This document is a comprehensive contract and specification package for the Wright Township Municipal Building Roof Replacement project, prepared by Barry Isett & Associates, Inc., an engineering and consulting firm located in Wilkes-Barre, Pennsylvania. The project involves a full roof replacement for the Wright Township Municipal Building located at 321 South Mountain Blvd. in Mountain Top, PA, with sealed bids to be submitted online via the PennBid Program by 2:00 PM on Tuesday, October 7th, 2025. The project scope includes removing existing roofing, installing new asphalt shingles, ridge vents, underlayment, and metal flashing, with a planned construction commencement on November 17th, 2025, and substantial completion targeted for December 12th, 2025. A pre-bid meeting is scheduled for September 23rd, 2025, at the municipal building, and bidders are encouraged to attend.
The contract requires a bid bond of 10% of the total bid amount, with a performance and payment bond of 100% of the contract value. Prevailing wage rates will apply, and the project will be constructed under a single prime contract. Bidders must provide documentation including contractor qualifications, a list of past projects, and various affidavits such as non-collusion and equal employment opportunity. The roofing materials specified are glass-fiber-reinforced asphalt shingles with a 25-year manufacturer's warranty, including a nonprorated first five years. The project includes specific installation requirements for underlayment, shingles, ridge vents, and metal flashing, with detailed instructions for valley and edge treatments. Bidders must comply with Pennsylvania construction codes, OSHA safety standards, and manufacturer installation guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Pricing Section BT-15CJ-Wildwood.xlsx | XLSX spreadsheet | |
| 2-Contract Documents and Specifications.pdf | ||
| 1-Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contact Documents and Specifications
FOR
Wright Township Municipal Building Roof Replacement
Wright Township 321 South Mountain Blvd.
Mountain Top, PA 18707
Date: September 17th, 2025 Project #: 385525.004
Table of Contents
SECTION 000110 – TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT & CONTRACTING REQUIREMENTS
BIDDING INSTRUCTIONS
001116 Invitation to Bid
002113.31 Instruction to Bidders
BIDDING DOCUMENTS
004313.31 Bid Bond (Sample AIA-310)
004513.31 Contractor’s Qualifications (Sample AIA-305)
004515 Consent of Surety 004519 Non-Collusion Affidavit 004536 Equal Employment Opportunity Affidavit 004546 PA E-Verify 004597 Bid Submittal Checklist
CONTRACTING REQUIREMENTS
005213.33 Agreement Form (Stipulated Sum – Single-Prime Contract) – (Sample AIA-105)
006113.31 Performance Bond (Sample AIA-312)
006113.33 Payment Bond (Sample AIA-312)
007343 Prevailing Wage Rates
TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013300 Submittal Procedures 015000 Temporary Facilities and Controls 017300 Execution 017700 Closeout Procedures
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
070150.19 Preparation for Reroofing
073113 Asphalt Shingles
Wright Township Municipal Building Roof Replacement Project #385525.004
Division 00 Procurement &
Contracting Requirements
Bidding Instructions
INVITATION TO BID 001116 - 1
SECTION 001116 – INVITATION TO BID
Notice is hereby given that Wright Township Municipality will receive sealed bids online via the PennBid Program (http://pennbid.bonfirehub.com) until 2:00 PM prevailing time on Tuesday, October 7th, 2025 for the Wright Township Municipal Building Roof Replacement project. The work includes but is not limited to all labor, materials, tools, oversight and permits required to replace all roof coverings on the existing Municipal building.
All bidding documents will be available online at no cost via the PennBid Program (http://pennbid.bonfirehub.com) beginning at 2:00 PM on Wednesday, September 17th, 2025.
Bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania, in accordance with the project specifications in the amount of 10% of the total bid amount. A Performance and Payment Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. Prevailing Wage Rates shall apply.
Immediately following the due date and time, all bids received through PennBid will be opened online at the Engineer’s Office and referred to Wright Township for final award. An abstract of the bids received will be available to bidders on PennBid following the date and time that bids are due as indicated above.
A pre-bid meeting will be held at 10:00 AM on Tuesday, September 23rd, 2025 at the Wright Township Municipal Building located at 321 S Mountain Blvd, Mountain Top, PA 18707. All bidders are encouraged to attend. Questions may be submitted through PennBid’s “Messages/Public Q&A” tab on or before 4:00 PM on Friday, September 26th. Responses will be provided via PennBid to all registered parties.
Wright Township reserves the right to accept or reject any or all bids or portions or to waive any informalities in bidding and to withhold award for a period of sixty days.
On Behalf of Wright Township Barry Isett & Associates, Inc.
1170 PA-315, Suite #3 Wilkes-Barre, PA 18702
INSTRUCTION TO BIDDERS 002113.31 - 1
SECTION 002113.31 – INSTRUCTION TO BIDDERS
ARTICLE 1 - DEFINITIONS
1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents.
