1-BPM006379_Solicitation_Attachment_10_-_Experience_and_Capacity_Response.pdf
PDF 386 KB Posted
- Attached to
- Master Agreement AZ|CTR074227
- Contract number
- CTR074227
- Issued by
- Arizona
About this file
This is a Request for Proposal (RFP) from the Arizona Department of Environmental Quality (ADEQ) for Capacity Development/Technical Assistance to Small Public Drinking Water Systems. The solicitation is specifically numbered BPM006379 and is being responded to by KUV Consultants, LLC, a private consulting firm located in Glendale, Arizona. The document details KUV Consultants' experience and capabilities in providing technical services to water systems, primarily focusing on small water utilities serving less than 10,000 people.
KUV Consultants is proposing to provide multiple services under this contract, including Asset Management Plans, Capacity Development Activities, Capacity Development Training, Developing Regulatory Plans, Risk & Resiliency Assessments, System Evaluations, and Water Quality Compliance Options Reports. Their past projects have involved developing emergency response plans, conducting system evaluations, creating training workshops, and helping water systems comply with various regulatory standards such as the America's Water Infrastructure Act. The proposed services are aimed at improving the technical, managerial, and financial capacities of small water systems in Arizona, with project costs ranging from $2,500 to $15,000 per project. The company has extensive experience working directly with ADEQ, having provided similar services since 2004.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. BPM006379 Capacity Development/Technical Assistance to Small Public
Drinking Water Systems
Arizona Department of Environmental Quality (ADEQ)
1110 W. Washington Street Phoenix, AZ 85007
Solicitation Attachment – Experience and Capacity Response | Revision No. 1 | Revised 11-22
Attachment 10 – Experience and Capacity Response
THE STATE MAY DETERMINE YOUR PROPOSAL NON-RESPONSIVE IF YOU DO NOT FULLY RESPOND.
The Offeror shall provide a narrative response to each section that demonstrates their understanding of the Scope of Work requirements and describes the company’s overall experience and capacity in providing the Services stated in this Solicitation. If there is a section that is not applicable to the Services required by the Scope of Work, you may mark it “N/A”.
Offeror shall provide a response either after each section or in a separate document entitled: “Attachment 10 - Experience and Capacity Response.” If a separate document is used, please clearly designate each section and double-check to ensure that each question has been answered. If any information provided is considered CONFIDENTIAL by Offeror, the information must be specifically included in the Confidential Information Designation Attachment and related documentation to be assessed for confidential treatment under A.A.C. R2-7-103.
1.0 Company Profile. The Offeror must include a narrative description of its organization. The narrative must include the following:
1.1 Date Established and ownership (public, partnership, subsidiary, etc.);
1.2 Is the Offeror a national or local company;
1.3 Address of “Main Office” (e.g. Corporate Headquarters and any satellite offices responsible for performance of proposed tasks;
1.4 Brief overview of business operations, with an emphasis on experience in regards to the Scope of Work (limit the response to this question to one page, font size 10 pt or greater);
1.5 Offeror's organizational chart relevant to the Contract, specifically identifying the key point of contact for all questions related to the submitted Offer. In addition, identify key point of contact for Task Order Offer Requests.
1.6 Full disclosure of any potential conflict of interest between the Offeror and any State employee who functions or has responsibilities in the review or approval of the undertaking or carrying out of the Contract;
1.7 A Statement of whether, in the last five (5) years, the Offeror has filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors, and if so, an explanation providing relevant details and current status;
1.8 A Statement of whether there are any pending Securities Exchange Commission investigations involving the Offeror, and if such are pending or in progress, an explanation providing relevant details and an attached opinion of counsel as to whether the pending investigation(s) may impair the Offeror’s performance in a Contract under this Solicitation;
1.9 A Statement documenting all open or pending litigation initiated by Offeror or where Offeror is a defendant or party in any litigation that may have a material impact on Offeror’s ability to deliver the contracted Services;
1.10 A Statement documenting all open or pending litigation initiated by Offeror or where Offeror is a defendant or party in any litigation with a public sector client;
1.11 Full disclosure of any public sector contracts terminated for cause or convenience in the past five (5) years;
1.12 Full disclosure of any criminal or civil offense.
Offeror Response:
1.1 Date established and ownership:
KUV Consultants, LLC., was formed in May 2003. It has been in business for over 21 years. It is privately owned.
Kal Raman, P.E., is the sole proprietor of KUV Consultants. The company has no full-time employees but works with a team of experienced associates consultants.
