01_-_Price_Schedule_-_Generator_Maintenance_IDIQ.pdf

PDF 195 KB Posted

Attached to
Generator Maintenance and Repair Services IDIQ
Solicitation number
140P8522R0013
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Generator Maintenance, Inspections, Service Calls, and Repair

Preventative Maintenance QTY Unit Unit Price Totals Yosemite Creek lift Station #1 Generator 1 EA Yosemite Creek Lift Station #2 Generator 1 EA Yosemite Medical Clinic Generator 1 EA Housekeeping Generator 1 EA El Portal Complex Standby Generator 1 EA Hodgdon Well Standby Generator 1 EA Hodgdon Lift station Standby Generator 1 EA El Portal-Portable Standby Generator #2 1 EA Wawona Wastewater Backup Gen 1 EA El Portal Wastewater Backup Gen 1 EA Abbieville, Lift Station Backup Gen (El Portal) 1 EA Tuolumne Meadows Wastewater Backup Gen (El Portal) 1 EA El Portal Wastewater Portable Backup Gen 1 EA Utilities in El Portal and Yosemite Valley 1 EA Yosemite Village Lift Station 1 EA Yosemite Valley Sub-Station 1 EA Mather District Ranger Office 1 EA Wawona Tunnel Generator 1 EA Buildings and Grounds Fort Generac 1 EA TelComm -Hodgdon Meadow 1 EA TelComm -El Portal or Wawona 1 EA

Total Preventative Maintenance Cost

Repair QTY Unit Rate Total Service Calls Hourly Rates 1 HR $ Overtime/Weekend Hourly Rates 1 HR $ Holiday Hourly Rates 1 HR $ Note: For evaluation purposes, apply 20 hours against each rate and enter that total amount into the total column for that line item

Total Repair Costs

Additional Oil Testing QTY Unit Unit Price Total Laboratory Oil Testing and Analysis (pricing is for 1 EA one sample)

Emergency Generator Rental Daily Rate Weekly Rate Monthly Rate Total 500KW/625kVA Generator $ $ $ 60KW/175kVA Generator $ $ $ 250KW/312kVa Generator $ $ $ 45KW/45kVa Generator $ $ $ 175KW/220kVa Generator $ $ $ 150KW/480kVa Generator $ $ $ Note: For evaluation purposes, insert the weekly price amount into the total column for each line item

Total Rental Costs

Material Mark-up QTY Unit Mark-up % Total Repair Material Cost Mark-up 1 % Note: For evaluation purposes, the mark-up % will be applied to a flat rate of $5,000 and that amount will be inserted into the total column.

Do not include the $5,000 in the total.

Total Grand Total

Yosemite National Park

Price Schedule (Base Year) Generator Maintenance IDIQ

Preventative Maintenance QTY Unit Unit Price Totals Yosemite Creek lift Station #1 Generator 1 EA Yosemite Creek Lift Station #2 Generator 1 EA Yosemite Medical Clinic Generator 1 EA Housekeeping Generator 1 EA El Portal Complex Standby Generator 1 EA Hodgdon Well Standby Generator 1 EA Hodgdon Lift station Standby Generator 1 EA El Portal-Portable Standby Generator #2 1 EA Wawona Wastewater Backup Gen 1 EA El Portal Wastewater Backup Gen 1 EA Abbieville, Lift Station Backup Gen (El Portal) 1 EA Tuolumne Meadows Wastewater Backup Gen (El Portal) 1 EA El Portal Wastewater Portable Backup Gen 1 EA Utilities in El Portal and Yosemite Valley 1 EA Yosemite Village Lift Station 1 EA Yosemite Valley Sub-Station 1 EA Mather District Ranger Office 1 EA Wawona Tunnel Generator 1 EA Buildings and Grounds Fort Generac 1 EA TelComm -Hodgdon Meadow 1 EA TelComm -El Portal or Wawona 1 EA

Total Preventative Maintenance Cost

Repair QTY Unit Rate Total Service Calls Hourly Rates 1 HR $ Overtime/Weekend Hourly Rates 1 HR $ Holiday Hourly Rates 1 HR $ Note: For evaluation purposes, apply 20 hours against each rate and enter that total amount into the total column for that line item

