R2 Paving RFB - OR126E MP10. 87-38. 02 Intermittent Overlay Paving
Solicitation number
S-73000-00017512
Issued by
Oregon

About this file

This is a Request for Bid (RFB) document issued by the Oregon Department of Transportation (ODOT) for on-call Region 2 paving services. The project involves an intermittent 2-inch overlay paving operation on Oregon Route 126E (Highway 015) spanning from milepoint 10.87 to 38.02 in Lane County, with work extending full width from edge of pavement to edge of pavement. Key project activities include cold plane pavement removal, asphalt concrete placement, guardrail adjustment (with 1,000 feet allocated as an allowance), shoulder rock installation, recessed marker removal and replacement, and longitudinal marking restoration. The anticipated work items encompass 11 pay items, including mobilization, temporary traffic control, pollution control planning, 942 tons of aggregate shoulders, 10,133 square yards of cold plane pavement removal at 0"-2" depth, 10,785 tons of Level 3 asphalt mixture, guardrail adjustments, hi-build paint application totaling 85,510 linear feet, and 673 recessed bi-directional yellow markers. The bid submission deadline is August 5, 2026, at 2:00 p.m., with required project completion by October 30, 2026. Only contractors holding an existing On-Call Region 2 Paving Price Agreement are eligible to submit bids.

The RFB requires compliance with Oregon's domestic preference requirements under ORS 279C.303 and adherence to prevailing wage rates effective July 5, 2026, for Lane County public works projects. Traffic control restrictions apply, with no lane closures permitted during commute times (5:30 a.m. to 9:00 a.m. and 3:30 p.m. to 7:00 p.m.) and no Friday, weekend, or holiday work on the MP10.87-13.06 segment, while the MP13.06-38.02 segment prohibits weekend and holiday work. Portable Changeable Message Signs must be placed a minimum of seven days prior to any ramp or lane closure. Contractors must submit unit prices and total bid prices for all line items, with payment based on actual quantities performed rather than estimated quantities. The ODOT Project Manager is Cody Stone (503-953-6334; Cody.Stone@ODOT.Oregon.gov), and the work order will not be effective until signed by ODOT's Procurement Authority and a notice to proceed is issued.

View the file

Other files

File Type Posted
Table of Work Locations~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REQUEST FOR BID AND RESULTING WORK ORDER
On-Call Region 2 Paving
INSTRUCTIONS: ODOT will fill in all information below except Contractor Information, Work Order Number (to be added upon award of Work Order), and pricing. ODOT will provide a list of bid items and their estimated quantities. Contractor must complete the Contractor Information section, including a signature, and insert unit and total prices for all bid items. Contractor must submit its bid by uploading the completed Request for Bid/Work Order form to the Attachments tab for the project in OregonBuys and entering the total bid price on the Items tab.
This request for bid and any resulting work order are subject to the domestic preference requirements of ORS 279C.303. See Project Specific Requirements section below for additional information.
Request for Bid Number: S-73000-00017512 V2Work Order Number:

Issue Date: 7/16/2026 Revised 7/20/2026 Bid due date and time: 8/5/2026 2:00 pm

Project Name: OR126E MP10.87-38.02 Intermittent Overlay Paving

Project description (include milepoint locations): Intermittent 2" overlay paving on OR126E (015) from MP10.87 to 38.02, full width edge of pavement to edge of pavement. Adjust existing guardrail to grade. The exact amount of guardrail adjustment is unknown so an allowance of 1,000' has been included in this bid as a starting point. Overlay paving is to extend to face of guardrail post, or the face drainage curb under the rail if present. Remove existing recessed markers before proceeding with overlay paving. At BR03964A Gray Ck (MP10.44), taper grind 0"-2" on both ends and inlay 2" across the deck (5" AC existing). Per 00744.90, sawing and sealing joints is incidental to the paving. Shoulder rock is assumed to be installed 3' wide with the compacted depth equal to the overlay thickness. At paved driveways and driveway approaches, wing out 2.5' per inch of ACP thickness and taper down to existing grade. Milled tapers at project start and stop points and county road approaches (taper lengths for highway butt joints per RD610, taper county road connections 50' per inch of ACP thickness). Longitudinal markings and legends and bars to match existing color, layout/location, and material as existing. Follow 00744.44(c) regarding guidance for drop offs at the longitudinal joint due to overlay paving.