1.2 Local Company
KUV Consultants, LLC., is located in Glendale, Arizona. This is the company’s only office. KUV primarily serves municipal and state clients in Arizona, although on occasions, it has extended its services outside of the state.
1.3 Address:
PO Box 10790, Glendale, AZ 85318-0790
1.4 Business Operations:
Company’s philosophy is to partner with its clients (water/wastewater utilities) to find solutions for their business and operational readiness and resilience.
Since 2004, KUV has provided its technical services to over 75 water systems in Arizona through its contract with ADEQ. These water systems typically serve less than 10,000 people. Most of the projects have been through ADEQ’s Capacity Development Program. Projects included:
• System evaluation
• Asset management plan
• Security vulnerability assessment (to comply with Bioterrorism Act)
• Risk and resilience assessment (to comply with America’s Water Infrastructure Act)
• Emergency response plan
• Operation & maintenance plan
• Treatability and water quality studies
• Tool developments, such as TMF Assessment Tool, Lead and Copper Inventory Predictive Tool, etc.
• Training for operators and utility managers
1.5 Organizational Chart:
1.6 Full Disclosure:
KUV Consultants does not have any potential conflict of interest between it and any State employee who functions or has responsibilities in the review or approval of the undertaking or carrying out of the Contract.
1.7 Bankruptcy:
KUV Consultants has not, in the last five (5) years, filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors.
1.8 Security Exchange Commission:
Not applicable. KUV Consultants is a private company and is not governed by the Securities Exchange Commission.
1.9 Litigation:
KUV Consultants does not have any open or pending litigation initiated by it or as a defendant or party in any litigation that may have a material impact on its’s ability to deliver the contracted Services.
1.10 Litigation – Public Sector:
KUV Consultants does not have any open or pending litigation initiated by it or where it is a defendant or party in any litigation with a public sector client.
1.11 Contract Termination:
KUV Consultants does not have any public sector contracts terminated for cause or convenience in the past five
(5) years.
1.12 Criminal or Civil Offense:
KUV Consultants does not have any criminal or civil offense charges against it.
2.0 Company Experience
2.1 If Offeror is proposing to provide services for Item #3 - Capacity Development Training (technical, managerial, financial), from Table 1, on page 3, Offeror shall respond to the following question #1:
Question 1:
ADEQ offers technical, managerial and financial training through its Capacity Development program. Does your company have experience providing training, in person and/or virtual, on topics of water system operations and management? What subject matter are you offering to train on and what is the level of expertise of the proposed trainer(s)?
Offeror Response:
KUV Consultants has been providing its training services to ADEQ’s Capacity Development for the past 10+ years. We have designed and delivered one-day and two-day in-person workshops for ADEQ at various locations around the state. We have also conducted ½-day webinars. In accordance to ADEQ’s needs, we our training targets operators, managers and other stakeholders related to the water sector. Training topics have included:
• Operator certification training (Water Treatment Grades 1-4; Water Distribution Grades 1-4; Math)
• Treatment processes and water quality issues
• Operation and management of water utilities, including asset management planning
• Security, resilience and emergency preparedness and response
All our trainers (Kal Raman, Joe Corneo, Paul Cornejo and Kwrry Leib are subject matter experts in some or all of the above topics).
2.2 Project Descriptions:
For each deliverable from Table 1, on page 3, that the Offeror is proposing to provide:
Submit up to three (3) examples of your previous work as well as years of experience providing this deliverable. An example might cover more than one deliverable depending on the project. At the top of each page, include the deliverable “Item #(s)” and “Deliverable Description(s)” title from the table below. Limit each example to one (1) page. Use font size 10 pt or greater.
Each example shall include the following information:
a. Project Name;
b. Project Location (City and State);
c. Estimated Project Cost;
d. Project Begin and End Date;
e. Brief Description of the Project; and
f. Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Offeror Response:
Select each of the item(s) that your firm is proposing to provide from the Table 1 below:
Table 1:
| Item | # | Check | Box | Deliverable | Description |
| 1 | Asset | Management | Plans |
2 Capacity Development Activities
3 Capacity Development Training (technical, managerial, financial)
4 Construction Administration & Construction Management
5 Design of water system improvements
6 Developing regulatory plans (e.g., O&M, EOP, ERP, cybersecurity)
7 Drinking water permit applications (e.g., ATC, AOC, APP, AZPDES)
8 Funding assistance (e.g., PPL, PFA, RD-Apply)
9 Legal assistance (e.g., forming corporate status, corporate documents)
10 Median Household Income Surveys
11 Preparing Corrosion Control Assessments & Treatment Recommendations
12 Preparing Environmental Documents/Archeological Surveys
13 Preparing Preliminary Engineering Reports (PER)
14 Rate studies, rate reviews, rate cases
15 Risk & Resiliency Assessments
16 System Evaluations
17 Water Loss Audits & Leak Detection
18 Water Master Planning
19 Water Quality Compliance Options Reports
20 Well Evaluations including water level measurements, zonal sampling & video logging
Item # 1
Deliverable Description Asset Management Plans
Project Name Clay Springs DWID
Location Navajo County, Arizona
Project Cost $3,000
Begin date September 2023 End Date November 2023
Project Description Developed an asset management plan f(AMP) or the water system. The plan included an inventory of assets and their descriptions, cost estimate and timetable for asset improvements and an annual budgeting requirement to implement the AMP.