The Bidding Requirements consist of the Advertisement or Invitation to Bid, Instructions to Bidders, the bid form, and other sample bidding and contract forms. The proposed Contract Documents consist of the form of Agreement between the Owner and Contractor, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications and all Addenda issued prior to execution of the Contract.
1.2 Definitions set forth in the General Conditions of the Contract for Construction, AIA Document A201, or in other Contract Documents are applicable to the Bidding Documents.
1.3 Addenda are written or graphic instruments issued by the Engineer prior to the execution of the Contract which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections.
1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents as the base, to which Work may be added or from which Work may be deleted for sums stated in Alternate Bids.
1.6 An Allowance is a specified monetary amount identified in the Bidding Documents and stated in the Bid to cover the cost of particular items of Work, materials, equipment, or services.
Allowances are established to ensure that comparable costs are included by all Bidders for designated portions of the Work.
1.7 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from the amount of the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
1.8 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment or services or a portion of the Work as described in the Bidding Documents.
1.9 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.
1.10 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment or labor for a portion of the Work.
ARTICLE 2 - BIDDER'S REPRESENTATIONS
2.1 The Bidder by making a Bid represents that:
A. The Bidder has read and understands the Bidding Documents or Contract Documents, to the extent that such documentation relates to the Work for which the Bid is submitted, and for other portions of the Project, if any, being bid concurrently or presently under construction.
INSTRUCTION TO BIDDERS 002113.31 - 2
B. The Bid is made in compliance with the Bidding Documents.
C. The Bidder has visited the site, become familiar with local conditions under which the Work is to be performed and has correlated the Bidder's personal observations with the requirements of the proposed Contract Documents.
D. The Bid is based upon the materials, equipment and systems required by the Bidding Documents without exception.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.1 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall complete submit a properly executed AIA Document A305, Contractor's Qualification Statement.
3.2 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.3 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.4 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 - BIDDING DOCUMENTS
4.1 COPIES
A. Bidders may obtain complete sets of the Bidding Documents at no cost, online via the PennBid Program (https://pennbid.bonfirehub.com)
B. Bidders shall use complete sets of Bidding Documents in preparing Bids; neither the Owner nor Engineer assumes responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
C. The Owner and Engineer may make copies of the Bidding Documents available on the above terms for the purpose of obtaining Bids on the Work. No license or grant of use is conferred by issuance of copies of the Bidding Documents.
4.2 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS
A. The Bidder shall carefully study and compare the Bidding Documents with each other, and with other work being bid concurrently or presently under construction to the extent that it relates to the Work for which the Bid is submitted, shall examine the site and local conditions, and shall at once report to the Engineer errors, inconsistencies or ambiguities discovered.
B. Bidders and Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request via PennBid’s “Messages /Vendor Discussions” in accordance with the date referenced in the Invitation to Bidders.
C. Interpretations, corrections and changes of the Bidding Documents will be made by Addendum.
Interpretations, corrections and changes of the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon them.
INSTRUCTION TO BIDDERS 002113.31 - 3
4.3 SUBSTITUTIONS
A. The materials, products and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution.
Proprietary Items - Contractor may propose an “or equal” product for any item(s) specifically noted on the drawings or within the technical specifications. Contractor shall provide details and submit substitutions to the Engineer for review and approval as set forth in this section.
B. No substitution will be considered prior to receipt of Bids unless written request for approval has been received by the Engineer by 3:00 P.M. at least ten days prior to the date for receipt of Bids.
Such requests shall include the enclosed substitution request form, the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for an evaluation.
A statement setting forth changes in other materials, equipment or other portions of the Work, including changes in the work of other contracts that incorporation of the proposed substitution would require, shall be included. The burden of proof of the merit of the proposed substitution is upon the proposer. The Engineer's decision of approval or disapproval of a proposed substitution shall be final.
C. If the Engineer approves a proposed substitution prior to receipt of Bids, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner.
D. No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.
4.4 ADDENDA
A. Addenda will be posted online via PennBid’s “Files” tab and bidder will be notified via email.
B. Each Bidder shall ascertain prior to submitting a Bid that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.
ARTICLE 5 - BIDDING PROCEDURES
5.1 PREPARATION OF BIDS
A. The Bid Form may be included in the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid’s “Prepare Your Submission” tab.
B. Allowances shall be itemized separately from the Base Bid. Each allowance shall be clearly listed with its corresponding value in the Bid Form. The total of all allowances will be added to the Base Bid to establish the Base Bid Amount. The Contractor shall not omit or conceal allowances within other line items of the bid. Failure to properly itemize allowances may render the bid nonresponsive.
C. All requested Alternates shall be bid. If no change in the Base Bid is required, enter “0.”
D. Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder's refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall make no additional stipulations on the bid form nor qualify the Bid in any other manner.
