01_AIRSPEC_9Sep19.pdf
PDF 24 KB Posted
- Attached to
- B-1 Mode Selector Federal contract opportunity
- Solicitation number
- FA8213-20-R-3019
About this file
This document outlines requirements for a federal contract to provide B-1 Mode Selectors. The contractor shall deliver 48 mode selectors per line item 0001, with an NSN of 1377012374417ES and part number 6039100, by May 31, 2021 to Tinker Air Force Base. Line item 0002 requires data in accordance with the attached DD 1423-1 exhibit. The solicitation will utilize electronic procedures and all responsible sources may submit a capability statement, proposal, or quotation for consideration by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. The procurement is a sole-source award to Chemring under the one responsible source authority, with no other sources eligible to become qualified. The contractor must comply with Defense Federal Acquisition Regulation Supplement clauses on safety precautions for ammunition and explosives, and changes to performance location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 05_Engineering_Data_List.pdf | ||
| 11_SourceQual.pdf | ||
| 10_Repair_and_Rework.pdf | ||
| 09_CADPAD_Item_Marking_Instruction _Ver1_5_20190501.pdf | ||
| 07_QALI.pdf | ||
| 08_SPI_F012374417.pdf | ||
| 02_REPSHIP_11_Mar_14.pdf | ||
| 04_SOW_Special_Packaging_Instruction.pdf | ||
| 06_Item_Description.pdf | ||
| 03_Attach2_ADC_SOW_Jan_2018.pdf | ||
| DD1423.pdf | ||
| FA821320R3019.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION
FD2020-20-50097
Amended 9 Sep 2019
NSN: 1377012374417ES
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A REPSHIP shall include all the following data in accordance with Attachment 1.
2. Department of Defense Identification Code (DODIC): SY14
3. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)
4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1 May 2019, reference attachment.
5. Shelf Life Code marking NOT required per MIL-STD-129.
6. Hazard Classification Information:
NSN 1377012374417ES
Hazard Class Division: 1.4 Storage Compatibility Group: S DOT Marking: RELEASE DEVICES, EXPLOSIVE DOT Class: 1.4S DOT Label: Explosive 1.4S UN Serial Number: 0173 UN Proper Shipping Name: RELEASE DEVICES, EXPLOSIVE NEW 0.001300 lbs
Net Explosive Weight NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC.
If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
7. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:
COGNIZANT GOVERNMENT ENGINEER
ECPs -- CDRL (DI-SESS-80639D) NORs – CDRL (DI-SESS-80642D) RFVs – CDRL (DI-SESS-80640D)
Distribution Statement: B, Reason: Administrative or Operational (ref. DoD 5230.24)
8. Item(s) must pass both gross and fine leak checks. MIL-STD-883K(2), Method 1014.16 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A)
9. Lot Acceptance Test Requirements are: IAW latest Government approved ATP. Contractor
10. The contractor shall furnish a Lot Acceptance Test/Inspection Report in WAWF
CDRL: (DI-NDTI-80809B)
11. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization: AFLCMC/EBHJ Organization E-mail: devin.swanson@us.af.mil
12. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)
13. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.
14. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (30TUhttp://www.pmddtc.state.gov/regulations_laws/itar.htmlU30T).
15. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this http://www.pmddtc.state.gov/regulations_laws/itar.html specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
16. Percussion primers shall have been certified/recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.
17. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: See attached QALI.
18. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment 5, Clause ES7034)
19. Contracts involving ammunition and explosives (AE) will contain:
- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments
File details come from the government source that posted it. Updated .