03_P2699007_Sample_Standard_Agreement.pdf
PDF 7 MB Posted
- Attached to
- P2699007-Manner Property Demolition
- Solicitation number
- 0000039974
- Issued by
- Shasta County, Shasta CDP, Shasta Lake City, Mount Shasta City, California
About this file
Summary of California Department of Fish and Wildlife Demolition Contract
This is a Standard Agreement (STD 213) between the California Department of Fish and Wildlife (CDFW) and a contractor for demolition services at the Mouth of Cottonwood Creek Wildlife Area, Manner Property, located at 22231 Adobe Road, Cottonwood, California 96002 in Shasta County. The project requires complete demolition of six structures (State Owned Housing with screened porch, carport, large shed in two sections, small shed, well and pump shed, and collapsed metal shed), removal of nine marked trees, abatement and removal of all hazardous materials including friable and non-friable asbestos and lead-based paint, destruction of one septic tank per Shasta County requirements, removal of interior fencing and debris, and implementation of a Stormwater Pollution Prevention Plan (SWPPP). The contract term begins upon Department of General Services (DGS) approval and extends through December 30, 2027. Construction must be completed within forty-five working days following the official Notice to Proceed, with no work permitted between March 1 and August 31 due to bird nesting and other sensitive environmental requirements. The contractor must be a California-licensed General Engineering or General Building Contractor with an Asbestos Abatement Contractor License (C22) and lead abatement certification; if not possessed by the prime contractor, these specialties must be subcontracted.
The contract specifies a maximum agreement amount in written dollars and cents (amount redacted as TBD), with pricing to include all labor, equipment, tools, materials, permits, bonds, insurance, mobilization, and disposal costs. The contractor must obtain all required permits including Shasta County septic destruction permits, air quality permits, SWPPP, site safety plans, and comply with asbestos and lead abatement notification requirements to the EPA and California Air Resources Board at least ten working days prior to demolition. Required insurance includes Commercial General Liability, Automobile Liability, Worker's Compensation, and Pollution Liability with Hazardous Waste Transporter endorsements. A Pre-Demolition Asbestos and Lead Survey Report (dated June 14, 2024) identified five confirmed asbestos-containing materials and nineteen lead-containing painted surfaces requiring professional removal and disposal at approved facilities. Final retention payment is contingent upon completion of the Prime Contractor's Disabled Veteran Business Enterprise (DVBE) Subcontracting Report (Form 817), with CDFW withholding ten thousand dollars until certification compliance is met.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 02_P2699007_Bidding_Documents.pdf | ||
| 04_P2699007_Drawing_Set.pdf | ||
| 01_P2699007_Bidding_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA - DEPARTMENT OF GENERAL SERVICES
STANDARD AGREEMENT
STD 213 (Rev. 04/2020)
AGREEMENT NUMBER
P2699007 PURCHASING AUTHORITY NUMBER (If Applicable)
SCO ID: 3600-P2699007
1. This Agreement is entered into between the Contracting Agency and the Contractor named below:
CONTRACTING AGENCY NAME
California Department of Fish and Wildlife
CONTRACTOR NAME
TBD
2. The term of this Agreement is:
START DATE
Upon DGS Approval
THROUGH END DATE
December 30, 2027
3. The maximum amount of this Agreement is:
Written Dollars and Cents ($XX,XXX.XX)
4. The parties agree to comply with the terms and conditions of the following exhibits, which are by this reference made a part of the Agreement.
Exhibits Title Pages
Exhibit A Scope of Work 2
Exhibit A1 Scope of Work Continued 16
Attachment 1 Demolition Level Asbestos and Lead Survey Report 15
Attachment 2 Limited Asbestos in Surface Soils Survey 14
Attachment 3 Lead Related Construction Soils Sampling 28
Exhibit B Budget Detail and Payment Provisions 4
Exhibit C * General Terms and Conditions *
Exhibit G Additional Provisions (Public Works) 20
STD 18 Standard California Nondiscrimination Construction Contract Specifications 2
Drawing Dated: 06/01/2026Drawing No.: W31-2026-001 2 Sheet(s) Items shownwith anasterisk (*), are hereby incorporated by reference andmadepart of this agreement as if attachedhereto.
These documents can be viewed at https://www.dgs.ca.gov/OLS/Resources
INWITNESSWHEREOF, THIS AGREEMENTHAS BEENEXECUTEDBY THE PARTIES HERETO.
CONTRACTOR
CONTRACTOR NAME (if other than an individual, state whether a corporation, partnership, etc.)
TBD
CONTRACTOR BUSINESS ADDRESS CITY STATE ZIP
PRINTED NAME OF PERSON SIGNING TITLE
CONTRACTOR AUTHORIZED SIGNATURE DATE SIGNED
SAM
PLE
STATE OF CALIFORNIA - DEPARTMENT OF GENERAL SERVICES
STANDARD AGREEMENT
STD 213 (Rev. 04/2020)
AGREEMENT NUMBER
P2699007 PURCHASING AUTHORITY NUMBER (If Applicable)
SCO ID: 3600-P2699007
STATE OF CALIFORNIA
CONTRACTING AGENCY NAME
California Department of Fish and Wildlife
CONTRACTING AGENCY ADDRESS
1010 Riverside Parkway
CITY
West Sacramento
STATE
CA
ZIP
95605
PRINTED NAME OF PERSON SIGNING
Yujie Jin
TITLE
Branch Chief, Land and Facilities Engineering Branch
CONTRACTING AGENCY AUTHORIZED SIGNATURE DATE SIGNED
CALIFORNIA DEPARTMENT OF GENERAL SERVICES APPROVAL EXEMPTION (If Applicable)
SAM
PLE
MOUTH OF COTTONWOOD CREEK WILDLIFE AREA P2699007
MANNER PROPERTY DEMOLITION
CONTRACTOR
EXHIBIT A – SCOPE OF WORK
01/27/2026 A1 of A2 LFEB - PW
1. Description:
Contractor shall furnish all labor, equipment, tools, parts, materials, supplies, permits, and incidentals necessary to provide demolition services, abate and remove all hazardous materials, and provide environmental plans, and removal of fencing, debris, and trees as required.
