1-06.2025.ODOTOhio.01_60__Skylift_SBA55i-MH.pdf

PDF 374 KB Posted

Attached to
Competitive Selection OH|DOT01526-2
Contract number
DOT01526-2
Issued by
Ohio

About this file

This document is a sales proposal from Jack Doheny Companies (JDC) for a 60' Skylift SBA55i-MH material handling vehicle, specifically prepared for the Ohio Department of Transportation (ODOT) located in Columbus, Ohio. The proposal is dated 6/9/2025 and is associated with JDC's Branch 1400 and a specific contract identification number 06.2025.ODOTOhio.01.

The proposed vehicle is a telescoping/articulating material handler with an insulated boom capable of a 60' working height and rated for 46KV Category C insulation. The base module, body, and installation pricing is $199,900.00, which includes delivery to ODOT and training. The unit requires a chassis with a 26,000 lb GVWR or higher, which is not included in the price. Optional upgrades are available, including a body construction upgrade from steel to aluminum for an additional $15,000 and a bucket size upgrade from 24"x30" to 24"x48" for $4,250. The lead time is estimated at 120-180 days from receipt of order, with a preference for boom and installation to be completed in Lorrain, OH. The pricing is valid for 30 days from the proposal date.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 6/9/2025 Branch: 1400

60' Skylift SBA55i-MH - Telescoping/Articulating - Material Handler - Insulated

ODOT Ohio

1980 West Broad St

Columbus, OH 43223

CRM ID:

1 JDC ID: 06.2025.ODOTOhio.01 60' Skylift SBA55i-MH

WWW.TEAMJDC.COM

60' Skylift SBA55i-MH - Telescoping/Articulating - Material Handler – Insulated

ADDITIONAL PRODUCT FEATURES INCLUDE:

-Working Height: 60’ -Insulation: 46KV Category C per ANSI 92.2 -Unlimited Work Zone with Jib Capacity Zones -Bucket: 24”x30” side mount bucket w/ outside step and 180 deg rotator -Bucket Capacity: 400 lbs w/ Jib, 500 lbs w/o jib -Max Jib Capacity: 1,000 lbs -Winch Rope: 7/16” x 75’ Composite Double Braid (3,400 lb WLL at 5:1 SF) -Front A-Frame Outrigger -Rear A-Frame Outriggers

MAKE: Skylift MODEL: SBA-55i-MH BOOM STYLE: Telescoping/Articulating JIB STYLE: Hydraulic, Articulated & Actuated Fiberglass Insulated Gap in Upper & Lower Boom Lower Controls on Turret:

Platform Leveling, Winch, Boom Rotation Inner Boom Extend/Retract Outer Boom & Lower Boom Raise/Lower Emergency Stop for Lower & Upper Controls Engine Stop/Start Emergency Power – 30 Second Intermittent Switch Upper Controls: 4axis pistol grip non-metallic isolated control Upper & Lower Boom Raise/Lower Boom Rotation Upper Boom Extend/Retract Hydraulic 180 Deg Bucket Rotator & Leveling Hydraulic Tool Circuit at the Bucket Engine Stop/Start & Hydraulic Stop at Bucket Emergency Power Jib Function Controls: Extend, Tilt, and Winch

STANDARD EQUIPMENT

Continuous/Unrestricted Rotation Open Center Hydraulic System Full Pressure Controls O-Ring Face Seal Fittings above rotation Fully enclosed slew drive for rotation Boom/Outrigger Control Outrigger Raise/Lower Controls at each side with Slope Indicators & Outrigger Indicator Light Outrigger Safety Interlocks Audible Alarms on Outriggers Front Boom Rest with manual tie-down strap Mid Boom Rest with manual tie-down strap Rear Bucket Rest Open Design Turret Design for Maintenance Ease Keyed Outrigger Interlock Override Box on Turret

(4) Slope Indicators on the Body Emergency Pump with Momentary Toggle for Intermittent 30 Second Use Bucket Liner with Rubber Floor Mat Ground Lug

BODY

Full Size Steel Line Body Shelving & Dividers and Material Hooks – Varies per bin Stainless Steel door hinge rods and hinge blocks 28” Side Entry with step, (2) grab handles, & bed board Stainless steel automotive rotary type door latches Chain stops on vertical & horizontal doors Master door locking system FMVSS Exterior Lighting

Wheel Chock Storage on Curbside Outrigger Storage on both sides for 2 pads each 30” Rear TailShelf with Entry Step w/ Handles and Grip-Strut Bucket Entry Step on Each Side Powder Coat DB White Grey Zolatone on compartment interiors Non-Skid on Bed, Compartment Tops, & Bed Sides