INSTRUCTION TO BIDDERS 002113.31 - 4
E. Each copy of the Bid shall state the legal name of the Bidder and the nature of legal form of the Bidder. The Bidder shall provide evidence of legal authority to perform within the jurisdiction of the Work. Each copy shall be signed by the person or persons legally authorized to bind the Bidder to a contract.
A Bid by a corporation shall further give the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached certifying the agent's authority to bind the Bidder.
F. Each Bid shall be accompanied with a list of three closely-related past projects completed by the Bidder within the last five years. This list shall include a description of the work included in the project, the Client, the Client’s contact information, time of completion, and a value of the total construction cost.
5.2 BID SECURITY
A. Each Bid shall be accompanied by a bid security in the form and the amount of 10% of the bid if so stipulated in the Instructions to Bidders. The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and will, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. The amount of the bid security shall not be forfeited to the Owner in the event the Owner fails to comply with Section 6.2.
B. If a surety bond is required, it shall be written on AIA Document A310, Bid Bond, unless otherwise provided in the Bidding Documents, and the attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of the power of attorney.
C. The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until either (a) the Contract has been executed and bonds, if required, have been furnished, or (b) the specified time has elapsed so that Bids may be withdrawn or (c) all Bids have been rejected.
5.3 CONTRACTOR'S QUALIFICATION STATEMENT
A. Bidders shall submit to the Engineer, upon request, a properly executed AIA Document A305, Contractor's Qualification Statement with attachments as required.
5.4 SUBMISSION OF BIDS
A. Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com).
Bidders shall complete the electronic bid form within PennBid’s “Prepare Your Submission” tab.
B. The bid security, if any, and any other documents required to be submitted with the Bid uploaded to the PennBid’s “Requested Information” tab.
C. The Bidder shall assume full responsibility for timely submission of Bids.
Wright Township https://pennbid.bonfirehub.com/
INSTRUCTION TO BIDDERS 002113.31 - 5
5.5 MODIFICATION OR WITHDRAWAL OF BID
A. A Bid may not be modified, withdrawn or canceled by the Bidder during the stipulated time period following the time and date designated for the receipt of Bids, and each Bidder so agrees in submitting a Bid.
B. Prior to the time and date designated for receipt of Bids, a submitted Bid may be modified or withdrawn any time within the PennBid Program.
C. Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders.
D. Bid security, if required, shall be in an amount sufficient for the Bid as resubmitted.
ARTICLE 6 - CONSIDERATION OF BIDS
6.1 OPENING OF BIDS
A. Upon receipt of the bids, the bids will be opened electronically. A public notice will be issued via PennBid containing any available bid results. These results are subject to further review and should not be considered an issuance of an award.
B. At the discretion of the Owner and only if stipulated in the Invitation to Bid, the properly identified Bids received on time will be publicly opened and read aloud. Results will be issued per Article 6.1.A.
6.2 REJECTION OF BIDS
A. The Owner shall have the right to reject any or all Bids. A Bid not accompanied by a required bid security or by other data required by the Bidding Documents, or a Bid which is in any way incomplete or irregular is subject to rejection.
6.3 ACCEPTANCE OF BID (AWARD)
A. It is the intent of the Owner to award a Contract to the lowest qualified Bidder provided the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available.
B. The Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner's judgment, is in the Owner's own best interests.
C. The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the low Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 7 – CONTRACT TIMES
7.1 The number of days within which, or the dates by which, Milestones are to be achieved and the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.
INSTRUCTION TO BIDDERS 002113.31 - 6
ARTICLE 8 – LIQUIDATED DAMAGES
8.1 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 9 - POST-BID INFORMATION
9.1 OWNER'S FINANCIAL CAPABILITY
A. The Owner shall, at the request of the Bidder to whom award of a Contract is under consideration and no later than seven days prior to the expiration of the time for withdrawal of Bids, furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. Unless such reasonable evidence is furnished, the Bidder will not be required to execute the Agreement between the Owner and Contractor.
9.2 SUBMITTALS
A. The Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, after notification of selection for the award of a Contract, furnish to the Owner through the Engineer in writing:
1. a designation of the Work to be performed with the Bidder's own forces;
2. names of the manufacturers, products, and the suppliers of principal items or systems of materials and equipment proposed for the Work; and
3. names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.
B. The Bidder will be required to establish to the satisfaction of the Engineer and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
C. Prior to the execution of the Contract, the Engineer will notify the Bidder in writing if either the Owner or Engineer, after due investigation, has reasonable objection to a person or entity proposed by the Bidder.
If the Owner or Engineer has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder's option, (1) withdraw the Bid or (2) submit an acceptable substitute person or entity with no adjustment in the Base Bid or Alternate Bid occasioned by such substitution. The Owner may accept the adjusted bid or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.