2. Location of Services:
The location of services shall be performed at Mouth of Cottonwood Creek Wildlife Area, Manner Property, 22231 Adobe Road, Cottonwood, CA, 96002, Shasta County.
3. Contract Term Date:
Upon DGS approval until December 30, 2027
4. Time of Completion:
Construction shall be completed within FORTY-FIVE (45) WORKING DAYS following the official “Notice of Start Date” from the State to the Contractor to commence construction.
Additional contract time will be allowed for delay caused by shortage of materials, provided the Contractor advises Engineer IN WRITING within fifteen (15) days from the beginning of such delay and provided the Contractor has made diligent effort to get supplies from known sources.
No work shall occur between the period of March 1 to August 31 due to bird nesting and other sensitive requirements.
5. License Required:
A – General Engineering Contractor, OR B – General Building Contractor
With the following Requirements:
C22 - Asbestos Abatement Contractor License:
If the Bidding Contractor does not possess the required license, then the Bidding Contractor shall subcontract with a contractor having the said license.
Lead Abatement:
Lead-Related Certificate (LRC) from the Department of Public Health, Childhood Poisoning Prevention Branch. If the Bidding Contractor does not possess the required certificate, then the Bidding Contractor shall subcontract with a contractor with said Certification.
The subcontractor may not sublet the work to another contractor. The subcontractor must be listed on the list of Proposed Subcontractors, Attachment 4, page 6, and Attachment 13 GSPD-05-106, page 20, regardless of the amount of work.
All employees working on asbestos and/or lead abatement MUST have a current, valid Certificate.
EXHIBIT A – SCOPE OF WORK
01/27/2026 A2 of A2 LFEB - PW
6. Items of Work:
All items of work on the contract form are to be complete in place. In addition, the specified items shall be in accordance with the following and shall include as well as furnish all labor, tools, equipment, materials, permits and taxes necessary to:
Item 1 - Mobilization, bonds, insurance, permits, SWPPP plan, safety plan and all other miscellaneous requirements
Item 2 - State Owned Housing (SOH) Demolition Item 3 - Carport Structure Demolition Item 4 - Large Shed Demolition (2 Sections) Item 5 - Small Shed Demolition Item 6 - Well & Pump Shed Demolition Item 7 - Collapsed Metal Shed Demolition Item 8 - Destruction of One (1) Septic Tank Per Shasta County Requirements Item 9 - Removal of all fencing, debris, and all miscellaneous items within the Limits of
Demolition Item 10- Remove Nine (9) Marked Trees Item 11- Contingencies are for changes due to unforeseen items of work, and/or adjustments in the quantities of items bid on a unit price basis, as may be determined, and allowed by the Contract Manager. The total amount to be paid under this item may be from zero (if no changes are allowed) to the full amount, as determined by the Contract Manager.
7. The Project Officials during the term of this agreement will be:
CDFW Project Officials Contractor Project Official(s) Contract Manager Project Director Name: Robert Benson, Sr. CE (RA) Name: TBD Phone: 916-996-7593 Phone: TBD Email: Rob.Benson@wildlife.ca.gov Email: TBD Address: 1010 Riverside Parkway
West Sacramento, CA 95605 Address: TBD
Facility Manager Name: Richard Shinn Jr.
Phone: (530) 598-9862 Email: Richard.Shinn@wildlife.ca.gov Address: Ash Creek Wildlife Area
P.O. Box 37 Bieber, CA 96009
EXHIBIT A1 – SCOPE OF WORK CONTINUED
A. General The Contractor shall visit and determine the actual condition of the site prior to submitting the bid and shall familiarize themselves of the work in place. Contractor shall investigate conditions character, quality and quantity of surface, and sub-surface materials of obstacles to be encountered. Failure by the Contractor to acquaint himself/herself with site conditions and available information will not relieve him/her from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The submission of a bid will be considered as conclusive evidence that the Contractor has made such examination. No claim of the Contractor shall be made as a result of different physical conditions of any item or exposed work if such condition is exposed and present at the time of inspection. If any unknown physical condition exists or is not exposed at the time of site inspection, unless noted in these specifications, an equitable adjustment will be made.
All work is to be performed in accordance with the Standard Specifications as stated below, except as provided in the General Conditions, Technical Specifications, and any applicable drawings. The provisions of Section 12-1.04, DOT Standard Specifications, regarding flagging costs shall not apply. The contractor shall be solely responsible for all flagging costs.
All materials and workmanship shall comply with the following:
State and Federal Codes:
1. 2025 California Code of Regulations (CCR)
2. 2025 California Administrative Code (CAC), (CCR, Title 24, Part 1)
3. 2025 California Building Code (CBC), Volumes 1, and 2, (CCR, Title 24, Part 2)
(Based on 2024 International Building Code with 2025 California Amendments)
4. 2025 California Electrical Code (CEC), (CCR, Title 24, Part 3) (2023 National Electric
Code (NEC) with 2025 California Amendments)
5. 2025 California Energy Code, (CCR, Title 24, Part 6)
6. 2025 California Fire Code (CFC), (CCR, Title 24, Part 9) (Based on 2024
International Fire Code with 2025 California Amendments)
7. 2025 CFC Section 3303.1.1. - Site Safety Plans
8. 2025 California Existing Building Code, (CCR, Title 24, Part 10) (Based on the 2024
International Existing Building Code)
9. 2025 California Green Building Standards Code, (CCR, Title 24, Part 11)
10. 2025 California Referenced Standards Code, (CCR, Title 24, Part 12);
11. Reference Code Sections for Applicable Standards; 2025 CBC, Chapter 35 or 2025 CFC, Chapter 80
12. Title 8 California Code of Regulations (CCR), CAL/OSHA Regulations-Safety Orders issued by Division of Industrial Safety of the State of California
13. Title 19 C.C.R., Public Safety, SFM Regulations, List of Federal Codes & Standards
(if applicable)
14. DOT Standard Specifications and/or Plans; State of California, DOT, 2025
Additional Documents which are attached hereto and made a part of this agreement;
1. Drawing No.: W31-2026-001 Dated: 06/01/2026 Sheets: Two (2)
2. Attachment 1 - Demolition Level Asbestos and Lead Survey Report
3. Attachment 2 - Limited Asbestos in Surface Soils Survey
4. Attachment 3 - Lead Related Construction Soils Sampling
B. Insurance Requirements:
Contractor will be required to supply proof of, and maintain, liability coverage as outlined in Exhibit G, Insurance, Item 12B – Insurance Requirements which is attached hereto and will be part of the resulting agreement. These policy types include:
Commercial General Liability Automobile Liability Worker’s Compensation and Employer’s Liability Pollution Liability with Hazardous Waste Transporter MCS-90 Endorsement
Contractor will be required to prove current and valid Hazardous Waste Transporter Registration issued by the California Department of Toxic Substances Control (DTSC).