ACCESSORIES

(2) Front Amber Strobe Lights

(2) Rear Amber Strobe Lights

3/8” LED Rope Lights in all compartments 10lb Fire Extinguisher and Bracket

(4) 18” Traffic Cones & Strap

(4) Plastic 18”x18”x1.5” Outrigger Pads

60' Skylift SBA55i-MH - Telescoping/Articulating - Material Handler - Insulated

EXCEPTIONS

3B: Steel Line Body 4B: Non-Skid on Bed, Compartment Tops, & Bed Sides

Proposal Summary

Module, Body, & Install pricing: 199,900.00$ boom, body, install, delivery to ODOT & training included Chassis is not included LeadTime: 120-180 days from receipt of order OHIO PREFERENCE: Boom & install is completed in Lorrain OH

Chassis:

Unit will require a 26,000 lb GVWR or higher chassis.

Please contact JDC to confirm minimum chassis requirements

Prices Valid: 30 Days

OPTIONS

Body Construction Upgrade: Steel to Aluminum $15,000.00 Bucket Upgrade: 24"x30" to 24"x48" 500lb Bucket $4,250.00 No Material Handler (Jib Winch Removed) EACH -$10,000.00 deduct

Customer:

By:

Date:

Email:

Terms and Conditions

***Surcharges or rate increases issued by manufacturer that affect this quote following quote acceptance, but prior to order delivery, will be the responsibility of Buyer. Any surcharge or increase that is applied to this purchase will be applied at same cost as issued by manufacturer.***

• Acceptance of this Proposal is subject to availability of the Equipment listed above.

• Sales Price does not include any applicable sales taxes. Buyer is responsible for and agrees to pay all applicable sales tax.

• The Sale of New Equipment Terms and Conditions are incorporated into and made a part of this Proposal upon acceptance and execution of this Proposal by both parties.

• Execution of this Proposal by Seller and Buyer constitutes a binding agreement between the parties.

• If this Proposal is not executed by both parties within thirty (30) calendar days from the

Proposal Date, this Proposal shall become null and void, unless subsequently executed by both Buyer and Seller.

Thank you for your consideration of this proposal.

This proposal becomes a contract for delivery and payment of the merchandise listed above only when signed by the customer or one of its officers.

Sincerely yours, Mick Gerber Mick Gerber Vice President - Electric Utility Products Group 317/617-1404 MickGerber@TeamJDC.com

Purchase Order#:

1. THE AGREEMENT. Jack Doheny Companies, Inc., (the “Seller”) agrees to sell, transfer and convey its right, title and interest in the new goods, equipment, vehicles and/or other new items (collectively, the “Equipment”) described in Seller’s written Invoice for the Sale of New Equipment (the “Invoice”) to the Buyer subject to the terms and conditions contained herein, which are incorporated into the Invoice, agreed to by the parties hereto, and together consists of the entire agreement between the Seller and Buyer (collectively, the “Agreement”). The Agreement shall be for the benefit of the Seller and Buyer and not for the benefit of any other person or entity. Prior courses of dealing, trade usage and verbal agreements not reduced to a writing signed by the Seller and Buyer, to the extend they differ from, modify, add to or change from the Agreement shall not be binding on the Seller .

2. TERMS OF PAYMENT.

2.1 Payment Date. All payments for the Equipment are due from Buyer on the date of the invoice unless other terms are agreed to in writing between Seller and Buyer. Payment shall be made to Seller at the address specified in the Agreement, without any offset or deduction for any reason.

2.2 Shipping Delays. If any shipment is delayed at the request of Buyer, payment shall become due based on the date Seller is prepared to make shipment, and Seller may invoice Buyer based on such date. All prices for Equipment are F.O.B. Seller's shipping point.

2.3 Delinquent Payments.

2.3.1 Any payment not made by Buyer on or before its due date shall be subject to a late charge on any unpaid balance at a rate of 18% per annum, or the highest interest rate allowed by law, whichever is greater.

2.3.2 If a payment is not made on or before its due date, Buyer agrees that Seller may elect, in addition to any other remedy at law or in equity, to cease performance under the Agreement and any other agreement between Buyer and Seller until such payment is rendered to Seller .

3. DELIVERY. Seller does not guarantee delivery dates.

4. RISK OF LOSS. Buyer assumes all risk of loss of Equipment upon delivery by Seller to carrier if Equipment is shipped. For Equipment that is shipped, Seller agrees to: (a) prepare the Equipment for shipment to Buyer; (b) deliver custody of the Equipment to carrier; (c) make appropriate arrangements for the transportation to carrier; and deliver documents to enable Buyer to obtain possession of the Equipment. Seller shall not be obligated to obtain insurance or to prepay transportation/carrier costs for the Equipment. Buyer agrees to be responsible for and to timely pay all loading, unloading and other charges incidental to transportation of the Equipment. Whether Seller pays transportation charges or not, risk of loss shall pass to Buyer upon delivery of the Equipment to a carrier.

