1-03 - ITB 2026-005 Bid Sheet (REFERENCE ONLY).xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- ITB 2026-005 Old Town 116 S. Warren Parking Lot
- Solicitation number
- ITB 2026-005
- Issued by
- Johnson County, Texas
About this file
This is a proposal form and bid sheet for the City of Burleson, Texas, for Invitation to Bid (ITB) 2026-005 concerning the Old Town 116 S. Warren Parking Lot project. The project encompasses site preparation and mobilization, stormwater pollution prevention plan (SWPPP) design and implementation, pre-construction video documentation, construction of a dumpster and UTV enclosure, and installation of an irrigation system. The scope includes removal and preparation of existing asphalt and concrete pavements totaling approximately 648 square yards, unclassified fill and grading of 27 cubic yards, installation of lime-stabilized subgrade across 1,260 square yards, placement of 1,100 square yards of HMAC Type "D" and Type "B" pavement, and 160 square yards of concrete paving. Additional work includes pavement markings with 1,174 linear feet of white striping, installation of two light poles with foundations and electrical conduit, and landscaping featuring 52 Lindheimer Muhly plants, 16 yellow yuccas, 1,350 square feet of Bermuda grass sod, and 160 square feet of decomposed granite with metal edging. The contractor must achieve substantial completion within 60 calendar days from notice to proceed.
The bid sheet requires contractors to submit unit prices and extensions for each line item, with prices to be written in both numerical and word formats. Bidders must provide a total base proposal price and are expected to complete all work within the specified 60-calendar-day timeline. The project is anticipated to have a total duration of ninety calendar days as noted in the contract opportunity description. The proposal form requires detailed pricing for labor, materials, and equipment across multiple trade categories including site preparation, pavement work, electrical installation, and landscaping. No information regarding set-asides, incumbent contractors, funding sources, or special contract terms is provided in this bid sheet document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Hall West
PROPOSAL FORM EXHIBIT 'A'
| City of Burleson | |||||
| OLD TOWN 116 S. WARREN PARKING LOT | |||||
| Item | Estimated | Unit | Item Description | Unit Price | Extension |
| No. | Quantity | Total Unit Price Written in Words |
| 101 | 1 | LS | Site Preparation, Mobilization, Bonds, & Insurance | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Lump Sum | $____________ | $______________ |
| 102 | 1 | LS | Design and Implement SWPPP | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Lump Sum | $____________ | $______________ |
| 103 | 1 | LS | Pre-Construction Video Tape of Project | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Lump Sum | $____________ | $______________ |
| 104 | 1 | LS | Dumpster & UTV Enclosure, Complete in Place, Per Plan | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Lump Sum | $____________ | $______________ |
| 105 | 1 | LS | Irrigation System, Complete in Place, Per Plan | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Lump Sum | $____________ | $______________ |
| 201 | 130 | SY | Sawcut & Remove Existing Asphalt Pavement and Concrete Ribbon | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Yard | $____________ | $______________ |
| 202 | 518 | SY | Remove Existing Concrete Pavement | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 203 | 1 | LS | Remove Existing Shrubbery and Implement Tree Protection | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Yard | $____________ | $______________ |
| 204 | 9 | EA | Remove & Salvage Existing Wheel Stop | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 205 | 27 | CY | Unclassified Fill & Grading | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Cubic Yard | $____________ | $______________ |
| 301 | 1,260 | SY | 6" Lime Stabilized Subgrade | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Yard | $____________ | $______________ |
| 302 | 21.0 | TON | Lime at 36 lbs per square yard | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Ton | $____________ | $______________ |
| 303 | 1,100 | SY | 2" HMAC Type "D" Pavement | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Yard | $____________ | $______________ |
| 304 | 1,100 | SY | 4" HMAC Type "B" Pavement | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Yard | $____________ | $______________ |
| 305 | 160 | SY | 6" Concrete Paving | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Yard | $____________ | $______________ |
| 401 | 324 | LF | Pav Surf Prep for Mrk (4") | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Linear Foot | $____________ | $______________ |
| 402 | 1,174 | LF | 4" Wide White Striping | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Linear Foot | $____________ | $______________ |
| 403 | 6 | EA | Thermoplastic Arrow (Straight) | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 404 | 14 | EA | Precast Concrete Wheel Stops | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 501 | 2 | EA | Install Light Pole | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 502 | 2 | EA | Light Pole Foundation | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 503 | 230 | LF | 2" Conduit (PVC SCH 80)(T) | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Linear Foot | $____________ | $______________ |
| 504 | 460 | LF | No. 8 Insulated Electric Conductor | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Linear Foot | $____________ | $______________ |
| 505 | 230 | LF | No. 8 Bare Electric Conductor | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Linear Foot | $____________ | $______________ |
| 601 | 52 | EA | Lindheimer Muhly (5 gal) | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 602 | 16 | EA | Yellow Yucca (5 gal) | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Each | $____________ | $______________ |
| 603 | 1,350 | SF | Bermuda Grass Solid Sod | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Foot | $____________ | $______________ |
| 604 | 160 | SF | 4" Decomposed Granite | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Square Foot | $____________ | $______________ |
| 605 | 50 | LF | Metal Edging - 1/8"X4" | ||
| ___________________________________ | |||||
| __________________________Dollars and | |||||
| ______________________________Cents | |||||
| Per Linear Foot | $____________ | $______________ |
Total Base Proposal
______________________________Dollars and
______________________________Cents $
Construction Time: Offeror shall complete the work within 60 calendar days from notice to proceed to substantial completion.
&11Proposal Form Exhibit 'A' - &P