❖ The above policies must each be endorsed to include “The State of California, its officers, agents and employees as additional insured but only with respect to work performed under the Contract”.
C. Bond Requirements Contractor will be required to supply bonds as outlined in Exhibit G, Item 13 – Contract Bonds which is attached hereto and will be part of the resulting agreement. The bonds required shall be:
Performance Bond Payment Bond
D. License/Permit/Notification Requirements
1. License Requirements;
a. The Contractor shall possess and maintain throughout the duration of this Agreement current licenses, certifications, and necessary permits as required by applicable Federal, State, and/or County jurisdictions for the removal, transporting, disposal or other regulated activity related to the work of this Agreement.
b. The Contractor shall meet the requirements of Title 17, California Department of Public Health for all lead abatement activities.
2. Permit/Plan Requirements;
a. Contractor shall be responsible for obtaining and submitting the following permits and plans to the Contract Manager prior to mobilization;
Shasta County Septic Permit for Destruction of One (1) Septic Tank Shasta County Air Quality Management District (AQMD) Permit Building Permits (Demolition) - Not Required Grading Permit - Not Required Stormwater Pollution Prevention Plan (SWWPP) Site Safety Plan per 2025 California Fire Code Section 3303.1.1
b. Site Safety Plan shall be approved by the local State Fire Marshal before mobilization.
c. CDFW shall be responsible for the following:
California Environmental Quality Act (CEQA) Permit
3. Notification Requirements
Pursuant to EPA and State laws, applicants must complete a Hazardous Air Pollutants declaration. Because Shasta County is a non-delegated district, you must submit an Asbestos Demolition and Renovation Form directly to the U.S. EPA and California Air Resources Board (CARB) ten (10) working days prior to commencement of demolition activities.
E. Quality Control The Contractor shall be responsible for the completeness of his/her work. He/she shall be responsible for the progress of his/her work until final completion and acceptance of same by the State and shall make such checks on the work as may be necessary to assure conformance with these specifications.
F. Work Schedule The Contractor shall furnish the Engineer with a proposed work schedule SEVEN (7) DAYS PRIOR TO BEGINNING WORK and The Contractor shall submit at such times as may be requested by the Engineer, schedules which shall show the order in which the Contractor proposes to carry on the work with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts.
No work shall occur between 1 March and 31 August due to bird nesting and other sensitive requirements.
G. Submittal Process The Contractor shall submit a detailed outline of procedures and equipment for meeting the requirements of Federal, State and County Restrictions and Requirements.
H. Clean Up and Disposal of Refuse Upon completion of the work under this contract, the Contractor shall remove all remaining excess materials, waste, rubbish, debris, temporary facilities and other equipment from the site.
Final approval of the work done under these specifications will not be given until the final cleanup shall have met with the approval of the Engineer.
All material that results from clearing, grubbing, stripping, demolition/removal, excavation, and is not to be incorporated in the work shall become the property of the Contractor and shall be removed from the site and lawfully disposed of by the Contractor at his/her expense.
Surplus materials, resulting from excavations that are not required for backfill construction are the property of the Contractor.
I. Restoration of Improvements Any damage to existing facilities, structures or improvements caused by the Contractor, his/her equipment or workmen, during the term of this contract, shall be repaired and the damaged item(s) restored to as good a condition as existed at the time work commenced at the Contractor’s own expense.
J. DVBE Verification & Certification Final retention will not be released until the Prime Contactor’s DVBE Subcontracting Report (Form 817) has been completed and returned to the State Engineer.
At the end of the contract, the Contractor will be required to complete the Prime Contractor’s DVBE Subcontracting Report (Form 817) to certify that he/she has met all of their DVBE Obligations as identified in their Bid.
1. Use of Subcontractor(s)
The Contractor shall be responsible for all work performed. All persons engaged in the work will be considered employees of the Contractor. When any subcontractor fails to execute a portion of the work in a manner satisfactory to the State, the Contractor shall immediately remove such subcontractor upon written request of the State, and the subcontractor shall not be employed for any portion of the contract. The State will not entertain requests to arbitrate disputes among subcontracts concerning responsibility for performing any part of the work.
2. Prime Contractor DVBE Subcontracting Form (Form 817) If the Contractor enters into a subcontract with a Disabled Veteran Business Enterprise (DVBE), the CDFW and the Contractor are required to follow Military and Veterans Code Section 999.5, 999.55 and 999.7. Upon request by CDFW, the Contractor shall provide proof of payment for the DVBE work.