D. Persons and entities proposed by the Bidder and to whom the Owner and Engineer have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Engineer.
INSTRUCTION TO BIDDERS 002113.31 - 7
ARTICLE 10 - BONDING AND INSURANCE REQUIREMENTS
10.1 BOND REQUIREMENTS
A. The Bidder shall furnish bonds in 100% of the contract value covering the faithful performance of the Contract and payment of all obligations arising thereunder. Bonds may be secured through the Bidder's usual sources.
B. The contractor shall be required to provide the Owner with a 1-year maintenance bond in the amount of 10% of the awarded contract value after achieving substantial completion.
C. If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.
D. If the Owner requires that bonds be secured from other than the Bidder's usual sources, changes in cost will be adjusted as provided in the Contract Documents.
10.2 TIME OF DELIVERY AND FORM OF BONDS
A. The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to be commenced prior thereto in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 10.2.
B. The bonds shall be dated on or after the date of the Contract.
C. The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney.
10.3 INSURANCE REQUIREMENTS
A. The successful bidder, prior to commencing work, shall provide at his own expense, the following insurance to the Owner, evidenced by certificates of insurance. Each certificate shall require that notice be given, thirty (30) days prior to cancellation or material change in the policies, to Owner and all additional insureds. Nothing contained in this section shall be construed as limiting the extent of the vendor’s responsibility for payment of damages resulting from his operations under the contract.
B. Workers’ Compensation including Occupational Disease and Employer’s Liability Insurance.
C. Statutory – Amounts and coverage as required by Pennsylvania Workmen’s Compensation and Occupational Disease Laws.
D. Employer’s Liability – As listed in the AIA Standard Form of Agreement Between Owner and Contractor included in the Contract Documents.
E. Liability – The vendor shall maintain a Commercial General Liability Insurance Policy, using an occurrence form of coverage. The required coverage forms are:
Comprehensive Premises - Operation
INSTRUCTION TO BIDDERS 002113.31 - 8
Contractual Insurance Independent Contractor
The General Liability Policy shall have a minimum limit of liability as listed in the AIA Standard Form of Agreement Between Owner and Contractor included in the Contract Documents.
Automobile Liability coverage with minimum combined single limits as listed in the AIA Standard Form of Agreement Between Owner and Contractor included in the Contract Documents.
The Contractor shall obtain total minimum coverage limits as listed in the AIA Standard Form of Agreement Between Owner and Contractor included in the Contract Documents.
10.5 ADDITIONALLY INSURED
A. The vendor, prior to commencing work, shall provide at his own expense, the required insurance to the Engineer and the Owner, evidenced by certificates of insurance. All policies shall name the Owner, its officers, agents, employees and Barry Isett & Associates, Inc. as additional insured.
This coverage shall be reflected on the Certificates of Insurance.
ARTICLE 11 - PENNSYLVANIA CONSTRUCTION CODE ACT
11.1 Construction must comply with the Act of November 10, 1999 (P.L. 491, No. 45), known as the Pennsylvania Construction Code Act (35 P.S. Sections 7210.101 et seq.), as implemented by Department of Labor and Industry regulations, 34 Pa. Code Chapters 401, 403, and 405. Please note that, as of December 2006, Pennsylvania's statewide building code will be referred to as the Uniform Construction Code (UCC). The codes currently in use under the UCC are the 2015 International Codes issued by the International Code Council.
ARTICLE 12 - STEEL PRODUCTS PROCUREMENT ACT
12.1 In accordance with Act No. 3 of the 1978 General Assembly of the Commonwealth of Pennsylvania, approved March 3, 1978, and as currently amended, if any steel products are to be used or supplied in the performance of the contract, only steel products produced in the United States as defined therein shall be used or supplied in the performance of the contract or any subcontracts thereunder.
Bidding Documents
CONSENT OF SURETY 004515 - 1
SECTION 004515 – CONSENT OF SURETY
KNOW ALL MEN BY THESE PRESENTS, that we , as Surety, a corporation existing under the laws of the State/Commonwealth of , and authorized to transact business in the Commonwealth of Pennsylvania, hereby agree to execute within the time limit and in the forms and amounts specified in the Contract Documents, the Contract Bonds as required for the faithful performance and proper fulfillment of the Contract for
On behalf of hereinafter called the Bidder, provided that the above Contract be award to the Bidder within sixty (60) days after the date of opening of bids, or as otherwise set forth in the Instructions to Bidders and any amendments thereto; and the Surety further agrees that should the Surety, after notification of intent to make such award, refuse to execute and/or otherwise provide the required Bonds, then the Surety shall pay to the Owner of the Project, the amount of the Bid Security.
ATTEST SURETY
DATE SIGNATURE (AFFIX CORPORATE SEAL)
ATTORNEY IN FACT
* Attach an appropriate Power of Attorney, dated as of the same date as this Agreement, evidencing the authority of Attorney-in-Fact to act on behalf of the corporation.
