The related federal contract opportunity is a Request for Quotation (RFQ) under Solicitation Number 1240BK24Q0057 for the supply and installation of five fire command vehicle RLS packages. The solicitation is a total small business set-aside with a NAICS code of 811198 and a $10 million size standard. The contract will be firm-fixed price, and quotes are due by April 26, 2024. Award will be made to the quoter providing the best value to the government based on technical capability, delivery schedule, and price. Delivery is required by June 15, 2024 to the USDA Forest Service Fremont-Winema Fleet Management location in Lakeview, Oregon.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished3
5.0 Deliverables / Schedule3
6.0 Travel4
7.0 Contractor’s Key Personnel4
8.0 Security Requirements4
9.0 Data Rights4
10.0 Section 508 – Electronic and Information Technology Standards4
Attachment4

Project 0602_Fremont-Winema National Forest Fire Overhead Command Vehicle RLS Package and Striping-5 Vehicles

General Information

1.0 Scope of Work

Provide a brief statement of the overall project, including goals and objectives.

This is a procurement and installation service contract for five marked Fire Command vehicle. Contractor shall install equipment items for Fire RLS Package per Forest Service Standards with graphic install included.

2.0 Background

Provide a general description of the requirement, describing the acquisition history (if applicable), the current environment, and the vision of the future of the requirement. If information technology is a factor, provide pertinent technical facts.

Install RLS packages on new Fire Command vehicles per specifications and Forest Service standards.

Contractor Requirements

3.0 Technical Requirements / Tasks

Describe the specific tasks or work the contractor must perform. Provide direction on any specific methodologies.

The vendor will work with the technical representative on any issues arising due to changes in industry standard or questions or conflicts with the region’s standardization requirements.

When materials are not specified, the vehicle and all parts thereof shall be furnished to provide the intended function, durability, safety, and maintain good long-tern appearance. All materials shall be new, shall be suitable for the intended purpose, and shall be free of any characteristics or defects in material and workmanship, which may affect the performance, function, durability, and serviceability of the finished vehicle, or detract from its appearance.

The government reserves the right to make the final determination of the suitability of all components and their arrangement on and in the vehicle

All conversions and modifications shall conform to all requirements of the OEM's Modifier/Upfitter Guide. The contractor shall ensure that the application and installation of major subcomponents and systems are compliant with subcomponent vendors' requirements and recommendations.

Parts will not be installed in such a manner as to void the vehicle manufactures warranty for new vehicles.

Examples of shop stock items:

This list is not all inclusive of all miscellaneous shop stock that may be required, and the vendor will utilize current industry standards of highest quality and durability.

-Wiring -Connectors -Wiring conduit

- Nuts/bolts -Heat shrink and external components must have climate sealed connections.

-Other shop stock items need to complete the install correctly

4.0 Government Furnished

List any government-furnished support, data, property or facilities. Describe government responsibility for reviewing and approving reports and final products generated under the contract. If the contractor will require access to government facilities, identify the facility location and specific area. Identify any federal holidays or other times when access may be restricted.

Graphics and striping packages that meet Forest Service Standards.

5.0 Deliverables / Schedule

All written deliverables shall be phrased in layperson language.

Supply and install items listed on parts list.

6.0 Travel

Identify any travel requirements, locations involved, number of trips (if known), and duration of anticipated travel. Specify responsibility for travel reimbursement, e.g., the contractor or the Government. If the travel will be reimbursed by the Government, discuss the method of reimbursement, e.g., in accordance with Federal/agency travel regulations. State the Government official authorized to approve contractor travel, e.g., the Contracting Officer or Contracting Officer Representative.

Vehicles can be delivered to a vendor within 200 miles of Lakeview, OR by the Agency, if vendor is located beyond 200 miles from Lakeview, OR pickup and delivery will be required.

7.0 Contractor’s Key Personnel

Describe positions which are considered key to successful performance of the contract and the information required to support key personnel qualifications, e.g., experience which correlates to SOW requirements, education, and past performance on similar projects. Specify if resumes are required and provide resume format if appropriate.

Contractor to provide technician certified to install and inspect RLS package components.

8.0 Security Requirements

Specify security requirements that apply to the contract performance. Specify the level of clearances required and identify positions that are applicable.

N/A

9.0 Data Rights

If data is to be produced, furnished, acquired, or used in meeting contract requirements, delineate the respective rights and obligations of the government and the contractor regarding the use, production, and disclosure of that data.

N/A

10.0 Section 508 – Electronic and Information Technology Standards When information technology is to be acquired, include language describing Section 508 requirements.

N/A

Attachment If applicable, include an Attachment stating Evaluation Factors and significant Subfactors representing the key areas of importance and emphasis to be considered in the source selection decision.