5. INSPECTION OF EQUIPMENT. Buyer has inspected the Equipment and is satisfied with the Equipment’s condition.

6. INDEMNIFICATION. Buyer shall indemnify, hold harmless and release Seller from any and all liabilities, losses, damages, claims, costs and expenses, including attorney fees, arising out of, in whole or in part, from (a) the design, or manufacture of the Equipment; or (b) the use of the Equipment by Buyer and those acting on Buyer’s behalf.

7. MISCELLANEOUS.

7.1 No Assignment. There shall be no assignment of the Agreement by Buyer without the prior written approval of Seller. Any assignment of the Agreement shall not relieve Buyer of its obligations under the Agreement.

7.2 Force Majeure. Neither party will be liable for any delay or failure to perform its obligations hereunder, other than a payment obligation, due to any cause beyond its reasonable control including without limitation, acts of God or of the public enemy, including terrorists, acts of the government in its sovereign capacity, fires, floods, epidemic, strikes, picketing or boycotts, or any other circumstances caused by natural occurrences or third party actions beyond the reasonable control and without the fault or negligence of the party whose performance is affected (“Force Majeure Events”); provided that the affected party provides the other party prompt notice of the applicable circumstance and uses commercially reasonable efforts to re -commence performance as promptly as possible; provided, further, that if the duration of such Force Majeure Event exceeds thirty (30) days, the other party may terminate the Agreement upon delivery of written notice to the affected party.

7.3 Venue. The parties agree that any dispute under the Agreement shall be brought in the applicable state or federal court located in the county in which the

Originating Branch is located and the parties waive any right to a jury trial.

7.4 Construction and Captions. The parties acknowledge that each has reviewed the Agreement and that the normal rules of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of the Agreement or any exhibits or amendments hereto ;

and that section headings appearing in the Agreement are for convenience of reference only and they are not intended, to any extent or for any purpose, to limit or define the text of any section or any subsection hereof. In the event any part of the Agreement is found to be ambiguous, such ambiguity shall not be construed against any party.

7.5 Entire Agreement. The Agreement constitutes the sole and entire agreement between the parties and supersedes all prior and contemporaneous statements , promises, understandings or agreements, whether written or oral.

7.6 Amendments. The Agreement may be amended, modified or altered at any time upon the approval of the Seller and Buyer; however, any such amendment must be in writing and signed by the Seller and Buyer in order for such amendment to be of any force and effect .

7.7 Partial Invalidity. In the event that any provision of the Agreement is declared by any court of competent jurisdiction or any administrative judge to be void or otherwise invalid, all of the other terms, conditions and provisions of the Agreement shall remain in full force and effect to the same extent as if that part declared void or invalid had never been incorporated in the Agreement and in such form, the remainder of the Agreement shall continue to be binding upon the parties.

7.8 Counterparts. The Agreement and any amendment thereto may be signed and executed in one or more counterparts, each of which shall be deemed an original and all of which together shall constitute one Agreement. Delivery of an executed counterpart of a signature page of the Agreement by facsimile or email shall be effective as delivery of an originally executed counterpart of the Agreement .

7.9 Authority. Each person(s) executing the Agreement as an agent or in a representative capacity warrants that he or she is duly authorized to do so .

NO WARRANTY. SELLER MAKES NO WARRANTIES OR REPRESENTATIONS EXPRESS OR IMPLIED BY OPERATION OF LAW OR OTHERWISE, INCLUDING WITHOUT LIMITATION, ANY IMPLIED WARRANTY OF MARKETABILITY OR FITNESS FOR PARTICULAR PURPOSE, ALL OF WHICH

ARE SPECIFICALLY HEREBY DISCLAIMED. To the extent allowed by law and those agreements, Seller transfers and assigns to Buyer the Equipment manufacturer’s warranties, if any such warranty is provided by the Equipment manufacturer. In no event shall Seller be liable to Buyer for any incidental , consequential, special, exemplary, and/or punitive damages, including without limitations, loss of revenue or profit.

SALE OF NEW EQUIPMENT

TERMS AND CONDITIONS

702-665-5397 info@dohenycompany.com dohenycompany.com

60' Skylift SBA55i-MH.pdf
06.2025.ODOTOhio.01 60' Skylift SBA55i-MH.pdf
Signature Page - Mick Gerber.pdf
Sheet1

T&C's - NEW.pdf

File details come from the government source that posted it. Updated .