Pursuant to the Military and Veterans Code (M&VC) Section 999.5, if the Contractor has entered into a subcontract with a DVBE, then the Contractor must certify to CDFW through the Contractor DVBE Subcontracting Form (Form STD 817), before releasing final retention payment, all of the following:
a. The total bid amount and the total final contract amount including contingencies the Contractor received under the contract.
b. The name and address of the disabled veteran business enterprise that participated in the performance of the contract and the contract number.
c. The amount and percentage of work the Contractor committed to provide to one or more disabled veteran business enterprises under the requirements of the contract and the amount each disabled veteran business enterprise received from the prime contractor.
d. That all payments under the contract have been made to the disabled veteran business enterprise. Upon request by the CDFW, the Contractor shall provide proof of payment for the work. A person or entity that knowingly provides false information shall be subject to a civil penalty for each violation in the minimum amount of two thousand five hundred dollars ($2,500) and the maximum amount of twenty-five thousand dollars ($25,000). An action for a civil penalty under this subdivision may be brought by any public prosecutor in the name of the people of the State of California and the penalty imposed shall be enforceable as a civil judgment.
3. Pursuant to the M&VC Section 999.7, the CDFW will withhold ten thousand dollars ($10,000) from the final payment, or the full final retention payment if less than ten thousand dollars ($10,000), until the Contractor complies with the certification requirements of Military and Veterans Code Section 999.5.
Contractors that fail to comply with the certification requirements shall be given notice and allowed to cure the defect. If after 15 calendar days but not more than 30 calendar days from the date of the notice, the Contractor fails to comply with the certification requirements, the CDFW shall permanently deduct ten thousand dollars ($10,000) from the final payment, or the full final retention payment if less than ten thousand dollars ($10,000).
The withholding applies to all procurement approaches with a DVBE subcontractor, as defined by M&VC Section 999(b)(4). Notwithstanding any other law, the CDFW shall not withhold more than the amount specified or the full final retention payment of any disabled veteran business enterprise contract for the purposes of ensuring compliance with the certification requirements of M&VC 999.5.
K. Qualifications The Contractor shall provide the CDFW Engineer with proof of the required training for each person providing services as part of the submittals under this Agreement.
The Contractor’s employees who are engaged in lead removal work shall be CDPH certified and shall show evidence of current (within twelve (12) months) training. Contractor’s project foreman shall be a certified CDPH Lead Supervisor. The foreman has authority to monitor and implement required changes in work practice procedures. Contractor’s lead workers shall be certified CDPH Lead Workers.
L. Special Requirements Compliance with Regulatory Requirements: All applicable Federal, State, and County regulatory agency requirements shall be complied with during the course of the work. The Contractor’s attention is directed to the following list of agency requirements that generally apply to removal work; the Contractor is responsible for identifying and complying with any other agencies or requirements not listed:
1. California Code of Regulations – Title 8; Section 1529, 5144.
2. CAL/OSHA – Personal protection during all phases of work, including exposure to airborne solvents, lead paint, dust, and mists.
M. Utility Requirements
1. Contractor shall notify 811 "Call Before You Dig" prior to mobilization and breaking ground.
2. Existing PG&E service to the Manner Property has been disconnected at power pole located at edge of Adobe Road and conductors to property removed.
a. Prior to mobilization, the contractor shall notify PG&E to remove the existing meter and the intent to start demolition of structures.
N. Scope of Work
1. List of Structures to be demolished:
STRUCTURE QUANTITY UNIT
State Owned Housing w/ Screened Porch
1,287
SF
Carport 715 SF
Large Shed (2 Sections) 700 SF
Small Shed 784 SF
Well and Pump Shed 30 SF
Collapsed Metal Shed 100 SF
2. The contractor agrees to provide to the California Department of Fish and Wildlife (CDFW) demolition and clearance services, hazardous material abatement services, Water Pollution Control Program (SWWPP) services, and implementation of said Program as described herein.
a. Contractor shall provide all labor, tools, parts, equipment, supplies, supplies, materials, permits, travel, and incidentals necessary to demolish and remove six (6)) structures and features.
b. Abate all hazardous materials including but not limited to friable and non-friable asbestos and lead paint, according to all environmental laws and regulations, and provide any necessary SWWPP and implementation of said Program.
c. The work shall be done in accordance with all required Federal, State, and County codes/regulations.
d. Prior to demolition activity, Contractor shall be responsible for removing any hazardous waste, including, but not limited to, all friable and non-friable asbestos, lead-containing paint, mercury-containing thermostats, and fluorescent light fixtures, according to all environmental laws, regulations, and Hazardous Materials Survey Report (Attachment 1).
e. The Contractor shall remove and abandon one (1) septic tank in compliance with Shasta County governmental regulations and requirements. Septic tank removal shall be subject to inspection and approval by CDFW Contract Manager and Shasta County. The contractor shall notify the County and CDFW Contract Manager a minimum of twenty-four
(24) hours prior to septic tank pumping and destruction.
1) It is unknown where the septic tank is located. Contractor shall be responsible for locating sewer line at SOH and determining location of Septic Tank.
f. The contractor shall be responsible for developing and providing a Stormwater Pollution Prevention Plan (SWWPP). All costs associated with implementing the plan shall be included in the bid.
g. The contractor shall grade the site to a finished grade in accordance with the approved SWWPP, or as directed by CDFW Contract Manager.
O. Detailed Description of Work
1. All demolition and miscellaneous clean-up work shall be within the Limits of Demolition as shown on Sheet 1 of the Drawing Set.
2. Contractor shall comply with Division 26 of the California Health and Safety Code and to the rules and regulations of the Air Pollution Control District having jurisdiction.
3. Sale of Materials: All materials resulting from the demolition of improvements shall become the property of Contractor and Contractor shall remove said materials from the premises with its own organization. Contractor shall not dispose of the improvements or materials therefrom by sale, gift, or in any manner whatsoever to the general public; provided, however, that this provision shall not be construed as limiting or prohibiting the sale or disposal of such improvements or materials at the site to properly licensed contractors or material men, provided that the materials are removed by Contractor.
