This request for quotation outlines requirements for the manufacture of 400 cable shedders and 400 ISO clamps. The National Oceanic and Atmospheric Administration will provide the necessary materials, including 150 feet of 3.0-inch diameter Hydex4101 PBT and 60 feet of 1.5-inch diameter Micarta rod. All parts must meet dimensional specifications and be free of defects as defined in the drawings and models. Delivery within 30 days of receipt of materials is required. Technical capability, lead time, and price will be evaluated, with all factors weighted equally. The solicitation number for this opportunity is PMEL-23-0588_RFQ, issued by the Department of Commerce's National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
000917 ATLAS Cable Shedder.pdf PDF
Non-Commercial 2023 Provisions and Clauses.docx DOCX document
000795 ISO Clamp.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATLAS Cable Shedders & ISO Clamps Statement of Work

Monday, March 6, 2023 Scope of work:

Scope of work is to manufacture 400 ATLAS Cable Shedders & 400 ISO Clamps from NOAA part drawing files & Solidworks Model Files. The 400 ATLAS Cable Shedders will be made with NOAA provided 3.0” Diameter Hydex4101 PBT total qty 150ft (qty 15 pieces 10ft long). The 400 ISO Clamps will also be made from NOAA provided 1.5” diameter Micarta Rod total qty 60ft (qty 15 pieces 4’long). All Parts will meet dimensional specifications of the print and be free from defects and burrs.

Requirements:

All Parts will meet dimensional specifications of the print and be free from defects and burrs. No Material substitutions unless reviewed & approved by NOAA Engineers.

Deliverables:

Delivery will be made within 30 days of upon the contractor’s receipt of NOAA provided material Evaluation Factors: The following evaluation factors are equally weighted.

Technical Capability Contractor will have machining & inspection capabilities required to manufacture the parts and perform in-process and final inspections.

Lead Time

Price

File details come from the government source that posted it. Updated .