NON-COLLUSION AFFIDAVIT 004519 - 1
SECTION 004519 – NON-COLLUSION AFFIDAVIT
State of _____________________________
County of ____________________________
I _______________________________________, being first duly sworn, deposes and says that:
(Print Name)
(1) I am __________________________________________________________ of (Title)
__________________________________________________, the Bidder that has submitted the (Name of Firm) attached bid;
(2) I am fully informed respecting the preparation and contents of the attached Bid and all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantages against the Owner or any person interested in the proposed Contract; and
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
(Signed) ____________________________
(Title)
Subscribed and sworn to before me This ____ day of ______________, 20____.
(Title)
My Commission Expires ________________________________
Wright Township Municipal Building Roof Replacement Project #385525.004 jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle jharvey Rectangle
AMERICANS WITH DISABILITIES ACT 004537 - 1
SECTION 004537 – EQUAL EMPLOYMENT OPPORTUNITY AFFIDAVIT
EQUAL OPPORTUNITY FOR INDIVIDUALS WITH DISABILITIES:
The Contractor and the Owner do hereby agree that the provisions of Title II of the Americans With Disabilities Act of 1990 (the "Act") (42 U.S.C. S12101 et seq.), which prohibits discrimination on the basis of disability by public entities in all services, programs, and activities provided or made available by public entities, and the rules and regulations promulgated pursuant thereunto, are made a part of this Contract. In providing any aid, benefit, or service on behalf of the Owner pursuant to this Contract, the Contractor agrees that the performance shall be in strict compliance with the Act. In the event that the Contractor, it agents, servants, employees, or Subcontractors violate or are alleged to have violated the Act during the performance of this Contract, the Contractor shall defend the Owner in any action or administrative proceeding commenced pursuant to this Act. The Contractor shall indemnify, protect, and save harmless the Owner, its agents, servants, and employees from and against any and all suits, claims, losses, demands, or damages of whatever kind or nature arising out of or claimed to arise out of the alleged violation. The Contractor shall, at its own expense, appear, defend, and pay any and all charges for legal services and any and all costs and other expenses arising from such action or administrative proceeding or incurred in connection therewith. In any and all complaints brought pursuant to the Owner's grievance procedure, the Contractor agrees to abide by any decision of the Owner which is rendered pursuant to said grievance procedure. If any action or administrative proceeding results in an award of damages against the Owner or if the Owner incurs any expense to cure a violation of the ADA which has been brought pursuant to its grievance procedure, the Contractor shall satisfy and discharge the same at its own expense.
The Owner shall, as soon as practicable after a claim has been made against it, give written notice thereof to the Contractor along with full and complete particulars of the claim. If any action or administrative proceeding is brought against the Owner or any of its agents, servants, and employees, the Owner shall expeditiously forward or have forwarded to the Contractor every demand, complaint, notice, summons, pleading, or other process received by the Owner or its representatives.
It is expressly agreed and understood that any approval by the Owner of the services provided by the Contractor pursuant to this Contract will not relieve the Contractor of the obligation to comply with the Act and to defend, indemnify, protect, and save harmless the Owner pursuant to this Paragraph.
It is further agreed and understood that the Owner assumes no obligation to indemnify or save harmless the Contractor, its agents, servants, employees and Subcontractors for any claim which may arise out of their performance of the Agreement. Furthermore, the Contractor expressly understands and agrees that the provisions of this indemnification clause shall in no way limit the Contractor's obligations assumed in this Agreement, nor shall they be construed to relieve the Contractor from any liability, nor preclude the Owner from taking any other actions available to it under any other provisions of this Agreement or otherwise at law.
Contractor Signature: ________________________________________
Contractor Name: ___________________________________________
Date: _________________________
Wright Township Municipal Building Roof Replacement Project #385525.004 jharvey Rectangle jharvey Rectangle jharvey Rectangle
COMMONWEALTH OF PENNSYLVANIA
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
Date _______________________
Business or Organization Name (Employer)_________________________________________________
Address _____________________________________________________________________________
City _____________________________________ State_____________ Zip Code ________________
Contractor {dzōŎƻƴǘNJŀŎǘƻNJ όŎƘŜŎƪ ƻƴŜύ
Contracting Public Body _______________________________________________________________
Contract/Project No ___________________________________________________________________
Project Description ____________________________________________________________________
Project Location ______________________________________________________________________
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act
(‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States
Department of Homeland Security. To the best of my/our knowledge, all employees hired post
January 1, 2013 are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature
06 62 00 E-verify Act and Form
On July 5, 2012, Gov. Corbett signed into law the Public Works Employment Verification Act (S.B. 637) which takes effect January 1, 2013.
The Act requires all public works contractors and subcontractors in Pennsylvania to use E-Verify to verify the employment eligibility of new employees and applies to projects with an estimated cost in excess of $25,000 that are funded by the Commonwealth, or its political subdivisions, authorities, or agencies. E-Verify is an internet-based system that compares information from an employee’s Form I-9, Employment Eligibility Verification, to data from the U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility.
(5) "Public work" means construction, reconstruction, demolition, alteration and/or repair work other than maintenance work, done under contract and paid for in whole or in part out of the funds of a public body where the estimated cost of the total project is in excess of twenty-five thousand dollars ($25,000), but shall not include work performed under a rehabilitation or manpower training program.
Under the Act, a contractor must submit a verification form signed under penalty of perjury and acknowledging its compliance with the Act as a precondition of being awarded a public works contract. Subcontractors must submit the form prior to commencing work on the public works project. In addition, contractors must include in their subcontracts information about the requirements of the Act. The Department of General Services (DGS) will create the verification form and is also charged with enforcement of the Act through complaint-based as well as random audits.
A contractor or subcontractor violates the Act by failing either to use E-Verify or to provide the verification form. Sanctions for failure to use E-Verify range from a warning letter (to be posted on the DGS website) for a first violation to a one year debarment for a third and subsequent violation. A willful violation of the Act will result in a 3-year debarment. Civil penalties for failure to use the form or for false statements on the form range from $250 to $1,000 for each violation.
The Act provides significant protection for whistleblowers. If an employee of a contractor or subcontractor is retaliated against for instigating or cooperating in an investigation, the employee can bring suit (which must be brought within 180 days from the date the employee knew of the retaliation) to obtain reinstatement of employment and to collect three times lost wages, along with an award of attorney’s fees and costs.
A contractor or subcontractor who relies in good faith on E-Verify has immunity from sanctions and shall have no liability to any individual who is not hired or is discharged from employment.
Good faith is shown by a federal agency’s written acknowledgment of the use of E-Verify.
Contractors are not liable for violations by subcontractors.
Information on E-Verify can be found:
http://www.uscis.gov/portal/site/uscis and searching for e-verify.
PA DGS regulations can be found:
http://www.pabulletin.com/secure/data/vol42/42-52/2525.html An electronic version of the verification form can be found at:
http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/pub lic_works_employment_verification/1357211
Wright Township Municipal Building Roof Replacement Project #385525.004 http://www.legis.state.pa.us/cfdocs/legis/PN/Public/btCheck.cfm?txtType=HTM&sessYr=2011&sessInd=0&billBody=S&billTyp=B&billNbr=0637&pn=2347 http://www.uscis.gov/portal/site/uscis/menuitem.eb1d4c2a3e5b9ac89243c6a7543f6d1a/?vgnextoid=75bce2e261405110VgnVCM1000004718190aRCRD&vgnextchannel=75bce2e261405110VgnVCM1000004718190aRCRD&gclid=CLKy7PD5lrECFcXe4Aodnm_Yew http://www.uscis.gov/portal/site/uscis http://www.pabulletin.com/secure/data/vol42/42-52/2525.html http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_works_employment_verification/1357211 http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_works/1235/public_works_employment_verification/1357211 tsisock Rectangle cnewton Text Box PA E-Verify Form 004546-1
BID SUBMITTAL CHECKLIST 004597 - 1
SECTION 004597 – BID SUBMITTAL CHECKLIST
The following represents a list of those documents and materials which will be required in connection with the project. Certain items will be required at the time of the bid submission; failure to submit them will render the bid nonresponsive, which may result in the rejection of the bid by the Owner in accordance with Pennsylvania law; other items will be required after award of the contract but no later than time set for the contract execution. A specific review should be made of bidding documents contained in the Project Manual to ascertain what those documents are and when they are required to be submitted.
This reminder summary is to act as a courtesy to potential bidders to remind them what documents or materials need to be submitted.
Submissions required to be uploaded to PennBid with the bid:
Pricing Section (Excel, .xlsx)
Bidder Acknowledgements (Excel, .xlsx)
Bid Bond (PDF, .pdf)
Contractor’s Qualifications Statement (PDF, .pdf)
Consent of Surety (PDF, .pdf)
Non-Collusion Affidavit (PDF, .pdf)
Equal Employment Opportunity Affidavit (PDF, .pdf)
E-Verify (PDF, .pdf)
Once again, this reminder list is submitted to the bidders strictly as courtesy and is not to be binding on the Owner. Responsibility for ascertaining and submitting the documents needed for consideration of the bid, and at the appropriate time, falls upon each and every bidder.