4. Removal of buildings as a unit, or in sections capable of reassembly as a structure, is expressly prohibited. In no case shall Contractor engage in any solicitation of business which might subject CDFW to any liability, i.e., selling salvage to the public.
5. Demolition: The contractor shall completely remove six (6) building structures including perimeter concrete footings, concrete pads, awnings, porches, patios, and planters with respect to each structure as follows;
a. State Owned Housing (SOH) w/ Screened Porch
b. Car Port
c. Large Shed (2 sections)
d. Small Shed
e. Well and Pump Shed
1) Remove all exposed piping and electrical.
2) Cap pipe and conduit 12 inches below grade.
3) Remove well pump from top of well casing and any related piping in well casing. Well is assumed to be 100 feet deep based on average well depth for area.
4) Watertight Cap: The well casing shall be sealed with a watertight threaded or welded cap.
f. Collapsed Metal Shed
g. All miscellaneous Interior fencing within the Limits Of Demolition identified on Sheet 1 of the Drawing Set. Do not remove perimeter boundary fencing.
h. Demolition depressions from removal of concrete slabs and footings shall be filled in with native material and graded to blend in with surrounding areas.
6. Septic Tank and System Destruction:
a. Location of septic tank is unknown. Contractor shall be required to locate septic tank .
b. Septic Tank Destruction Permit must be obtained from the Shasta County office and follow all Shasta County requirements.
c. At no time shall sewage be discharged to the ground surface.
d. The septic tank must be pumped by an authorized County permitted septic tank pumping company.
e. A receipt for the load must be available during the inspection of the tank destruction.
f. All piping shall be disconnected from the tank and removed or appropriately capped.
g. Tanks shall be destroyed in place; the top, sides, and bottom of the tank shall be broken in, and hydrated lime or chlorine must be spread throughout the tank and the area surrounding the tank.
h. At no time shall the excavation be left unattended unless a suitable and adequate barrier is provided to ensure safety.
i. The tank must be completely filled with earth, sand, gravel, concrete, or other approved material. The fill material shall be placed so as to prevent settling.
j. After or during placement of the hydrated lime or chlorine and prior to backfill, tank shall be inspected by the County or as required.
k. Contractor shall plug and cap sewer lines and cleanouts minimum twelve inches (12”) below ground.
7. Miscellaneous Debris Removal:
a. The contractor shall remove and properly dispose of all miscellaneous rubble, brick, plaster, lumber, wood splinters, steel pipe, and other debris from within the Limits Of Demolition identified on Sheet 1 of the Drawing Set.
b. Debris shall not be disposed of on State property. The contractor shall make arrangements for disposal outside the State property.
c. Materials to be disposed of shall not be burned either inside or outside of the State property.
9. Dust Control: Contractor shall provide dust control during demolition loading. No separate payment will be made for any work performed or material used to control dust resulting from Contractor’s performance of the work. Payment for dust control shall be included in the bid proposal. No additional costs will be allowed.
10. Water and Sanitary Conditions:
a. Water is not available on site. The Contractor shall provide water tanks, water trucks, etc. as required to control dust and other required operations.
b. Restrooms are not available at site. Contractor shall provide portable restrooms at the site for employees.
11. Plants, Shrubs, and Trees:
a. Contractor shall only remove plants, shrubs, and trees that are in direct conflict with the demolition of structures. Notify the CDFW Manager prior to removing. See 26. Tree Activity for additional trees to be removed.
b. Uprooted small trees and shrubs removal as a result of demolition shall be chipped/scattered on site at location determined by Facility Manager.
c. Large tree (> 8” diameter) removal as a result of demolition shall include removing the major stump/root ball and backfilling and leveling the resulting excavation. The Contactor shall have the option of stump grinding and scattering debris.
d. Large tree shall be cut into rounds and stacked at location determined by Facility Manager.
12. Sediment and Pollution Control Requirements
a. SWPPP requirements
b. The contractor shall follow best management practices (BMPs) as approved by the State.
BMPs include but are not limited to the following:
Erosion and sediment control BMPs Preservation of natural features, vegetation and soil.
Perimeter sediment control (perimeter silt fence, fiber rolls) Sediment trap or sediment basin to retain sediment on site Stabilized construction exits (walking pathway only) Material handling and waste management Control of vehicle/equipment fueling to contractor’s staging area.
Spill prevention and control
c. The contractor shall employ the site-specific BMPs in the plan as needed and as conditions arise.
d. The contractor shall conduct site inspections before, during extended storm events, and after each storm event to identify areas that may contribute to erosion and sediment problems or any other pollutant discharges. Additional control measures need to be implemented immediately.
14. Hazardous Materials Survey Report
a. The hazardous results listed in Attachment 1 by the testing company are for information only. Contractor shall be responsible for determining actual quantities for bidding purposes.
b. The attached Hazardous Materials Survey Report (Attachment 1) contains comprehensive reports and diagrams of the Asbestos Containing Material (ACM) and lead-based paint. The removal of asbestos will comply with the requirements of these provisions pertaining to encapsulation, removal, and disposal of asbestos.
c. Asbestos-related work shall be performed by a properly licensed Asbestos Abatement Contractor or subcontractor, certified by Contractors State License Board and registered with the Department of Industrial Relations (DIR), Cal/OSHA.
