This document includes a schedule of items and bid for a federal construction project along with the related federal contract opportunity notice. The project involves construction and closure work on two off-highway vehicle trails located in the Uwharrie National Forest in North Carolina. Specifically, it includes construction of new sections and rerouting of portions of the Dicky Bell OHV Trail totaling 5,815 linear feet. It also involves closure and stabilization of the existing 2,050 linear foot Kodak Rock Trail. A pre-bid site visit was scheduled for January 25, 2024, with any questions due by January 29, 2024. Bidders were encouraged to bring off-highway vehicles to the site visit to access certain work portions. The solicitation number is 12445224R0004 and was issued by the U.S. Department of Agriculture Forest Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. DESCRIPTION PAY UNIT EST QUANTITY UNIT PRICE TOTALS
151.01 Mobilization LS 1
152.01 Construction Survey and Staking MI 1.07
157.01 Soil Erosion and Pollution Control (Includes silt fence, seeding and mulching)
LS 1
157.02 Construction of Check Dams (Closure Section, placed at COR direction)
EA 40
201.01 Clearing and Grubbing Disposal Method (f)
AC 5.0
204.01
Trail Construction Excavation and Embankment Placement Method 3 Tolerance Class F
MI 1.07
602.01
18 Inch Pipe Culvert, Type II Aluminized 16 Gauge Placement Method 6
LF* 80
602.02
24 Inch Pipe Culvert, Type II Aluminized 16 Gauge Compaction Method 6
LF* 62
251.01 Keyed Rip-Rap (Machine Placed) Class 1
TON* 55
301.01
Coarse Aggregate Grading NCDOT Std Size #4 (Railroad Ballast) Placement Method 3
TON* 20
617.02 Install Post and Cable Guiderail (Includes removal of existing per plans)
LF* 2,055
617.01 Install/Replace Wooden Guderail LF* 215
SCHEDULE OF ITEMS ‐ DICKY BELL OHV TRAIL CONSTRUCTION
TOTAL ‐ DICKY BELL TRAIL BID ITEMS:
ITEM NO. DESCRIPTION PAY UNIT EST QUANTITY UNIT PRICE TOTALS
151.01 Mobilization and Bonding LS 1
151.02 Rocky Mountain Loop Trail Access Improvements & Restoration
LS 1
157.01 Straw Wattles (Placed at COR direction)
LF* 500
157.02 Check Dams (Placed at COR Direction)
EA 15
201.01 Slashing in of Trail LF 2,891
204.01 Import and Placement of Fill Material Placement Method 4
CY 4,375
207.01 Class 2 Non-woven Geotextile Filter Fabric SY* 3,741
713.01 Biodegradable Coir Matting (Coir 700) SY* 3,741
625.01 Seeding and Mulching Acre 0.77
*Denotes Actual Quantity. All other quanties are Contract Quantities.
SCHEDULE OF ITEMS ‐ KODAK ROCK TRAIL CLOSURE
TOTAL ‐ KODAK ROCK CLOSURE BID ITEMS:
TOTAL ‐ ALL BID ITEMS: