About this file
This is a project specification and bidding document prepared by the Illinois Department of Natural Resources (IDNR), Office of Mines and Minerals, Abandoned Mined Lands Reclamation Division for the OK Mine Reclamation Project (AML-BScE-2402) located in St. Clair County near Marissa, Illinois. The project involves the reclamation and remediation of an abandoned coal mine site, including special excavation of mine shafts, refuse area treatment, debris pit creation, erosion control measures, and site restoration. Key work items include special clearing (1 SUM), earth excavation (7,400 CU YD), mine refuse excavation (3,700 CU YD), special excavation (373 CU YD for main shaft, 150 CU YD for air shaft), seedling installation (660 and 360 ACRE), various fertilizer and nutrient applications (180-360 pounds), limestone treatment (30.8 tons), and mulching (2 acres). The project specifications include detailed drawings and cross-sections for shaft details, refuse area treatment, debris pit design, and temporary erosion control systems. A pre-bid meeting will be held on-site, with specific dates and details referenced in the BidBuy posting.
The project is funded by the United States Department of Interior Federal Office of Surface Mining through the Bipartisan Infrastructure Law Abandoned Mined Land Grant Program. The document identifies specific rates and remarks for each line item, with construction beginning in October 2025 and a mowing operation scheduled for May 15, 2026. The contractor is responsible for site familiarization, utility location and protection, temporary erosion and sediment control implementation, field engineering services as specified in the special provisions, and repair or restitution of any damages caused during construction. All disturbed areas within construction limits are to be amended with agricultural ground limestone, fertilizer nutrients, seed, and mulch at specified rates. The construction limits must be staked prior to construction, and the contractor bears responsibility for maintaining all onsite access roads during and after construction to the engineer's satisfaction.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS:
BOONE MC HENRY
PUTNAM
C A
L H
O U
N
JERSEY
BOND
E D
W A
R D
S
LAKEWINNEBAGOJO DAVIESS STEPHENSON
CARROLL
WHITESIDE
OGLE
LEE
DE KALB KANE COOK
DU PAGE
KENDALL WILL
LA SALLE
GRUNDY
KANKAKEE
LIVINGSTON
IROQUOIS
WOODFORD
MC LEAN
FORD
DE WITT
MACON
PIATT
VERMILION
CHAMPAIGN
DOUGLAS EDGAR
MOULTRIE
STARK
PEORIA
MARSHALL
HENRY BUREAU
KNOX
ROCK ISLAND
MERCER
WARREN
H E
N D
E R
S O
N
HANCOCK
ADAMS
MC DONOUGH
SCHUYLER
FULTON
TAZEWELL
MASON
LOGAN
BROWN
PIKE
CASS
MORGAN
SCOTT
MENARD
SANGAMON
CHRISTIAN
SHELBY
COLES
CLARK
JASPER
CUMBERLAND
RICHLAND LAWRENCE
WABASH
CRAWFORD
FAYETTE
EFFINGHAM
CLAY
MARION
WAYNE
JEFFERSON
HAMILTON WHITE
SALINE GALLATIN
POPE HARDIN
FRANKLIN
WILLIAMSON
MONROE
WASHINGTON
RANDOLPH PERRY
JACKSON
UNION JOHNSON
PULASKI MASSAC
A
LE
X A
N D
E R
GREENE MACOUPIN
MADISON
MONTGOMERY
ST. CLAIR
CLINTON
St. Clair County OK Mine
PRE-BID MEETING
OK Mine Reclamation Project AML-BScE-2402 St. Clair County
PAD IL-1210
Funded by the United States Department of Interior Federal Office of Surface Mining
1. Cover Sheet
2. Summary of Quantities/General Notes/Location Map
3. Overview
4. Refuse Area
5. Mine Shafts / Debris Pit Details
6. Refuse/ Mine Marker/ Sign Details IDOT Standard 280001-07: Temporary Erosion Control Systems
Lance Range, Manager AMLR Division Office of Mines and Minerals
Thaddeus J. Faught IL Licensed Professional Engineer No. 062.069058
Prepared By IDNR Staff
Approved for Bidding:
Ronnie Huff, Director Office of Mines & Minerals Illinois Dept. of Natural Resources
Approved By: Approved By:
A Pre-bid meeting for this project will be held on-site. Please refer to the BidBuy posting for more details.
S ta te o f I lli no is
D ep ar tm en t o f N at ur al
R es ou rc es O ffi ce o f M in es a nd
M in er al s A ba nd on ed
M in ed L an ds
R ec la m at io n D iv is io n
S he et
D ra w n
B y:
C h ec ke d B y:
D at e:
S um m ar y of Q ua ni tie s
G en er al
N ot es / L oc at io n
M ap of
B S w is he r
/2
O
K M in e
P A
D
IL
-1
R ec la m at io n
S t.
C la ir C ou nt y A
M L-
B S cE -2
SITE LOCATION
MILE
0 1 2
451 White Oak Mine RD Marissa, IL 62257
K
JG
oe tz
/2
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
326'
310'
207'
175'
143'
111'
79'
47'
50'
50'
50'
50'
50'
50'
300'
15'
488489
S ta te o f I lli no is
D ep ar tm en t o f N at ur al
R es ou rc es O ffi ce o f M in es a nd
M in er al s A ba nd on ed
M in ed L an ds
R ec la m at io n D iv is io n
S he et
D ra w n
B y:
C he ck ed
B y:
D at e:
O ve rv ie w of
B S w is he r
/2
O
K M in e
P A
D
IL
R ec la m at io n
S t.
C la ir C ou nt y A
M L-
B S cE -2
CONCRETE PAD
TO BE REMOVED
36'X16'
14 CU YD
MAIN SHAFT EXCAVATION
373 CU YD
DETAILS A1 SHEET 5
AIR SHAFT EXCAVATION
150 CU YD
DETAILS A2 SHEET 5
CONCRETE STRUCTURES
TO BE REMOVED
72 CU YD
REFUSE AREA
3700 CU YD REFUSE
3700 CU YD SOIL
7400 CU YD TOTAL
DETAILS B1 SHEET 4
EXCESS FILL AREAS
DEBRIS BURIAL PIT
20'X14'X16' DEEP
166 CU YD
DETAILS A3 SHEET 5
SILT FENCE
750'
DETAILS SHEET 7
0 50 100
CONSTRUCTION LIMITS
SEE SHEETS 4,5 & 6
FOR DETAILS
N:2419941 E:571380
N:2419557 E:571483
N:2420149 E:571328
N:2420307 E:571110
N:2420518 E:570709
N:2420508 E:570701
N:2420381 E:570899
Legend
CONCRETE STRUCTURES
REFUSE AREA
Erosion Barrier
DEBRIS PIT
CONSTRUCTION LIMITS
SECTIONS
MINE SHAFTS
AGGREGATE SURFACE
COURSE- TYPE B
30 TONS (ENTRANCE REPAIR)
K
JG
oe tz
/2
POSSIBLE AIR SHAFT LOCATION
15 CU YD OF EXPLORATORY DIG
(SPECIAL EXCAVATION)
MAIN SHAFT AND AIR SHAFT
MINE MARKER LOCATION
(EXACT LOCATION TO BE
DETERMINED BY ENGINEER)
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
326'
310'
207'
175'
143'
111'
79'
47'
50'
50'
50'
50'
50'
50'
300'
15'
488489
S ta te o f I lli no is
D ep ar tm en t o f N at ur al
R es ou rc es O ffi ce o f M in es a nd
M in er al s A ba nd on ed
M in ed L an ds
R ec la m at io n D iv is io n
S he et
D ra w n
B y:
C h ec ke d B y:
D at e:
M in e
R ef us e
A re a of
B S w is he r
/2
O
K M in e
P A
D
IL
-1
R ec la m at io n
S t.
