07_QALI.pdf

PDF 888 KB Posted

Attached to
B-1 Mode Selector Federal contract opportunity
Solicitation number
FA8213-20-R-3019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and details of a related federal contract opportunity for B-1B mode selectors. The quality assurance letter outlines inspection requirements for the contractor, including mandatory stamp and signature verification on documentation, witnessing of testing, verification of leak testing and explosive weights, sample selection for lot acceptance testing, and review of ammunition data cards and preparation for shipment. The related federal contract opportunity is a solicitation to procure 48 B-1B mode selectors from Chemring under sole-source authority as the only responsible source to meet agency requirements, with a period of performance through May 2021. The solicitation includes line items, national stock numbers, part numbers, descriptions, quantities, delivery dates and destinations for the mode selectors and associated data.

View the file

Other files for this federal contract opportunity

Other files attached to B-1 Mode Selector, newest first.
File Type Posted
10_Repair_and_Rework.pdf PDF
09_CADPAD_Item_Marking_Instruction _Ver1_5_20190501.pdf PDF
05_Engineering_Data_List.pdf PDF
11_SourceQual.pdf PDF
08_SPI_F012374417.pdf PDF
02_REPSHIP_11_Mar_14.pdf PDF
04_SOW_Special_Packaging_Instruction.pdf PDF
06_Item_Description.pdf PDF
03_Attach2_ADC_SOW_Jan_2018.pdf PDF
DD1423.pdf PDF
01_AIRSPEC_9Sep19.pdf PDF
FA821320R3019.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46:
2019-06-10T14:44:58-0600
SWANSON.DEVIN.D.1385800432
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 6039100
DODIC: SY14
Text20:
Text19:
Part Number Line 2:
Contract No: 20-50097
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1B Mode Selector

File details come from the government source that posted it. Updated .