited Methods |
| Appendix E: List of Instruments & Software for Integration |
File details come from the government source that posted it. Updated .