Key Personnel Project Manager: Kal Raman Key Personnel: Kal Raman
Project Name Lil W Ranch Water System
Location Gila County, Arizona
Project Cost $2,500
Begin date March 2024 End Date July 2024
Project Description Developed an asset management plan f(AMP) or the water system. The plan included an inventory of assets and their descriptions, cost estimate and timetable for asset
Key Personnel Project Manager: Kal Raman Key Personnel: Paul Cornejo, Kal Raman
Project Name Town of Duncan
Location Town of Duncan, Cochise County, Arizona
Project Cost $3,000
Begin date August 2022 End Date November 2022
Project Description Developed an asset management plan f(AMP) or the water system. The plan included an inventory of assets and their descriptions, cost estimate and timetable for asset
Item # 2
Deliverable Description Capacity Development Activities
Project Name Development of System Evaluation Questionnaire
Location ADEQ
Project Cost $2,500
Begin date July 2010 End Date August 2010
Project Description Developed a questionnaire for ADEQ staff and contractors to use during interviewing water system personnel for System Evaluation studies.
Project Name Development of TMF Questionnaire
Location ADEQ
Project Cost $7,500
Begin date July 2022 End Date August 2022
Project Description Developed a questionnaire for ADEQ staff and contractors to use during interviewing water system personnel for Technical, Management and Finance capacities
Key Personnel Project Manager: Kal Raman Key Personnel:
Kal Raman, Dr. Brett Duarte
Project Name Lead and Copper Service Line Screening Tool
Location ADEQ
Project Cost $15,000
Begin date January 2023 End Date April 2023
Project Description Developed a probability-based model for utilities, ADEQ staff and contractors to use to compile an inventory of lead and copper service lines
Key Personnel Project Manager: Kal Raman Key Personnel:
Kal Raman, Dr. Brett Duarte
Item # 3
Deliverable Description Capacity Development Training (technical, managerial, financial)
Project Name ADEQ-AZWARN Workshop on Security, Resilience and Emergency Preparedness
Location Phoenix, Arizona
Project Cost $5,500
Begin date November 2023 End Date April 2024
Project Description Conducted an 8-hour in-person workshop for water utilities and stakeholders. Involved coordinating between ADEQ, AZWARN, EPA, DHS and FBI.
Key Personnel Project Manager: Kal Raman Key Personnel: Kal Raman, Kerry Leib
Project Name Operator Leadership Development, ADEQ Workshop
Location Tempe, Arizona
Project Cost $5,500
Begin date October 2023 End Date January 2024
Project Description Created and delivered presentations on Effective Planning and Task delegation and Future Workforce Development. Conducted a 2-hour tabletop discussion-based exercise.