ODOT Project Manager Name and Phone number: Cody Stone 503-953-6334
ODOT Project Manager Billing Address (may be an email): Cody.Stone@ODOT.Oregon.gov

ODOT Site Representative (if different than ODOT Project Manager):

Required Completion Date: October 30, 2026

CONTRACTOR INFORMATION

Contractor (COMPANY) Legal Name:

Address:

Contact Person: Email:

Phone: CCB #:

Contractor's On-Call Region 2 Paving Price Agreement Number: PO-73000-

Contractor’s signature below indicates its firm offer to provide the Services described in this Work Order in accordance with all terms, conditions, and specifications contained in the Price Agreement referenced above, and any additional specifications contained within this Work Order and its attachments. The Work Order is not effective until it is signed by ODOT's Procurement Authority, and ODOT issues a notice to proceed.

Contractor Signature: Date:

ODOT Signature (Procurement Authority):Date:
ANTICIPATED WORK ITEMS (PAY ITEMS)
This Work Order indicates an estimate of services/quantities required. Payment to Contractor will be made based on actual quantities provided/performed:
ItemDescriptionEst. Qty.UnitUnit PriceTotal Price
1Mobilization1LS$ - 0
2Temporary Work Zone Traffic Control, Complete1LS$ - 0
3Pollution Control Plan1LS$ - 0
4Aggregate Shoulders942TON$ - 0
5Cold Plane Pavement Removal, 0"-2" Deep10,133SQ YD$ - 0
6Cold Plane Pavement Removal, 2" Deep220SQ YD$ - 0
7Level 3, 1/2" Dense ACP Mixture (PG64-22)10,785TON$ - 0
8Extra for Asphalt Approaches60EACH$ - 0
9Hi-Build Paint, Extruded or Sprayed, Surface85,510FOOT$ - 0
10Bi-Directional Yellow Type IAR Markers, Recessed673EACH$ - 0
11Adjusting Guardrail1,000FOOT$ - 0
$ - 0
PROJECT SPECIFIC REQUIREMENTS

X This project requires compliance with the domestic preference requirements of ORS 279C.303. Contractor shall comply with Price Agreement Exhibit A - State Buy America Provisions.

X This project requires payment of the following prevailing wage rates, which are available online at http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx:

The “PREVAILING WAGE RATES for Public Works Contracts in Oregon” dated July 5, 2026

County where the work will be performed: Lane
XThe following attachments are incorporated into this Request for Bid and any resulting Work Order:

Table of Work Locations.PDF

X One or more traffic lanes may be closed when allowed, shown, or directed during the following periods of time:

MP10.87-13.06: No closures during commute times (5:30 AM to 9:00 AM and 3:30 PM to 7:00 PM), and no work on fridays, weekends, or holidays.

MP13.06-38.02: No work on weekends or holidays.

X Portable Changeable Message Signs (PCMS) shall be placed a minimum of 7 days in advance of any ramp or lane closure to alert the public of the closure. The location of the PCMS and the message on the PCMS shall be submitted to the Project Manager as part of the Contractor’s proposed TCP.

Traffic will be allowed on the cold planed surface up to ____ calendar days after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic.

COMMENTS & SPECIAL INSTRUCTIONS:

Sheet3

RouteHWYMP 1MP 2Length (mi)Calc'ed Length (ft)Measured Length (ft)Width (ft)Depth (in)ACP (tons)2"-0" CPPR (sqyds)Rock (ton)Inlaid Markers (ea)Paint (lf)ACP Approaches (ea)MP 1MP 2LinesPaint (lf)
OR126E01510.87011.0500.180950.401000.00342425.03022.235.025.02554.24.010.87010.9453.251287
OR126E01513.20014.4001.2006336.006500.003222600.01422.2227.5162.517153.426.010.94511.00541267.2
OR126E01519.08019.7100.6303326.403500.003221400.01422.2122.587.512922.87.013.20013.3352.251603.8
OR126E01520.28021.3901.1105860.805900.003222360.01422.2206.5147.517080.86.013.33513.5553.253775.2
OR126E01534.20035.0100.8104276.804200.003221680.01422.2147.0105.014064.616.013.55513.63041584
OR126E01536.96038.0201.0605596.805800.003222320.01422.2203.0145.021733.81.013.63013.7753.252488.2
10785.010133.3941.5672.585509.660.013.77514.3702.257068.6
14.37014.4004633.6
19.07019.2203.252574
19.22019.710410348.8
20.28020.5603.254804.8
20.56020.9152.254217.4
20.91521.0253.251887.6
21.02521.0554633.6
21.05521.2153.252745.6
21.21521.2552.25475.2
21.25521.3903.252316.6
34.20034.2354739.1999999999
34.23534.4153.253088.8
34.41534.5452.251544.4
34.54534.6903.252488.1999999999
34.69034.83543062.4000000001
34.83534.9453.251887.6
34.94534.9804739.1999999999
34.98035.0103.25514.8
36.96037.1253.252831.4
37.12538.020418902.4000000001

File details come from the government source that posted it. Updated .