Total Repair Costs

Additional Oil Testing QTY Unit Unit Price Total Laboratory Oil Testing and Analysis (pricing is for 1 EA one sample)

Emergency Generator Rental Daily Rate Weekly Rate Monthly Rate Total 500KW/625kVA Generator $ $ $ 60KW/175kVA Generator $ $ $ 250KW/312kVa Generator $ $ $ 45KW/45kVa Generator $ $ $ 175KW/220kVa Generator $ $ $ 150KW/480kVa Generator $ $ $ Note: For evaluation purposes, insert the weekly price amount into the total column for each line item

Total Rental Costs

Material Mark-up QTY Unit Mark-up % Total Repair Material Cost Mark-up 1 % Note: For evaluation purposes, the mark-up % will be applied to a flat rate of $5,000 and that amount will be inserted into the total column.

Do not include the $5,000 in the total.

Total Grand Total

Yosemite National Park

Price Schedule (Option Year 1)

Preventative Maintenance QTY Unit Unit Price Totals Yosemite Creek lift Station #1 Generator 1 EA Yosemite Creek Lift Station #2 Generator 1 EA Yosemite Medical Clinic Generator 1 EA Housekeeping Generator 1 EA El Portal Complex Standby Generator 1 EA Hodgdon Well Standby Generator 1 EA Hodgdon Lift station Standby Generator 1 EA El Portal-Portable Standby Generator #2 1 EA Wawona Wastewater Backup Gen 1 EA El Portal Wastewater Backup Gen 1 EA Abbieville, Lift Station Backup Gen (El Portal) 1 EA Tuolumne Meadows Wastewater Backup Gen (El Portal) 1 EA El Portal Wastewater Portable Backup Gen 1 EA Utilities in El Portal and Yosemite Valley 1 EA Yosemite Village Lift Station 1 EA Yosemite Valley Sub-Station 1 EA Mather District Ranger Office 1 EA Wawona Tunnel Generator 1 EA Buildings and Grounds Fort Generac 1 EA TelComm -Hodgdon Meadow 1 EA TelComm -El Portal or Wawona 1 EA

Total Preventative Maintenance Cost

Repair QTY Unit Rate Total Service Calls Hourly Rates 1 HR $ Overtime/Weekend Hourly Rates 1 HR $ Holiday Hourly Rates 1 HR $ Note: For evaluation purposes, apply 20 hours against each rate and enter that total amount into the total column for that line item

Total Repair Costs

Additional Oil Testing QTY Unit Unit Price Total Laboratory Oil Testing and Analysis (pricing is for 1 EA one sample)

Emergency Generator Rental Daily Rate Weekly Rate Monthly Rate Total 500KW/625kVA Generator $ $ $ 60KW/175kVA Generator $ $ $ 250KW/312kVa Generator $ $ $ 45KW/45kVa Generator $ $ $ 175KW/220kVa Generator $ $ $ 150KW/480kVa Generator $ $ $ Note: For evaluation purposes, insert the weekly price amount into the total column for each line item

Total Rental Costs

Material Mark-up QTY Unit Mark-up % Total Repair Material Cost Mark-up 1 % Note: For evaluation purposes, the mark-up % will be applied to a flat rate of $5,000 and that amount will be inserted into the total column.

Do not include the $5,000 in the total.

Total Grand Total

Yosemite National Park

Price Schedule (Option Year 2)

Preventative Maintenance QTY Unit Unit Price Totals Yosemite Creek lift Station #1 Generator 1 EA Yosemite Creek Lift Station #2 Generator 1 EA Yosemite Medical Clinic Generator 1 EA Housekeeping Generator 1 EA El Portal Complex Standby Generator 1 EA Hodgdon Well Standby Generator 1 EA Hodgdon Lift station Standby Generator 1 EA El Portal-Portable Standby Generator #2 1 EA Wawona Wastewater Backup Gen 1 EA El Portal Wastewater Backup Gen 1 EA Abbieville, Lift Station Backup Gen (El Portal) 1 EA Tuolumne Meadows Wastewater Backup Gen (El Portal) 1 EA El Portal Wastewater Portable Backup Gen 1 EA Utilities in El Portal and Yosemite Valley 1 EA Yosemite Village Lift Station 1 EA Yosemite Valley Sub-Station 1 EA Mather District Ranger Office 1 EA Wawona Tunnel Generator 1 EA Buildings and Grounds Fort Generac 1 EA TelComm -Hodgdon Meadow 1 EA TelComm -El Portal or Wawona 1 EA

