This is a Bid Pricing Form for the MBM District 3 Bridge Joint Replacement Project administered by the State of Oregon. The project encompasses all labor, materials, transportation, equipment, permits, traffic control, and services necessary for the completion of bridge joint replacement construction work. The form establishes the pricing structure through which bidders submit their cost proposals for performing the identified construction activities in accordance with the contract documents.
The bid pricing form utilizes a line-item format requiring bidders to provide unit prices and extended costs for the specified work elements associated with the bridge joint replacement project. Bidders must complete all pricing sections accurately and in accordance with the instructions provided in the invitation to bid. The pricing submissions serve as the basis for contract award evaluation and subsequent payment for work performed under the resulting construction contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017476 Invitation To Bid.docx | DOCX document | |
| 00017476 Exhibit 6 Plans.pdf | ||
| 00017476 Exhibit 5 Specifications.docx | DOCX document | |
| 00017476 Sample Contract.PI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT A Form A-2 - BID PRICING FORM S-73000-00017476 | |
| Bidder name: | |
| City, State: | Salem, Oregon |
The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the ITB and the Plans, Specifications and other provisions incorporated in the ITB, on the basis of the lump sum or unit prices, or both, as follows:
| Item | Description | Est Qty | Unit | Unit Price | Total |
| 1 | Mobilization | 1 | LS | $0.00 | |
| 2 | Pollution Control Plan | 1 | LS | $0.00 | |
| BR07855B - Chemawa Rd NE over Hwy 1 and Hwy 72 Conn | |||||
| 3a | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 3b | Elastomeric Concrete Nosing Material | 38 | CUFT | $0.00 | |
| 3c | Constructing Elastomeric Concrete Nosing | 228 | SQFT | $0.00 | |
| 3d | Bonded Preformed Silicone Seal | 1 | LS | $0.00 | |
| 3e | Removal Of Existing Joint Surfaces | 1 | LS | $0.00 | |
| 3f | Control Joint | 1 | LS | $0.00 | |
| BR07855C - Hwy 1 NB over Hwy 72 NB | |||||
| 4a | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 4b | Elastomeric Concrete Nosing Material | 38 | CUFT | $0.00 | |
| 4c | Constructing Elastomeric Concrete Nosing | 149 | SQFT | $0.00 | |
| 4d | Bonded Preformed Silicone Seal | 1 | LS | $0.00 | |
| 4e | Removal Of Existing Joint Surfaces | 1 | LS | $0.00 | |
| 4f | Control Joint | 1 | LS | $0.00 | |
| BR07855D - Hwy 1 SB over Hwy 72 NB | |||||
| 5a | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 5b | Elastomeric Concrete Nosing Material | 32 | CUFT | $0.00 | |
| 5c | Constructing Elastomeric Concrete Nosing | 149 | SQFT | $0.00 | |
| 5d | Bonded Preformed Silicone Seal | 1 | LS | $0.00 | |
| 5e | Removal Of Existing Joint Surfaces | 1 | LS | $0.00 | |
| 5f | Control Joint | 1 | LS | $0.00 | |
| BR16086 - Labish Bottom, Hwy 1 NB | |||||
| 6a | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 6b | Elastomeric Concrete Nosing Material | 51 | CUFT | $0.00 | |
| 6c | Constructing Elastomeric Concrete Nosing | 136 | SQFT | $0.00 | |
| 6d | Bonded Preformed Silicone Seal | 1 | LS | $0.00 | |
| 6e | Removal Of Existing Joint Surfaces | 1 | LS | $0.00 | |
| 6f | Control Joint | 1 | LS | $0.00 | |
| BR16086A - Labish Bottom, Hwy 1 SB | |||||
| 7a | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 7b | Elastomeric Concrete Nosing Material | 29 | CUFT | $0.00 | |
| 7c | Constructing Elastomeric Concrete Nosing | 136 | SQFT | $0.00 | |
| 7d | Bonded Preformed Silicone Seal | 1 | LS | $0.00 | |
| 7e | Removal Of Existing Joint Surfaces | 1 | LS | $0.00 | |
| 7f | Control Joint | 1 | LS | $0.00 | |
| BID TOTAL | $0.00 |