Project Name Operator Certification Training, ADEQ Workshop
Location Pinetop, Arizona
Project Cost $3,600
Begin date October 2023 End Date October 2023
Project Description Created and delivered presentations on operator certification training
Key Personnel Project Manager: Kal Raman Key Personnel: Joe Cornejo
Item # 6
Deliverable Description Developing regulatory plans (e.g., O&M, EOP, ERP, cybersecurity)
Project Name City of Winslow
Location Winslow, Arizona
Project Cost $3,500
Begin date July 2020 End Date September 2020
Project Description Developed an Emergency Response Plan to comply with America’s Water Infrastructure Act (AWIA)
Key Personnel Project Manager: Kal Raman Key Personnel: Kal Raman, Paul Cornejo
Project Name Camp Verde Water System
Location Camp Verde, Arizona
Project Cost $3,500
Begin date January 2021 End Date April 2021
Project Description Developed an Emergency Response Plan to comply with America’s Water Infrastructure
Project Name Rose Valley Water Company
Location Peoria, Arizona
Project Cost $3,500
Begin date January 2021 End Date June 2021
Project Description Developed an Emergency Response Plan to comply with America’s Water Infrastructure
Item # 15
Deliverable Description Risk & Resiliency Assessments
Project Name Camp Verde Water System
Location Camp Verde, Arizona
Project Cost $5,500
Begin date January 2021 End Date April 2021
Project Description Developed an Emergency Response Plan to comply with America’s Water Infrastructure
Project Name Rose Valley Water Company
Location Peoria, Arizona
Project Cost $5,500
Begin date January 2021 End Date June 2021
Project Description Developed an Emergency Response Plan to comply with America’s Water Infrastructure
Project Name City of Winslow
Location Winslow, Arizona
Project Cost $5,500
Begin date July 2020 End Date September 2020
Project Description Developed an Emergency Response Plan to comply with America’s Water Infrastructure
Item # 16
Deliverable Description System Evaluation
Project Name Clay Springs DWID
Location Navajo County, Arizona
Project Cost $4,500
Begin date September 2023 End Date November 2023
Project Description Conducted a comprehensive evaluation of the water system. Evaluation considered system’s physical infrastructure, regulatory compliance, operation, management and finances, and security readiness and emergency preparedness. Made specific recommendations to improve system capacity and ensure a reliable and resilience service.
Project Name Lil W Ranch Water System
Location Gila County, Arizona
Project Cost $4,500
Begin date March 2024 End Date July 2024
Project Description Conducted a comprehensive evaluation of the water system. Evaluation considered system’s physical infrastructure, regulatory compliance, operation, management and finances, and security readiness and emergency preparedness. Made specific recommendations to improve system capacity and ensure a reliable and resilience service.
Key Personnel Project Manager: Kal Raman Key Personnel: Paul Cornejo, Kal Raman
Project Name Town of Duncan
Location Duncan, Cochise County, Arizona
Project Cost $5,000
Begin date August 2022 End Date November 2022
Project Description Conducted a comprehensive evaluation of the water system. Evaluation considered system’s physical infrastructure, regulatory compliance, operation, management and finances, and security readiness and emergency preparedness. Made specific recommendations to improve system capacity and ensure a reliable and resilience service.
Item # 19
Deliverable Description Water Quality Compliance Options Reports
Project Name Assessment of Nitrate Compliance Options, Alma Ranchettes Water
Location Maricopa County, Arizona
Project Cost $8,500
Begin date October 2017 End Date June 2018
Project Description Conducted a comprehensive evaluation of the water system. Identified various alternatives for the system to comply with the nitrate drinking water standards. Met with stakeholders.
Provided cost alternatives.
Project Name Assessment Of Uranium Compliance Options, Kelvin-Simmons Water Coop
Location Pinal County, Arizona
Project Cost $8,500
Begin date November 2017 End Date January 2018
Project Description Conducted a comprehensive evaluation of the water system. Identified various alternatives for the system to comply with the uranium drinking water standards. Met with stakeholders. Provided cost alternatives.
Key Personnel Project Manager: Kal Raman Key Personnel: Kal Raman; Dale Kurth
Project Name Arsenic Compliance Evaluation, Jake’s Corner Water System
Location Gila County, Arizona
Project Cost $8,500
Begin date November 2015 End Date January 2016
Project Description Conducted a comprehensive evaluation of the water system. Identified various alternatives for the system to comply with the arsenic drinking water standards. Met with stakeholders.
Provided cost alternatives.
3.0 Financial/Accounting Information
After the proposal due date, Offeror must provide evidence of financial stability and capability to fund all costs associated with providing the relevant Services throughout the term of the Contract. See details as provided in RFP Solicitation Special Instructions to Offerors, Section 7.0 Financial Stability. DO NOT submit financial information with Offer at this time.
4.0 Certificates/Licenses
Submit copies of all applicable certificates and licenses that support Offeror’s ability to provide the proposed services, including any Arizona required business license(s) to provide these services. At a minimum, this shall include all certifications and licenses referenced in the Solicitation Attachment 8 - Organization Profile.
5.0 Proposed Project Members and Organization
Offeror to complete an Attachment 6 – Key Personnel form to identify each Key Personnel.
See Attachment 8 – KUV business certification and Kal Raman, PE certification
6.0 Subcontractors
Offeror to complete Attachment 9 – Proposed Subcontractors to identify Proposed Subcontractors to be utilized to perform services within a resultant contract.
Solicitation Attachment – Method of Approach | Revision No. 1 | Revised 11-22
File details come from the government source that posted it. Updated .