Contractor or subcontractor must also be certified and registered pursuant to the Business and Professions Code Section 7058 and Section 6501.5 of the Labor Code.
d. Contractor performing any asbestos abatement work shall be responsible for maintaining, monitoring, securing, and posting the site in accordance with all laws, regulations, and permits required for asbestos abatement work.
e. Lead abatement work shall be performed by a person certified by CDPH as a lead supervisor or a lead worker under the direction of a lead supervisor pursuant to Title 17 of the California Code of Regulations, Sections 35001 et seq. If lead abatement is required, Contractor or subcontractor shall provide proof of such certification at the time the lead abatement plan is submitted to CDFW Contract Manager. Proof that the lead abatement plan has been prepared by a person who is properly certified by CDPH shall also be provided to CDFW Contract Manager at the same time.
f. Contractor performing any lead abatement work shall be responsible for maintaining, monitoring, securing, and posting the site in accordance with all laws, regulations, and permits required for lead- based paint abatement work.
g. All work shall conform to all Federal, State, and County laws governing the identification, preparation, worker requirements, equipment, safety, monitoring, signing, fencing, removing, and hauling of friable and non-friable asbestos. The contractor shall supply copies of information on all applicable licenses, permits, and notifications required by applicable laws and regulations.
h. Applicable regulations include, but are not limited to, the following:
1) California Health and Safety Code, Division 20, Chapter 6.5 Hazardous Waste Control, Chapter 6.8 Hazardous Substance Account.
2) California Code of Regulations, Title 8, General Industry Safety Order 5208, Asbestos.
3) Code of Federal Regulations, Title 29, Part 26, Occupational Safety and Health
Administration.
4) Code of Federal Regulations, Title 29, Part 1910, Hazardous Waste Operations and
Emergency Response.
5) BAAQMD Regulations.
6) Code of Federal Regulations, Title 40, Part 61, Subpart M, National Emission Standard for Asbestos.
i. Contractor performing the asbestos and/or lead-based paint abatement work shall provide
CDFW Contract Manager with copies of all documents required for the asbestos or lead-based paint abatement work and a certification at the conclusion of the asbestos and/or lead-based paint removal and disposal that all work was completed in accordance with the appropriate laws, regulations, and permits.
j. Compensation for the work of encapsulating, removing, and disposing of materials containing friable and/or non-friable asbestos on the areas which are shown on the Hazardous Material Survey Report is included in the lump sum Bid Proposal.
15. Discovery of Asbestos, Lead-Based Paint, or Other Hazardous Substances/Materials
a. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials during the demolition and removal process that have not been identified by Attachment 1, Hazardous Materials Survey Report, Contractor shall stop work immediately.
b. The contractor shall verbally notify CDFW Industrial Hygienist (See Item 25) and Facility Manager of these findings immediately and confirm verbal notification in writing within twenty-four (24) hours.
c. Once notified, CDFW Contract Manager will immediately request a site investigation and lab analysis report to determine the location(s) and percentage of asbestos material, lead-based paint, or other hazardous substances/materials that are discovered or suspected to be present.
d. Continuation of work shall not commence until Contractor has been authorized to do so in writing by CDFW Contract Manager.
e. Should it become necessary to cancel the work request, Contractor shall be compensated only for work completed to CDFW Contract Manager’s satisfaction. No payment shall be made for delay or lost profits anticipated for uncompleted work.
f. Failure to notify CDFW Contract Manager of the discovery of asbestos, lead-based paint, or other hazardous substances/materials may result in immediate cancellation of the Agreement and legal liability to Contractor for all actual damages resulting.
16. Asbestos
a. Encapsulating Asbestos: This work shall consist of sealing and taking precautions to minimize breakage or disturbance of ACM and laying new non-containing asbestos material on top of the ACM.
b. Removal and Disposal of Asbestos
1. The removal of asbestos shall be accomplished as required by law and copies of permits shall be given to CDFW Contract Manager. All waste generated must be disposed of in an approved hazardous waste site and transported by licensed hazardous waste hauler.
2. All removal and disposal shall meet all state and federal codes and requirements. The contractor shall comply with applicable portions of the California Code of Regulations.
Contractor shall pay any and all disposal site charges. Said fees are to be included in the Bid Proposal. No additional costs will be allowed.
3. This work shall consist of removing and disposing of materials containing friable and/or non-friable asbestos prior to the rehabilitation of CDFW-owned improvements.
Contractor performing any asbestos work shall obtain all necessary licenses, permits, certifications, and other documents needed for this work. Compensation for compliance with these requirements shall be included in the bid proposal. No additional costs will be allowed.
c. Friable Asbestos
1. The plans for friable asbestos must be approved by the BAAQMD prior to submittal to
CDFW Contract Manager. Plans must be submitted to CDFW Contract Manager seven (7) working days prior to the start of work.
The plan shall include identification of all Environmental Protection Agency (EPA), and Occupational Safety and Health Administration (OSHA) licenses, permits, and certifications required for asbestos abatement work, removal, handling, and transport.
2. Contractor performing the asbestos work shall retain and maintain all records required for asbestos abatement work. The contractor shall provide CDFW Contract Manager with copies of all documents required for the asbestos abatement work and a certification of Contractor performing the asbestos work at the conclusion of the asbestos removal and disposal that all work was completed in accordance with the appropriate laws, regulations, and permits.
3. The contractor shall use a California Uniform Hazardous Manifest, which will be signed by CDFW Contract Manager.
4. Contractor shall use hazardous waste haulers having current registration with the California Department of Toxic Substances Control (DTSC) and shall have a US EPA Identification Number (US EPA ID Number).
5. CDFW will supply the EPA Generator Number for Contractor for the disposal of friable asbestos.
6. All vehicles used to transport hazardous waste shall have a valid Certificate of Compliance affixed to the vehicle.
7. Friable asbestos containerized for transportation to the disposal site shall be appropriately labeled.
8. Disposal of friable asbestos shall be at a legally authorized waste disposal facility. The contractor shall pay all disposal site charges. Contractor shall pay any and all disposal site charges. Said fees are to be included in the Bid Proposal. No additional costs will be allowed.
d. Non-Friable Asbestos
1. Non-friable asbestos containing material waste is to be considered hazardous waste.
Contractor shall take precautions during removal that it remains wet, breakage is minimized, minimal visual emissions are allowed, and it is not physically altered or powdered to result in the release of free asbestos fibers.
2. An EPA Generator Number is not required for non-friable asbestos.
3. Non-friable asbestos shall be placed into appropriate containers and suitably covered.
4. Disposal of the non-friable asbestos shall be done at a legally approved disposal facility. Contractor shall pay any and all disposal site charges. Said fees are to be included in the Bid Proposal. No additional costs will be allowed.
17. Lead-Based Paint
a. Required work as stipulated in this Agreement shall comply with all rules and regulations and laws in the County and State that work is to be performed.
b. Abatement of lead-based paint shall only be done in accordance with guidelines and regulations established by National Institute for Occupational Safety and Health (NIOSH), Cal/OSHA, US EPA, National Emission Standards for Hazardous Air Pollutants (NESHAP), and Housing Urban Development (HUD) Guidelines for Evaluation and Control of lead-based paint (Hazards in Housing).
c. Any inconclusive test results from CDFW furnished Hazardous Materials Survey Report shall be handled and properly disposed of and treated as possible lead-based paint.
d. The removal of lead-based paint shall be accomplished as required by law and copies of permits shall be given to CDFW Contract Manager. All waste generated must be disposed of in an approved hazardous waste site and transported by licensed hazardous waste hauler. All removal and disposal shall meet all State and Federal codes and requirements. The contractor shall comply with applicable portions of the California Code of Regulations. Contractor shall pay any and all disposal site charges and include them in the Bid Proposal. No additional costs will be allowed.
e. This work shall consist of removing and disposing of materials containing lead-based paint prior to the rehabilitation of the State-owned improvements. Contractor performing any lead-based paint work shall obtain all necessary licenses, permits, certifications, and other documents needed for this work.
f. Contractor performing any lead-based paint work shall prepare a plan presenting the methods for encapsulating, removing, handling, transporting, and disposing of lead-based paint.
18. Final Clearance Report A final clearance report shall be conducted after all hazardous containing material has been removed, in accordance with all rules, regulations, and laws that are pertinent in the State of California.
a. The final clearance report shall include asbestos and lead-based paint survey to confirm that all the asbestos and lead-based paint containing materials have been removed.
Inspection of all areas where asbestos was encapsulated shall be made. Bulk material samples, personal samples, and air samples are to be taken in order to assess asbestos hazards at the site after removal.
b. Air samples shall be taken to determine if asbestos is present in the air. Analysis shall be performed by an American Industrial Hygiene Association accredited laboratory for asbestos analysis.
c. Additional asbestos removal work that would be performed based upon the results of the post sampling test shall be considered as part of the bid amount submitted by Contractor and no additional compensation will be allowed for that work.
19. Contractor’s Responsibilities
a. The contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards. Contractor shall take all necessary precautions to prevent injury or hazard to CDFW employee(s).
b. Contractor shall comply with all applicable Federal, State, and County laws, ordinances, rules, and regulations which in any manner affect those engaged or employed in the work to be performed.
c. In the event Contractor’s operations create a condition hazardous to the CDFW property, The contractor shall provide warning signs alerting to any dangerous conditions at Contractor's own expense and without cost to CDFW.
d. Contractor shall provide prior to demolition all permits/plans/notifications identified in Section D. License/Permit/Notification Requirements.
e. CFC Section 3303.1.1 Components of Site Safety Plans shall include the following as applicable;
1) Name and contact information of site safety director.
2) Documentation of the training of the site safety director and fire watch personnel.
3) Procedures for reporting emergencies.
4) Fire department vehicle access routes.
5) Location of fire protection equipment, including portable fire extinguishers, standpipes, fire department connections and fire hydrants.
6) Smoking and cooking policies, designated areas to be used where approved, and signage locations in accordance with Section 3305.8.
7) Location and safety considerations for temporary heating equipment.
8) Hot work permit plan.
9) Plans for control of combustible waste material.
10) Locations and methods for storage and use of flammable and combustible liquids and other hazardous materials.
11) Provisions for site security.
12) Changes that affect this plan.
13) Other site-specific information required by the fire code official.
20. Completion and Inspection
a. It is Contractor’s responsibility to notify CDFW Contract Manager to have work inspected and approved.
b. Contractor shall begin work by the date specified in the Notice to Proceed informing him that the Agreement has been approved and shall diligently prosecute the work, and the work shall be completed before the expiration date as stipulated in this Agreement.
21. Workmanship
a. Workmanship shall conform to the commercially reasonable standards of the industry and shall be in conformance with the building codes of the State, County, and City in which the work is being done; copies of any required building permits shall be submitted to CDFW Contract Manager with the Contractor’s invoice(s).
b. The contractor shall conduct its operation in such a manner as to avoid injury or damage to the property of CDFW or the adjacent property. If such objects are injured or damaged because of Contractor’s operation, they shall be restored at Contractor’s sole expense.
c. Any work judged unsatisfactory by CDFW Contract Manager shall be redone at Contractor’s sole expense.
22. Waste Disposal
Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. seq.
23. Unforeseen or Unanticipated Work If during the demolition services described herein, it is discovered that additional work is required in order to complete required work under this Agreement, such work may be completed as directed and pre-approved by CDFW Contract Manager.
24. Reports (Attachments 1, 2, and 3)
a. Demolition Level Asbestos and Lead Survey Report (Attachment 1)
1) Estimated quantity of hazardous materials identified in Attachment 1 is for information only.
2) It is the requirement of the Contractor to determine quantities for bidding. Additional compensation for quantity of materials exceeding quantities listed in Report will not be allowed.
b. Limited Asbestos in Surface Soils Survey (Attachment 2)
1) Soils surrounding the structures were tested for asbestos and found to be negative.
c. Lead Related Construction Soils Sampling (Attachment 3)
1) Soils surrounding the structures were tested for lead and found to be within the required limits.
2) No action is required for removal.
25. CDFW Responsibilities
a. CDFW will provide an Independent Industrial Hygienist to be on site to monitor the
Contractor’s hazardous activities.