Total Preventative Maintenance Cost

Repair QTY Unit Rate Total Service Calls Hourly Rates 1 HR $ Overtime/Weekend Hourly Rates 1 HR $ Holiday Hourly Rates 1 HR $ Note: For evaluation purposes, apply 20 hours against each rate and enter that total amount into the total column for that line item

Total Repair Costs

Additional Oil Testing QTY Unit Unit Price Total Laboratory Oil Testing and Analysis (pricing is for 1 EA one sample)

Emergency Generator Rental Daily Rate Weekly Rate Monthly Rate Total 500KW/625kVA Generator $ $ $ 60KW/175kVA Generator $ $ $ 250KW/312kVa Generator $ $ $ 45KW/45kVa Generator $ $ $ 175KW/220kVa Generator $ $ $ 150KW/480kVa Generator $ $ $ Note: For evaluation purposes, insert the weekly price amount into the total column for each line item

Total Rental Costs

Material Mark-up QTY Unit Mark-up % Total Repair Material Cost Mark-up 1 % Note: For evaluation purposes, the mark-up % will be applied to a flat rate of $5,000 and that amount will be inserted into the total column.

Do not include the $5,000 in the total.

Total Grand Total

Yosemite National Park

Price Schedule (Option Year 3)

Preventative Maintenance QTY Unit Unit Price Totals Yosemite Creek lift Station #1 Generator 1 EA Yosemite Creek Lift Station #2 Generator 1 EA Yosemite Medical Clinic Generator 1 EA Housekeeping Generator 1 EA El Portal Complex Standby Generator 1 EA Hodgdon Well Standby Generator 1 EA Hodgdon Lift station Standby Generator 1 EA El Portal-Portable Standby Generator #2 1 EA Wawona Wastewater Backup Gen 1 EA El Portal Wastewater Backup Gen 1 EA Abbieville, Lift Station Backup Gen (El Portal) 1 EA Tuolumne Meadows Wastewater Backup Gen (El Portal) 1 EA El Portal Wastewater Portable Backup Gen 1 EA Utilities in El Portal and Yosemite Valley 1 EA Yosemite Village Lift Station 1 EA Yosemite Valley Sub-Station 1 EA Mather District Ranger Office 1 EA Wawona Tunnel Generator 1 EA Buildings and Grounds Fort Generac 1 EA TelComm -Hodgdon Meadow 1 EA TelComm -El Portal or Wawona 1 EA

Total Preventative Maintenance Cost

Repair QTY Unit Rate Total Service Calls Hourly Rates 1 HR $ Overtime/Weekend Hourly Rates 1 HR $ Holiday Hourly Rates 1 HR $ Note: For evaluation purposes, apply 20 hours against each rate and enter that total amount into the total column for that line item

Total Repair Costs

Additional Oil Testing QTY Unit Unit Price Total Laboratory Oil Testing and Analysis (pricing is for 1 EA one sample)

Emergency Generator Rental Daily Rate Weekly Rate Monthly Rate Total 500KW/625kVA Generator $ $ $ 60KW/175kVA Generator $ $ $ 250KW/312kVa Generator $ $ $ 45KW/45kVa Generator $ $ $ 175KW/220kVa Generator $ $ $ 150KW/480kVa Generator $ $ $ Note: For evaluation purposes, insert the weekly price amount into the total column for each line item

Total Rental Costs

Material Mark-up QTY Unit Mark-up % Total Repair Material Cost Mark-up 1 % Note: For evaluation purposes, the mark-up % will be applied to a flat rate of $5,000 and that amount will be inserted into the total column.

Do not include the $5,000 in the total.

Total Grand Total

Yosemite National Park

Price Schedule (Option Year 4)

Base
Option Year 1
Option Year 2
Option Year 3
Option Year 4

File details come from the government source that posted it. Updated .