Submissions required after award of the contract and on or before the contract execution:
Executed Standard Contract
Performance/Payment/Maintenance Bonds (Maintenance due at end of project)
Certificate of Insurance/W9 with Additional Insured Listed
Schedule of Values
Proposed Sub-Contractors Form
Contracting Requirements
Project Name: Wright Township Municipal Roof Replacement
General Description: Shingle Replacement on Existing Roof Structure
Project Locality Wright Township, Luzerne Count
Awarding Agency: Wright Township
Contract Award Date: 10/15/2025
Serial Number: 25-08599
Project Classification: Building
Determination Date: 9/15/2025
Assigned Field Office: Scranton
Field Office Phone Number: (570)963-4577
Toll Free Phone Number: (877)214-3962
Project County: Luzerne County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 9/15/2025 Page 1 of 7
Project: 25-08599 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 7/1/2024 $37.08 $24.92 $62.00
Asbestos & Insulation Workers 7/1/2025 $37.08 $28.17 $65.25
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2024 $36.71 $19.13 $55.84
Boilermakers 1/1/2023 $51.27 $35.30 $86.57
Boilermakers 1/1/2024 $52.10 $35.72 $87.82
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
4/28/2024 $41.32 $18.76 $60.08
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
5/4/2025 $43.17 $18.76 $61.93
Carpenters - Piledriver/Welder 1/1/2024 $42.13 $21.97 $64.10
Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10
Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
5/1/2024 $35.23 $18.63 $53.86
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
5/1/2025 $36.57 $20.29 $56.86
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
5/1/2026 $36.57 $22.29 $58.86
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
5/1/2027 $36.57 $24.29 $60.86
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
5/1/2028 $36.57 $26.29 $62.86
Cement Finishers & Plasterers 4/28/2024 $32.49 $20.01 $52.50
Cement Finishers & Plasterers 5/4/2025 $34.49 $20.01 $54.50
Cement Finishers & Plasterers 5/3/2026 $36.49 $20.01 $56.50
Cement Finishers & Plasterers 5/3/2027 $34.71 $23.79 $58.50
Cement Masons 6/1/2024 $37.78 $15.05 $52.83
Drywall Finisher 5/1/2024 $31.82 $24.75 $56.57
Drywall Finisher 5/1/2025 $33.24 $25.08 $58.32
Electricians 6/1/2024 $42.51 $25.13 $67.64
Electricians 6/1/2025 $45.08 $25.72 $70.80
Electricians 6/1/2026 $47.79 $26.32 $74.11
Elevator Constructor 1/1/2024 $58.88 $43.90 $102.78
Elevator Constructor 1/1/2025 $61.41 $44.95 $106.36
Glazier 5/1/2024 $32.46 $20.93 $53.39
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2024 $37.26 $32.63 $69.89
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2025 $38.76 $33.38 $72.14
Laborers (Class 01 - See notes) 5/1/2023 $24.25 $20.28 $44.53
Laborers (Class 01 - See notes) 5/1/2025 $27.75 $20.78 $48.53
Laborers (Class 02 - See notes) 5/1/2023 $26.25 $20.28 $46.53
Laborers (Class 02 - See notes) 5/1/2025 $29.75 $20.78 $50.53
Laborers (Class 03 - See notes) 5/1/2023 $26.72 $20.28 $47.00
Laborers (Class 03 - See notes) 5/1/2025 $29.77 $20.78 $50.55
Laborers (Class 04 - See notes) 5/1/2023 $28.22 $20.28 $48.50
Laborers (Class 04 - See notes) 5/1/2025 $31.27 $20.78 $52.05
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 9/15/2025 Page 2 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Laborers (Class 05 - See notes) 5/1/2023 $28.72 $20.28 $49.00
Laborers (Class 05 - See notes) 5/1/2025 $31.77 $20.78 $52.55
Laborers (Class 06 - See notes) 5/1/2023 $27.02 $20.28 $47.30
Laborers (Class 06 - See notes) 5/1/2025 $30.52 $20.78 $51.30
Marble Mason 5/1/2024 $36.60 $19.13 $55.73
Marble Mason 5/1/2025 $38.55 $19.13 $57.68
Marble Mason 5/1/2026 $40.50 $19.13 $59.63
Millwright 6/1/2024 $41.07 $22.95 $64.02
Millwright 6/1/2025 $43.00 $22.95 $65.95
Millwright 6/1/2026 $44.97 $22.95 $67.92
Operators (Building, Class 01 - See Notes) 5/1/2024 $43.73 $30.08 $73.81
Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81
Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81
Operators (Building, Class 01A - See Notes) 5/1/2024 $45.98 $30.74 $76.72
Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72
Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72
Operators (Building, Class 02 - See Notes) 5/1/2024 $43.45 $29.99 $73.44
Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44
Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44
Operators (Building, Class 02A - See Notes) 5/1/2024 $45.70 $30.66 $76.36
Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36
Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36
Operators (Building, Class 03 - See Notes) 5/1/2024 $40.73 $29.18 $69.91
Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91
Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91
Operators (Building, Class 04 - See Notes) 5/1/2024 $39.59 $28.85 $68.44
Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44
Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44