26. Tree Removal Activities
a. Contractor shall remove nine (9) trees marked with ribbon
b. Marked Tree Removal
Marked Tree Location Diameter at Breast Height
(DBH)
1 Old dead snag North of house 109
2 Big Cedar North of house 102
3 White Mulberry East of house 54
4 Walnut NE corner of metal shed 50
5 White Mulberry West side of skinny shed 48
6 White Mulberry West side of skinny shed 72
7 White Mulberry SW of house 78
8 Elm West of the house 68
9 White Mulberry Near carport 60
c. Tree removal shall include removing the major stump/root ball and backfilling and leveling the resulting excavation. The Contactor shall have the option of stump grinding and scattering debris.
d. Trees shall be cut into rounds and stacked at location determined by Facility Manager.
Demolition Level Asbestos and Lead Survey Report
Mouth of Cottonwood Creek 22231 Adobe Road Manner Property
Residence, Car Port, Large Shed, Small Shed, Pump Shed, Collapsed Metal Shed Cottonwood, California
June 14, 2024
Terracon Project No. R120P020-80
Prepared for:
Mr. Rob Benson
California Department of Fish and Wildlife Engineering Branch
1010 Riverside Parkway West Sacramento, California
Prepared by:
Terracon Consultants, Inc.
1220 Concord Avenue, Suite 450 Concord, California 94520
(510) 557-7144
Report Prepared by: Wyatt Renner Industrial Hygienist, CSST # 15-5504
Report Reviewed by: _____________________________________Karin Schroeter Project Manager CAC #92-0772, CDPH #2228
P2699007 15 Pages
MOUTH OF COTTONWOOD CREEK WILDLIFE AREA -
ATTACHMENT 1
ii
June 14, 2024
Mr. Rob Benson California Department of Fish and Wildlife Engineering Branch 1010 Riverside Parkway West Sacramento, California
Telephone: (916) 323-1488 E-mail: rob.benson@wildlife.ca.gov
RE: Demolition Level Asbestos and Lead Survey Report Mouth of Cottonwood Creek Wildlife Area 22231 Adobe Road - Manner Property Cottonwood, California
Dear Mr. Benson:
Terracon Consultants, Inc. (Terracon) hereby submits the attached report for the referenced site to the Department of Fish and Wildlife. The purpose of this report is to present the data gathered during the recent hazardous materials building survey as performed by Terracon Consultants, Inc.
(Terracon) on April 8, 2024. We understand that this study was requested in preparation for the complete demolition of the affected structures.
Terracon appreciates the opportunity to provide this service to the Department of Fish and Wildlife. If you have any questions regarding this report, please contact our office at your convenience.
Sincerely, Terracon Consultants, Inc.
Wyatt Renner, CSST Karin Schroeter, CAC, CDPH Lead I/A Industrial Hygienist Industrial Hygiene Department Manager
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Scope
1.2 Reliance
2.0 METHODS AND SAMPLING STRATEGY
2.1 Asbestos, Lead, PCBs, and Other Hazardous Building Materials
2.2 Visual Assessment - Asbestos
2.3 Physical Assessment - Asbestos
2.4 Sample Analysis - Asbestos
2.5 Lead Containing Paint and Materials
2.6 Visual Assessment - Lead Containing Paint and Materials
2.7 Physical Assessment - Lead Containing Paint and Materials
2.8 Paint and Bulk Material Analysis - Lead
2.9 Visual Assessment - Other Hazardous Building Materials
3.0 SURVEY FINDINGS
3.1 Asbestos
3.2 Lead Containing Paint and Bulk Materials
3.3 Other Hazardous Building Materials
4.0 CONCLUSIONS
5.0 REGULATORY OVERVIEW
5.1 Asbestos
5.2 Lead Containing Paint/Materials
5.3 Refrigerants
5.4 Universal Waste
6.0 LIMITATIONS / GENERAL COMMENTS
APPENDIX A ASBESTOS ANALYTICAL LABORATORY DATA
APPENDIX B LEAD ANALYTICAL LABORATORY DATA
APPENDIX C ACM MATERIAL LOCATION DIAGRAMS
APPENDIX D SITE INSPECTOR CERTIFICATIONS
Asbestos, Lead and Health and Safety Survey Report Mouth of Cottonwood Creek Wildlife Area ■ Cottonwood, California June 14, 2024 ■ Terracon Project No. R120P020-80
Responsive ■ Resourceful ■ Reliable 1
DEMOLITION LEVEL ASBESTOS AND LEAD SURVEY REPORT
Mouth of Cottonwood Creek Wildlife Area
Residence, Car Port, Large Shed, Small Shed, Collapsed Metal Shed 22231 Adobe Road
Cottonwood, California
Terracon Project No. R120P020-80 June 14, 2024
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted a limited pre-demolition level hazardous materials survey of the residence, car port, large shed, small shed, and collapsed metal shed located at 22231 Adobe Road in Cottonwood, California. The survey was conducted on April 8th, 2024. Survey activities were conducted in general accordance with the asbestos sampling protocols established in Environmental Protection Agency (EPA) regulation 40 Code of Federal Regulations (CFR) Part 763 Subpart E 763.86, (Asbestos Hazard Emergency Response Act, AHERA).
The purpose of this survey was to identify asbestos and lead containing materials within the affected areas that may be impacted by the pending planned demolition project scheduled to occur at the property. The areas included in this survey were as follows:
· Residence
· Car Port
· Large Shed
· Small Shed
· Collapsed Metal Shed
· Pump Shed
A total of twenty-two (22) suspect asbestos containing materials (ACMs) were identified and sampled throughout the structures. Of the materials sampled, five (5) were reported positive for asbestos content in concentrations exceeding the laboratory limit of detection. One (1) material was not sampled and is assumed to contain asbestos. Confirmed and assumed asbestos containing materials were noted to be present in the residence.
Twenty-two (22) painted surfaces were sampled and analyzed for potential lead content during the survey. Of the items sampled, nineteen (19) were found to contain lead in concentrations in exceedance of the laboratory detection limit.
This is the start of the file's text. The full file is on GovTribe.