C la ir C ou nt y A
M L-
B S cE -2
OK Mine
Mine Refuse Treatment Section # CU YD LIME (TON)
1 1061 8.8 2 883.5 7.2 3 705.5 6 4 528 4.4 5 350 2.8 6 172 1.6
Total 3700 30.8
DEBRIS BURIAL PIT
20' x 14'
16' DEEP
ACRE
.22
.18
.15
.11
.07
.03
.76
0 50 100
MAIN SHAFT
AIR SHAFT
K
JG
oe tz
SPECIAL
EXCAVATION
VOLUME 373 CU YD
SOIL FILL
VOLUME 247 CU YD
CONCRETE PLUG
VOLUME 126 CU YD
8'
12'
20'
38'
DIAMETER
26.8'
DIAMETER
EXISTING GRADE
LIMITS OF SPECIAL
EXCAVATION
EXISTING
SHAFT 10'
DIAMETER
MAIN SHAFTA
SOIL CROWN
VOLUME 44 CU YD
1'
1'
SPECIAL
EXCAVATION
VOLUME 150 CU YD
SOIL FILL
VOLUME 139 CU YD
CONCRETE PLUG
VOLUME 12 CU YD
EXISTING GRADE
LIMITS OF SPECIAL
EXCAVATION
14'
6'
20'
25'
DIAMETER
EXISTING
SHAFT
AIR SHAFTA
SOIL CROWN
VOLUME 20 CU YD
1'
1'
5'
DIAMETER
11'
DIAMETER
10'
20'
20'
16'
EXISTING GRADE
TOP VIEW
SIDE VIEW
3 FOOT MINIMUM
DIRT COVER
DISPOSAL AREA
EARTH
EXCAVATION
VOLUME 119
CU YD
SOIL FILL
VOLUME 22
CU YD
DISPOSAL
PIT
VOLUME 97
CU YD
LIMITS OF
SPECIAL
EXCAVATION
DISPOSAL PITA
SOIL CROWN
VOLUME 13
CU YD
1'
1'
S ta te o f I lli no is
D ep ar tm en t o f N at ur al
R es ou rc es O ffi ce o f M in es a nd
M in er al s A ba nd on ed
M in ed L an ds
R ec la m at io n D iv is io n
S he et
D ra w n
B y:
C he ck e d B y:
D at e:
S ha ft
D et ai ls
D eb ris
P it
D et ai ls of
/2
O K
M in e P
A D
IL
-1
R ec la m at io n S t.
C la ir
C ou nt y
A M
L- B
S cE
-2
K
JG
oe tz
MINE OPENING MARKER DETAILB
3' (MIN)
3' - 4'
REFUSE
SOIL
SOIL
REFUSE
REFUSE TYPICAL SECTION
EXISTING PROPOSED
REFUSE TYPICAL SECTIONB
3' (VARIES)
3' - 4'
MINE REFUSE TREATMENT
LIMESTONE
CONSTRUCTION SIGN DETAIL
Natalie Phelps Finnie, Director
Funding provided by the US Department of the Interior, Office of Surface Mining, with funding from the Bipartisan Infrastructure Law Abandoned Mined Land Grant Program
ABANDONED MINED LANDS
RECLAMATION PROJECT
STATE OF ILLINOIS
J.B. PRITZKER, GOVERNOR
Department of Natural Resources
B
S ta te o f I lli no is
D ep ar tm en t o f N at ur al
R es ou rc es O ffi ce o f M in es a nd
M in er al s A ba nd on ed
M in ed L an ds
R ec la m at io n D iv is io n
S he et
D ra w n
B y:
C he ck e d B y:
D at e:
R ef us e T yp ic al S ec tio n D et ai ls M in e
M ar ke r/
S ig n D et ai ls of
B S w is he r
/2
O
K M in e
P A
D
IL
-1
R ec la m at io n
S t.
C la ir C ou nt y A
M L-
B S cE -2
K
JG
oe tz fabric.
Silt fence metal stake.
Wood post or metal stake.
Wood post or fabric.
Silt fence fence with fabric positioned as shown.
adjacent to end-post (stake) of second silt
Place end-post (stake) of first silt fence and drive both posts (stakes) 18 (450) into ground.
Rotate posts (stakes) together 180° clockwise
(Not applicable for J-hooks)
J-hook
S he et fl ow J-hook
S he et fl ow
(60 m)
200'
(typical).
metal stake
Wood post or fabric.
Continuous fence top with wire.
adjacently and bind at
Place posts (stakes) bank.
Top of pin.
Securing fabric.
Filter pin.
Securing
6 min.
12 (300) m a x of the aggregate shall be 1:4 (V:H).
traffic, the traffic approach slope clear zone and the road is open to
When the ditch check is within the* aggregate.
Coarse ditch.
Bottom of pin.
Securing
Flow fabric.
Filter
2*
1 1
Riprap
2* fabric.
Filter pin.
Securing
(300)
(300)
(300)
(300)
(300)
(1.5 m)
5'
Wood or metal stake
Fence fabric
Sheet flow
.2 m unless otherwise shown.
All dimensions are in inches (millimeters) protection.
shall also apply for inlet and pipe shown for perimeter erosion barriers
The installation details and dimensions
Wood or metal stake
Fence fabric
Sheet flow
.2 m
(150) trench to secure fabric.
Excavate, backfill and compact
STEP 1
STEP 2
ATTACHING TWO SILT FILTER FENCES
SILT FILTER J-HOOK PLACEMENT
J-HOOK
ELEVATION
SECTION B-B
AGGREGATE DITCH CHECK
ELEVATION
SECTION A-A
GENERAL NOTES
PERIMETER EROSION BARRIER
SILT FILTER FENCE AS A
TRENCH METHOD
SLICE METHOD
B
B
A
A
Illinois Department of Transportation
APPROVED 2013
APPROVED 2013
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D
-1 -9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES 1-1-12
(Sheet 1 of 2)
STANDARD 280001-07
CONTROL SYSTEMS
TEMPORARY EROSION
DATE REVISIONS
on SEDIMENT BASIN ELEVATION
)�Corrected notation for flowline (1-1-13
SECTION A-A
Added SLICE METHOD to
Omitted hay/straw perimeter barrier.
Flow or rolled excelsior
Straw or hay bales
Flow
Flow
Spacers fence
Silt filter
30' (9.0 m)
20' (6.0 m) to
6' (1.8 m)
24 (600) to m in will improve if put into a series.
The performance of the basin directed by Engineer.
Outlet type as
Flow removed anytime the basins become 75% filled.
direction of the flow. Accumulated silt shall be
The long dimension should be parallel with the
.4 m
Flow
Tie down stakes
Flow
Bale ties hay bales
Straw or
Flow
Flow fence
Silt filter open grate
Manhole with
Flow
Spacers
Flow to excavation
Ground line prior ditch
Downside limits
Final excav.
Upside ditch slope or finished
Temporary
Final embankment limits toe ditch
Temporary toe ditch
Temporary ditch
Final Ditch�
INLET AND PIPE PROTECTION
ELEVATION
SEDIMENT BASIN
PLAN
TYPICAL CUT CROSS-SECTION TYPICAL FILL CROSS-SECTION
CUT & FILL SECTIONS
TEMPORARY DITCHES FOR
Illinois Department of Transportation
APPROVED 2013
APPROVED 2013
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 2 of 2)
STANDARD 280001-07
CONTROL SYSTMES
TEMPORARY EROSION
| 1 OK Mine Site Cnditions.pdf |
| 1 OK Mine Refuse.pdf |
| 1 OK Mine Summary.pdf |
| 1 Erosion Control.pdf |
| 227-280001-07_TempErosionCntrlSys |
| 227-280001-07_TempErosionCntrlSys-Page 2 [Sheet] |
| 1 Ok Mine Marker.pdf |
| 1 OK Mine Shafts.pdf |
| 1 OK Mine Title.pdf |
File details come from the government source that posted it. Updated .