Operators (Building, Class 05 - See Notes) 5/1/2024 $39.13 $28.73 $67.86
Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86
Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86
Operators (Building, Class 06 - See Notes) 5/1/2024 $38.26 $28.46 $66.72
Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72
Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72
Operators (Building, Class 07A- See Notes) 5/1/2024 $53.10 $34.27 $87.37
Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77
Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17
Operators (Building, Class 07B- See Notes) 5/1/2024 $52.75 $34.17 $86.92
Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32
Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72
Painters Class 1 (see notes) 5/1/2024 $30.36 $24.15 $54.51
Painters Class 1 (see notes) 5/1/2025 $31.32 $24.44 $55.76
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters Class 2 (see notes) 5/1/2023 $33.58 $23.58 $57.16
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 9/15/2025 Page 3 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Painters Class 2 (see notes) 5/1/2025 $35.58 $25.08 $60.66
Painters Class 3 (see notes) 5/1/2023 $40.18 $23.58 $63.76
Painters Class 3 (see notes) 5/1/2025 $42.67 $25.09 $67.76
Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54
Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17
Piledrivers 1/1/2025 $41.88 $22.72 $64.60
Piledrivers 1/1/2026 $43.13 $23.47 $66.60
Plasterers 6/1/2024 $38.46 $14.45 $52.91
Plumbers and Steamfitters 12/1/2024 $51.49 $24.67 $76.16
Roofers 5/1/2024 $34.25 $21.89 $56.14
Roofers 5/1/2025 $36.10 $21.89 $57.99
Sheet Metal Workers 5/1/2024 $36.13 $31.23 $67.36
Sheet Metal Workers 5/1/2025 $37.30 $32.31 $69.61
Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07
Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96
Terrazzo Finisher 5/1/2024 $35.66 $20.76 $56.42
Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00
Terrazzo Grinder 5/1/2024 $36.42 $20.76 $57.18
Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78
Terrazzo Mechanics 5/1/2024 $36.44 $22.51 $58.95
Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60
Tile & Marble Finisher 5/1/2024 $34.69 $17.63 $52.32
Tile & Marble Finisher 5/1/2025 $36.64 $17.63 $54.27
Tile & Marble Finisher 5/1/2026 $38.59 $17.63 $56.22
Tile Setter 5/1/2024 $36.60 $19.13 $55.73
Tile Setter 5/1/2025 $38.55 $19.13 $57.68
Tile Setter 5/1/2026 $40.50 $19.13 $59.63
Truckdriver class 1(see notes) 5/1/2021 $37.72 $0.00 $37.72
Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87
Truckdriver class 2 (see notes) 5/1/2021 $37.79 $0.00 $37.79
Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94
Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43
Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60
Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 9/15/2025 Page 4 of 7
Project: 25-08599 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Carpenter 5/1/2024 $36.12 $19.79 $55.91
Carpenter 5/1/2025 $36.87 $20.49 $57.36
Carpenter 5/1/2026 $37.63 $21.18 $58.81
Carpenter Welder 5/1/2024 $36.87 $19.79 $56.66
Carpenter Welder 5/1/2025 $37.62 $20.49 $58.11
Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56
Carpenters - Piledriver/Welder 1/1/2024 $36.87 $19.79 $56.66
Carpenters - Piledriver/Welder 1/1/2025 $37.62 $20.49 $58.11
Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56
Cement Finishers 6/1/2016 $32.43 $11.35 $43.78
Electric Lineman 1/1/2025 $66.33 $30.40 $96.73
Electric Lineman 9/1/2025 $68.06 $32.29 $100.35
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2024 $37.26 $32.63 $69.89
Laborers (Class 01 - See notes) 5/1/2024 $25.61 $19.49 $45.10
Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60
Laborers (Class 02 - See notes) 5/1/2024 $32.23 $19.49 $51.72
Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22
Laborers (Class 03 - See notes) 5/1/2024 $29.22 $19.49 $48.71
Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21
Laborers (Class 04 - See notes) 5/1/2024 $29.57 $19.49 $49.06
Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56
Laborers (Class 05 - See notes) 5/1/2024 $30.24 $19.49 $49.73
Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23
Laborers (Class 06 - See notes) 5/1/2024 $29.66 $19.49 $49.15
Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65
Laborers (Class 07 - See notes) 5/1/2024 $29.95 $19.49 $49.44
Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94
Laborers (Class 08 - See notes) 5/1/2024 $30.43 $19.49 $49.92
Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42
Millwright 6/1/2024 $43.46 $23.33 $66.79
Millwright 6/1/2025 $45.46 $23.33 $68.79
Millwright 6/1/2026 $47.52 $23.33 $70.85
Operators (Heavy, Class 01 - See Notes) 5/1/2024 $42.30 $29.66 $71.96
Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96
Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96
Operators (Heavy, Class 01A - See…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .