0001 2- 20-09-14 JLSS 17-0024 DRAWINGS 2-17-2021.pdf
PDF 28 MB Posted
- Solicitation number
- FA671221B0002
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIN
IS
H 1 .5 M
ILE
M f a g b o l c k j i n d p h
E
Q
R
Phase IV: Final Design
CONSTRUCT EQUIPMENT PARKING SHELTER - JLSS 17-0024
SCALE: not to scale
CONSTRUCTION SITE LOCATION PLAN1
A100
APPROXIMATE
CONSTRUCTION
LIMITS
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG.
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 28 AUGUST 2020 REFER TO DWG. SHEET OF .45
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (Bldg. 5522)
SBT/DAC
DAC
SBT
E
A
E
4 5 6
PLATE
GTP 410-038 G-000
COVER SHEET, INDEX OF DRAWINGS,
VICINITY & SITE LOCATION MAPS
Air Force Reserve Command 911th Airlift Wing
28 August 2020
BLDG. 106 COMMERCIAL VEHICLE
INSPECTION
BLDG. 107 SECURITY/CHECK-IN
BLDG. 108 MAIN GATE
BLDG. 210 OPERATIONAL
CONTRACTING OFFICE
BLDG. 333 BASE CIVIL ENGINEER
MAIN GATE
SECURITY/CHECK-IN
OPERATIONAL
CONTRACTING
OFFICE
BASE CIVIL
ENGINEER
COMMERCIAL VEHICLE INSPECTION
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S T A R T
AutoCAD SHX Text
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
AIRLIFT AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
AVE
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SERGEANTS WAY
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
ST
AutoCAD SHX Text
HERMAN
AutoCAD SHX Text
ST
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
ROCKY LANE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text water tower
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
M
Q
C B
22.9' OF 18" CORR HDPE @ 1.0%
29.6' OF 18" CORR HDPE @ 1.0%
45.3' OF 18" CORR HDPE @ 1.0%
C B
154.7' OF 18" CORR HDPE @ -1.0%
F I NIS
H 1 . 5 MI LE
M f a g b o l c k j i n d p h
E
Q
R
SCALE: 1" = 40'
CONSTRUCTION SITE LOCATION PLAN1
G-001 G-001
JLSS 17-0001 : AREA OF WORK
(NOT IN CONTRACT)
JLSS 17-0024 : AREA OF WORK
PROJECT DEMARCATION PLAN
PROJECT JLSS 17-0001 : Building 5520
(NOT IN CONTRACT)
TITLE: CONSTRUCT LIQUID OXYGEN (LOX) STORAGE FACILITY.
DESCRIPTION: LOX Storage Facility will be approximately 2,000 square feet and house two (2) 3,000 gallon liquid oxygen storage tanks. The facility will include one 8ft x 8ft room for personnel changing area, storage of personal protective equipment, and records. One small infrared heater will be located in the changing room for use during extremely cold weather. A telephone is required for emergency use. The existing temporary security fence will be demolished and must be replaced with a permanent fence with gates to permit access to the facility and to the adjacent flightline.
PROJECT JLSS 17-0024 : Building 5522
TITLE: CONSTRUCT SUPPORT EQUIPMENT PARKING SHELTER.
DESCRIPTION: Equipment Parking Shelter will be approximately 1,385 square feet. This shelter will house eight (8) LOX carts, two (2) gaseous oxygen (GOX) carts, and Patient Therapeutic (PT) LOX Converter lockers and accompanying support equipment. The parking area shall be 20 feet wide in front of the shelter to accommodate vehicle movement, safety margins, and equipment towing operations. The access roads will be single lane and may be asphalt where allowed by regulations. Project will include the addition of flightline roadway striping to facilitate access to the storage location, with stop signs and safety signs to keep traffic from stopping within the aircraft taxiway object free area.
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG.
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 28 AUGUST 2020 REFER TO DWG. SHEET OF .45
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (Bldg. 5522)
SBT/DAC
DAC
SBT
E
A
E
4 5 6
PLATE
GTP 410-038
JLSS 17-0001 : PROJECT AREA OF WORK
JLSS 17-0024 : PROJECT AREA OF WORK
EXISTING BUILDING OR STRUCTURE
SCALE: not to scale
Key Plan
SHEET LEGEND
PROJECT DEMARCATION LINE
CHAIN LINK SECURITY FENCE
LOX DELIVERY TRUCK ROUTE
VEHICULAR PATH OF TRAVEL
BIG RED SECURITY LINE
DO NOT CROSS
BIG RED SECURITY LINE
DO NOT CROSS
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text water tower
AutoCAD SHX Text
PHE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S T A R T
AutoCAD SHX Text
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
AIRLIFT AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
AVE
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SERGEANTS WAY
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
ST
AutoCAD SHX Text
HERMAN
AutoCAD SHX Text
ST
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
ROCKY LANE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text water tower
AutoCAD SHX Text
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
C B
MH
C
B
CB
CB
C B
CB
CB
CB
C B
154.7' OF 18" CORR HDPE @ -1.0%
F I NIS
H 1 . 5 MI LE
M f a g b o l c k j i n d p h
E
Q
R
M
Q
C B
CB
CB
MH
C B
CB
CB
C B
CB
CB
CB
22.9' OF 18" CORR HDPE @ 1.0%
29.6' OF 18" CORR HDPE @ 1.0%
45.3' OF 18" CORR HDPE @ 1.0%
C B
154.7' OF 18" CORR HDPE @ -1.0%
G-002
SCALE: not to scale
Key Plan
Site Plan - Building Locations
LOX Bldg.
(5520)
Parking Shelter (5522)
SCALE: not to scale
Site Plan - LOX Delivery Route
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
LOX Storage Tank (NIC)
LOX Storage Tank (NIC)
Parkin g Apron
Asphalt Driveway
GOX-1
GOX-2
LOX-1
LOX-2
LOX-3
LOX-4
LOX-5
LOX-6
LOX-7
LOX-8
PT LOX Lockers and Equipment
Asphalt Driveway
Asphalt Driveway
Concrete Parking
Concrete Parking
Concrete Parking
±8 0'
-0
Existing Apron Lighting Pole (P1-2) 20 '-0
Asphalt Extension
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
12" dia. bollard protection
Existing chain link security fence, typ.
Chain link security fence and gate, typ.
LOX Delivery Route
LOX Delivery Route
Existing Asphalt Parking Area
LOX Delivery Truck Route
LOX Delivery Truck Route and 50-ft turning radius
TA
XI
LA
NE
C
EN
TE
RL
IN
E
A100
A100
TA
XI
LA
NE
C
EN
TE
RL
IN
E
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
LOX Delivery Truck Route and 50-ft turning area
Chain link security fence, typ.
Building 416 (existing)
Building 417 (existing)
Building 415 (existing)
Stop Sign & Warning Signage
Stop Sign & Warning Signage
PROJECT COORDINATION AND
LOX DELIVERY ROUTE
JLSS 17-0001 : N.I.C.
JLSS 17-0024 : AREA OF WORK
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG.
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 28 AUGUST 2020 REFER TO DWG. SHEET OF .45
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (Bldg. 5522)
SBT/DAC
DAC
SBT
E
A
E
4 5 6
PLATE
GTP 410-038
Pa rki ng A pr on
JLSS 17-0001 : N
.I.C
JLSS 17-0001 : N.I.C.
JLSS 17-0024 : AREA OF WORK
JL
SS
-0
4 :
A
RE
A
OF
W
OR
K
JL
SS
-0
4 :
A
RE
A
OF
W
OR
K
JLSS 17-0001 : N.I.C.
JLSS 17-0001 : N
.I.C
JLSS 17-0024 : AREA OF WORK
JLSS 17-0024 : A
REA OF WORK
0 8' 16' 32'
SCALE: 1/16"=1'-0" (IN FEET)
CONCRETE PAVING
SHEET LEGEND
ASPHALT PAVING
PROJECT DEMARCATION LINE
EXISTING BUILDING OR STRUCTURE
CHAIN LINK SECURITY FENCE
LOX DELIVERY TRUCK ROUTE
VEHICULAR PATH OF TRAVEL
CIVIL AREA OF WORK ONLY
Civil excavation area only, coordinate with JLSS 17-0001 and Contracting Officer
Building sign
Building sign
BIG RED SECURITY LINE
DO NOT CROSS
BIG RED SECURITY LINE
DO NOT CROSS
110-ft Flightline Offset (C-17 wingtip plus 25-ft)
NOTE 1: Construction Coordination Any construction work on the west side of the Flightline Offset Line will require a seven (7) day advance notification and approval from the Contracting Officer, as this work is in an active aircraft movement area.
NOTE 2: Emergency Fuel Shut-Off Coordination Emergency Fuel Shut-Off (EFSO) boxes may be installed within the Flightline Offset clearance area, provided the height is not more than 30-inches above the ground and not more than 24-inches above the elevation of the adjacent load-bearing pavement. EFSO boxes must be completely painted with reflective paint or have a minimum 4-inch wide retro-reflective tape or paint surrounding stripe to ensure visibility during night operations. Reference UFC_3_260_04, Chapter
6 for guidelines.
Coordinate with Contracting Officer for specific offset distance from Taxilane Centerline and edge of parking apron pavement.
Relocate existing Emergency Fuel
Shut-Off Box AFTER installation of replacement system Existing Electrical Manhole
Existing Emergency Fuel Shut-Off Box to remain
Subterranean stormwater management system
Subterranean stormwater management system
Remove existing Emergency Fuel
Shut-Off Line AFTER installation of replacement.
remove abandoned electrical conduit
Replacement Emergency Fuel
Shut-Off Box. Install BEFORE removal of existing system
Relocated Emergency Fuel Shut-Off Box.
Install BEFORE removal of existing system
Existing Emergency Fuel Shut-Off Line to remain
Replacement Emergency Fuel
Shut-Off Line. Install BEFORE removal of existing system
Replacement Emergency Fuel
Shut-Off Line. Install BEFORE removal of existing system
110-ft Flightline Offset (C-17 wingtip plus 25-ft)
Remove existing Emergency Fuel
Shut-Off Line AFTER installation of replacement.
Existing electrical line. Coordinate any expected service interruption with Contracting Officer and Airfield Manager.
Relocated Emergency Fuel Shut-Off Box.
Install BEFORE removal of existing system
Relocate existing Emergency Fuel
Shut-Off Box AFTER installation of replacement system
AutoCAD SHX Text
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S T A R T
AutoCAD SHX Text
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
AIRLIFT AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
AVE
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SERGEANTS WAY
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
ST
AutoCAD SHX Text
HERMAN
AutoCAD SHX Text
ST
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
ROCKY LANE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text water tower
AutoCAD SHX Text
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text water tower
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
AutoCAD SHX Text
C B
MH
C B
CB
CB
C B
CB
CB
CB
C B
154.7' OF 18" CORR HDPE @ -1.0%
F I NIS
H 1 . 5 MI LE
M f a g b o l c k j i n d p h
E
Q
R
FIN
IS
H 1.
5 M
ILE
M f a g b o n d p h
E
Q
R
G-003
SCALE: not to scale
Key Plan
Site Plan - Building Locations
LOX Bldg.
(5520)
Parking Shelter (5522)
SCALE: not to scale
Site Plan - LOX Delivery Route
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
LOX Storage Tank (NIC)
LOX Storage Tank (NIC)
Parkin g Apron
Asphalt Driveway
GOX-1
GOX-2
LOX-1
LOX-2
LOX-3
LOX-4
LOX-5
LOX-6
LOX-7
LOX-8
PT LOX Lockers and Equipment
Asphalt Driveway
Asphalt Driveway
Concrete Parking
Concrete Parking
Concrete Parking
±8 0'
-0
Existing Apron Lighting Pole (P1-2) 20 '-0
Asphalt Extension
12" dia. bollard protection
Existing chain link security fence, typ.
Existing Fuel Shutoff Box
Existing Electrical Manhole
A100
A100
Existing Fuel Shutoff Box
TA
XI
LA
NE
C
EN
TE
RL
IN
E
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
Install chain link security fence, typ.
Building 416 (existing)
Building 417 (existing)
Building 415 (existing)
Stop Sign & Warning Signage
Stop Sign & Warning Signage
PROJECT COORDINATION
JLSS 17-0001 : N.I.C.
JLSS 17-0024 : AREA OF WORK
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG.
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 28 AUGUST 2020 REFER TO DWG. SHEET OF .45
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (Bldg. 5522)
SBT/DAC
DAC
SBT
E
A
E
4 5 6
PLATE
GTP 410-038
Pa rki ng A pr on
JLSS 17-0001 : N
.I.C
JLSS 17-0001 : N.I.C.
JLSS 17-0024 : AREA OF WORK
JL
SS
-0
4 :
A
RE
A
OF
W
OR
K
JL
SS
-0
4 :
A
RE
A
OF
W
OR
K
JLSS 17-0001 : N.I.C.
JLSS 17-0001 : N
.I.C
JLSS 17-0024 : AREA OF WORK
JLSS 17-0024 : A
REA OF WORK
Contractor Material Storage Area
Contractor Haul Route
MAIN GATE
SECURITY/CHECK-IN
COMMERCIAL VEHICLE INSPECTION
0 8' 16' 32'
SCALE: 1/16"=1'-0" (IN FEET)
Temporary Construction Fence Temporary Construction Gate
Temporary Construction Fence
NOTE:
Any construction work on the west side of the Flightline Offset Line will require a seven (7) day advance notification and approval from the Contracting Officer, as this work is in an active aircraft movement area.
Existing chain link security fence, typ.
Install chain link security fence, typ.
TEMPORARY CONSTRUCTION FENCE
SHEET LEGEND
PROJECT DEMARCATION LINE
CHAIN LINK SECURITY FENCE
Civil excavation area only, coordinate with JLSS 17-0001 and Contracting Officer
Building sign
Building sign
Maintain clear path of travel for base operational vehicles during construction period.
Coordinate any interruptions with base Operations.
Maintain 20-ft clear path of travel for base operational vehicles during construction period. Coordinate any interruptions with base Operations.
Temporary Construction Barricade Phase with Stormwater Management civil work, coordinate with Contracting Officer and base security & operations.
BIG RED SECURITY LINE
DO NOT CROSS
BIG RED SECURITY LINE
DO NOT CROSS
EXISTING BUILDING OR STRUCTURE
CONTRACTOR MATERIAL STORAGE AREA
LOX DELIVERY TRUCK ROUTE
VEHICULAR PATH OF TRAVEL
CIVIL AREA OF WORK ONLY
TEMPORARY CONSTRUCTION BARRIER
135-ft Flightline Offset (C-17 wingtip plus 25-ft)
135-ft Flightline Offset (C-17 wingtip plus 25-ft)
110-ft Flightline Offset (C-17 wingtip plus 25-ft)
Existing Fuel Shutoff Box
Relocated Fuel Shutoff Box
Relocated Fuel Shutoff Box
Relocated Fuel Shutoff Box
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S T A R T
AutoCAD SHX Text
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
AIRLIFT AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
AVE
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SERGEANTS WAY
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
ST
AutoCAD SHX Text
HERMAN
AutoCAD SHX Text
ST
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
ROCKY LANE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text water tower
AutoCAD SHX Text
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S T A R T
AutoCAD SHX Text
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
AVE
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SERGEANTS WAY
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
ROCKY LANE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text water tower
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
LIGHT POLE
AND BASEAB
AN
DO
NE
D
CO
ND
UI
T
AP
PR
OX
. U
ND
ER
GR
OU
ND
E
LE
CT
RI
CA
L F
UE
L S
HU
TO
FF
LI
NE
AP
PR
OX
. U
ND
ER
GR
OU
ND
E
LE
CT
RI
CA
L L
IN
E
AP
PR
OX
. U
ND
ER
GR
OU
ND
E
LE
CT
RI
CA
L F
UE
L
SH
UT
OF
F L
IN
E
SHUTOFF
BOX
SHUTOFF
BOX ELECTRIC
MANHOLE
B-2
B-3
B-1
B-8
B-7
B-9
C B
CB
MH
C B
CB
CB
C B
CB
CB
CB
22.9' OF 18" CORR HDPE @ 1.0%
29.6' OF 18" CORR HDPE @ 1.0%
45.3' OF 18" CORR HDPE @ 1.0%
C B
154.7' OF 18" CORR HDPE @ -1.0%
F I NIS
H 1 . 5 MI LE
M f a g b o l c k j i n d p h
E
Q
R
B-101
SCALE: not to scale
Key Plan
Site Plan - Building Locations
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
Parkin g Apron
Existing Apron Lighting Pole (P1-2)
Existing Fuel Shutoff Box
Existing Electrical Manhole
Existing Asphalt Parking Area
TA
XI
LA
NE
C
EN
TE
RL
IN
E
JLSS 17-0024 : AREA OF WORK
A100
Existing Fuel Shutoff Box
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
135-ft Flightline Offset (C-17 wingtip plus 50-ft)
Building 416 (existing)
Building 417 (existing)
Building 415 (existing)
GEOTECHNICAL SOIL BORE
LOCATIONS
SHEET LEGEND
CORE BORING LOCATION
PROJECT DEMARCATION LINE
EXISTING BUILDING OR STRUCTURE
GENERAL SHEET NOTES
B-1
1. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH
THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
2. REFER TO SHEET B-201 FOR SOIL BORING LOGS.
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG.
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 28 AUGUST 2020 REFER TO DWG. SHEET OF .45
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (Bldg. 5522)
SBT/DAC
DAC
SBT
E
A
E
4 5 6
PLATE
GTP 410-038
Pa rki ng A pr on
JLSS 17-0001 : N
.I.C
JLSS 17-0001 : N.I.C.
JLSS 17-0024 : AREA OF WORK
JL
SS
-0
4 :
A
RE
A
OF
W
OR
K
JL
SS
-0
4 :
A
RE
A
OF
W
OR
K
JLSS 17-0001 : N.I.C.
JLSS 17-0001 : N
.I.C
JLSS 17-0024 : AREA OF WORK
JLSS 17-0024 : A
REA OF WORK
0 8' 16' 32'
SCALE: 1/16"=1'-0" (IN FEET)
AutoCAD SHX Text
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S T A R T
AutoCAD SHX Text
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
BUSINESS INTERSTATE 376
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
AIRLIFT AVE
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN ST
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
MILLER ST
AutoCAD SHX Text
AVE
AutoCAD SHX Text
DEFENSE AVE
AutoCAD SHX Text
SERGEANTS WAY
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
ST
AutoCAD SHX Text
HERMAN
AutoCAD SHX Text
ST
AutoCAD SHX Text
CARTER ST
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
DEFENSE
AutoCAD SHX Text
ALPHA ST
AutoCAD SHX Text
ROCKY LANE
AutoCAD SHX Text
SABRE ST
AutoCAD SHX Text
PARKING AREA
AutoCAD SHX Text
FUTURE VEHICLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text water tower
AutoCAD SHX Text
AutoCAD SHX Text airport
AutoCAD SHX Text hangar
AutoCAD SHX Text existing
AutoCAD SHX Text
PHE
AutoCAD SHX Text
TNK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
B-201
GEOTECHNICAL SOIL BORE LOGS
GENERAL SHEET NOTES
1. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH
THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
2. REFER TO SHEET B-101 FOR SOIL BORING LOCATIONS.
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG.
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 28 AUGUST 2020 REFER TO DWG. SHEET OF .45
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (Bldg. 5522)
SBT/DAC
DAC
SBT
E
A
E
4 5 6
PLATE
GTP 410-038
SABRE R
OAD
M
Q
SS
SS
SS
S S
S S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
1149.60
.2
.6
.4
.6
1149.20
1149.40
1149.60
.8
.20
.4
.8
.2
1149.20
1148.
.8
.6
APPROX. LOCATION OF EX.
AVIATION FUEL LINE (6'
TO 8' DEPTH ±)
EX. AVIATION
FUEL MANHOLES
APPROX. UNDERGROUND
ELECTRICAL FUEL SHUTOFF LINE
APPROX. UNDERGROUND
ELECTRICAL FUEL SHUTOFF LINE
APPROX. EX. WATER LINE
LOCATION (5' DEPTH ±)
EX. DOUBLE GATE
APPROX. EX. COMMUNICATION
LINE LOCATION (2' DEPTH ±)
EX. GUIDERAIL (TYP.)
EX. EDGE OF
CONCRETE (TYP.)
EXISTING
CONCRETE
EX.
ASPHALT
EX.
CONCRETEEX. CONCRETE
EX. CONCRETE JERSEY BARRIERS
EX. FENCE
ABANDONED CONDUIT
APPROX. ELECTRICAL
FUEL SHUTOFF LINE
EX. UNKNOWN
UTILITY
EX. FUEL
SHUTOFF BOX
EX. PAINTED LINE
EX. PAINTED LINE
EX.
ASPHALT
APPROX. STORM SEWER
LOCATION (4' DEPTH)
APPROX. LOCATION
OF APRON
EX. TEMP. FENCE
EX. TEMP. FENCE
EX. LIGHT AND BASE
EX.
CONCRETE
APPROX.
UNDERGROUND
ELECTRICAL LINE
AND MANHOLE
ELECTRICAL MANHOLE
EX. FUEL
SHUTOFF BOX
EX. CATCH BASIN (SD77)
RIM: 1148.10'
INV. OUT: 8"W 1146.48' (PVC)
APPROX. EX.
COMMUNICATION
LINE (4.5' DEPTH)
EX. PARKING LOT
MARKINGS (TYP)
EX.
ASPHALT
EX. COMM.
MANHOLE
APPROX. EX. COMM.
LINE (4.5' DEPTH)
EX. TEMP. FENCE
TO BE REMOVED
EX. SIDEWALK
EX. 1" WATER LINE
(TYP.) (APPROX.)
EX. SANITARY SEWER AND
MANHOLE (TYP.) (APPROX.)
EX. GRAVEL
DRIVE
SURVEY AND
TOPOGRAPHIC DATA NOT
RECORDED IN THIS AREA.
ALL ELEVATIONS AND
SITE FEATURES SHALL BE
VERIFIED BY CONTRACTOR
AND COORDINATED WITH
CONTRACTING OFFICER.
EX. 8" WATER LINE (TYP.)
EX. STORM
SEWER(TYP.)
EX. VEGETATION
EX. VEGETATION
EX. VEGETATION
EX. VEGETATION
EX. CONC.
EX.
APRON
EX. CATCH BASIN (SD76)
RIM: 1146.79'
INV. OUT:
12" SE 1142.88'
15" S 1141.53' 8" E 1143.75'
18"NE 1141.12'
15" E 1141.79'
EX. CATCH BASIN (SD75)
RIM: 1146.01'
INV. OUT: 12" NW 1143.36'
EX. CATCH BASIN (SD77)
RIM: 1148.10'
INV. OUT: 8"W 1146.48' (PVC)
EX. FIRE HYDRANT (TYP.)
EXISTING RED LINE
1 2 3 4 5
D
C
B
A
D
C
B
1 2 3
E
A
E
4 5 6
JLSS17-0024
GTP 410-038
EXISTING CONDITIONS PLAN
SHEET LEGEND
EXISTING CONCRETE
EXISTING ASPHALT
SS
EXISTING WATER LINE
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING UNGD. ELEC.
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING BURIED COMM.
EXISTING UNKNOWN UTIL.
EXISTING APRON
EXISTING FENCE
GENERAL NOTES
1. ALL DEED OR PLAN BEARINGS AND COORDINATES HAVE BEEN
ROTATED AND CONVERTED TO NORTH AMERICAN DATUM OF 1983
PENNSYLVANIA STATE PLANE COORDINATE SYSTEM SOUTH ZONE.
2. TOPOGRAPHIC MAPPING IS BASED ON FIELD MEASUREMENTS AND
DATA FROM PASDA (PENNSYLVANIA SPATIAL DATA ACCESS). THE
VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88) AND THE COORDINATE SYSTEM IS NAD83 PENNSYLVANIA
STATE PLANE, SOUTH ZONE, US SURVEY FOOT (PA83-SF).
3. UTILITY NOTE: THE UNDERGROUND UTILITIES SHOWN HAVE BEEN
LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING
DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE
UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN
THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR
FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES
SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES
CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE
FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY
LOCATED THE UNDERGROUND UTILITIES.
4. CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR LOCATION OF ALL
UNDERGROUND UTILITIES. NO DIGGING WILL BE ALLOWED UNTIL THE
CONTRACTOR HAS SECURED A DIGGING PERMIT FROM THE
CONTRACTING OFFICER.
CIVL, LLC
100 SOUTHPOINTE SQ. LN
CANONSBURG, PA 15317
PH: (814) 880-4635
ENGINEERING DESIGN PERMITTING
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG. PLATE
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
28 AUGUST 2020 REFER TO DWG. SHEET OF 45 .
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
JBC
CIVL
JBC
SURVEYOR NOTE:
ONLY ONE OF SIX PROVIDED CONTROL POINTS WAS LOCATED DURING
FIELD SURVEY, AND THE COORDINATES PROVIDED FOR THAT POINT
WERE OFF BY 0.70' HORIZONTALLY AND 0.70' VERTICALLY, THEREFORE
THE CONTROL POINT COULD NOT BE HELD. A NEW CONTROL POINT
WAS ESTABLISHED BY THE SURVEYOR FOR THE PURPOSE OF THE
SURVEY.
V103B
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (BLDG. 5522)
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PA. STATE PLANE S.
AutoCAD SHX Text
1000.25
REVIEW
COORDINATION DATE
REV.
NO. DATE DESCRIPTION BY
ANTI-TERRORISM
SECURITY
SAFETY
FIRE
ENVIRONMENTAL ENG.
BIO ENVIRONMENTAL
COMMUNICATIONS
USING AGENCY
CHIEF CE OPERATIONS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CHIEF ENG. FLIGHT
PROJECT NO: DATE: SCALE:
DRAWING NO.BASE CIVIL ENG. PLATE
(DA/MO/YR)
(DA/MO/YR) (DA/MO/YR)
JLSS 17-0024 24 JULY 2020 REFER TO DWG. SHEET OF .
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000
TUSICK & ASSOCIATES
ARCHITECTS, INC.
123 3RD STREET, BLAWNOX, PA 15238
412-781-8896 / INFO@TUSICKARCHITECTS.COM
JBC
CIVL
JBC
1 2 3 4
D
C
B
A
D
C
B
1 2 3
CONSTRUCT SUPPORT EQUIPMENT
PARKING SHELTER (BLDG. 5522)
E
A
E
4 5 6
GTP 410-038
EROSION AND SEDIMENT CONTROL
NOTES
CIVL, LLC
100 SOUTHPOINTE SQ. LN
CANONSBURG, PA 15317
PH: (814) 880-4635
ENGINEERING DESIGN PERMITTING
5 6
CLEAN FILL
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (PADEP) REGULATIONS STATE THAT THE APPLICANT IS RESPONSIBLE TO PROVIDE CLEAN FILL AND PERFORM ENVIRONMENTAL DUE DILIGENCE. THE
PADEP DEFINITION OF CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE ARE LISTED BELOW.
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED
ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE.)
ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN
ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
102.4(B)(5)(VII) SEQUENCE OF BMP INSTALLATION AND REMOVAL
CRITICAL STAGE BEST MANAGEMENT PRACTICES (PSCM BMPS)
THE CONTRACTOR IS TO CONTACT THE CONTRACTING OFFICER AND ENGINEER OF
RECORD AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF INSTALLATION OF
THE CRITICAL STAGES OF POST CONSTRUCTION STORMWATER MANAGEMENT BEST
MANAGEMENT PRACTICES TO COORDINATE CONSTRUCTION OBSERVATION. REFER
TO NPDES REGULATIONS LISTED IN THE PENNSYLVANIA CODE, TITLE 25, CHAPTER
102, SECTION 102.8(K).
1. UNDERGROUND DETENTION TANK - INSTALLATION OF UNDERGROUND DETENTION
TANK AND OUTLET CONTROL STRUCTURE
DETAILED EROSION CONTROL PLAN AND PHASING
REFER TO THE SITE GRADING PLAN AND THE SOIL EROSION AND SEDIMENTATION
CONTROL PLANS WHICH ARE REFERENCED HEREIN
CONSTRUCTION PHASING
THE WORK CONSISTS OF APPROXIMATELY 0.9 ACRES OF DISTURBED AREA WHICH
CONSISTS OF PAVED DRIVEWAY AND PAVED PAD CONSTRUCTION, INSTALLATION OF
STORM SEWERS, GRADING, EROSION CONTROL SEDIMENT BARRIERS, UTILITY
EXTENSIONS AND ALL OTHER APPURTENANCES NECESSARY. ALL DISTURBED SLOPES
3:1 H:V OR GREATER SHALL BE STABILIZED WITH SEED, MULCH AND SLOPE
STABILIZATION FABRIC. ANY BUILDING MATERIALS ENCOUNTERED DURING
EXCAVATION MUST IMMEDIATELY BE TAKEN TO A PENNSYLVANIA DEPARTMENT OF
ENVIRONMENTAL PROTECTION (PADEP) APPROVED OR PERMITTED LANDFILL.
MATERIAL DISPOSED OF OFFSITE MUST BE TAKEN TO A SITE WITH AN APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN OR A PADEP APPROVED SITE. ALL
EROSION AND SEDIMENTATION CONTROL BMPS THAT ARE INSTALLED MUST BE
COMPLETE AND FUNCTIONING BEFORE THEIR TRIBUTARY AREAS ARE DISTURBED. ALL
AREAS DISTURBED BY BMP MAINTENANCE ACTIVITIES SHALL BE IMMEDIATELY
STABILIZED WITH SEED AND MULCH. IT IS PROPOSED TO PROCEED WITH THE
PROJECT IN THE FOLLOWING SEQUENCE:
1. THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE
ALLEGHENY COUNTY CONSERVATION DISTRICT, MOON TWP., CONTRACTING
OFFICER AND OTHER NECESSARY PARTIES IN ACCORDANCE WITH PADEP
CHAPTER 102 REGULATIONS A MINIMUM OF SEVEN DAYS PRIOR TO THE START
OF EARTH DISTURBANCE ACTIVITIES.
2. SURVEY STAKEOUT FOR THE FOLLOWING:
A. LOCATION OF LIMIT OF DISTURBANCE / PERMIT BOUNDARY
B. LOCATION OF COMPOST FILTER SOCK
3. INSTALL ROCK CONSTRUCTION ENTRANCE
4. INSTALL COMPOST FILTER SOCK: BELOW AREAS OF DISTURBANCE AS SHOWN ON
PLANS
5. CLEAR AND GRUB: CLEAR AND GRUB IN AREA OF EARTHWORK ACTIVITIES. ALL
DEBRIS TO BE REMOVED IN APPROVED MANNER.
6. TOPSOIL: STRIP TOPSOIL AS REQUIRED FOR THE SITE AND STOCKPILE IN AREAS
WITH FILTER FABRIC FENCE SURROUNDING. WHEN TOPSOIL REMOVAL IS
COMPLETED, IMMEDIATELY SEED STOCKPILE PER TEMPORARY SEEDING
SPECIFICATIONS. TOPSOIL STOCKPILE HEIGHTS MUST NOT EXCEED THIRTY FIVE
FEET AND SHALL BE 2H:1V OR FLATTER.
7. COMMENCE GRADING ACTIVITIES: COMPLETE GRADING AS NECESSARY FOR SITE
CONSTRUCTION. ENSURE THAT ALL EARTH DISTURBANCE ACTIVITIES ARE
CONTAINED WITHIN THE PERIMETER OF ESTABLISHED EROSION CONTROLS.
MINIMIZE THE EXTENT AND DURATION OF EARTH DISTURBANCE WHEREVER
POSSIBLE THROUGH STRATEGIC PHASING OF ACTIVITIES. PROTECT EXISTING
VEGETATION WHERE DISTURBANCE IS NOT NECESSARY. DO NOT COMPACT SOIL
IN AREAS WHERE NO DISTURBANCE IS PLANNED AND IN AREAS WHERE
VEGETATIVE STABILIZATION IS PLANNED. NO MORE THAN 15,000 SQUARE FEET OF
DISTURBED AREA SHALL REACH FINAL GRADE BEFORE INITIATING SEEDING,
MULCHING, AND/OR BLANKETING OPERATIONS. DURING GRADING ACTIVITIES,
INSTALL ALL STORM SEWER PIPING IN ACCORDANCE WITH THE FOLLOWING STEP.
8. INSTALL STORMWATER MANAGEMENT SYSTEM: INSTALL STORMWATER INLETS,
AND STORM LINES AS SHOWN ON THE PLAN. INSTALL AS FOLLOWS:
A .WORK CREWS AND EQUIPMENT FOR TRENCHING, PLACEMENT OF PIPE
CONSTRUCTION AND BACKFILLING WILL BE SELF-CONTAINED AND SEPARATE
FROM CLEARING AND GRUBBING THE SITE RESTORATION AND STABILIZATION
OPERATIONS.
B. INSTALL STORM SEWERS FROM DOWNSTREAM TO UPSTREAM AS GRADING
OCCURS. INSTALL SILT SACKS IN ALL PROPOSED INLETS.
C. AFTER STABILIZATION OF ALL TRIBUTARY DRAINAGE AREAS, INSTALL
STORMWATER MANAGEMENT FACILITIES FROM DOWNSTREAM TO UPSTREAM,
STARTING WITH THE UNDERGROUND DETENTION TANK. FOR EACH FACILITY
(TANK), BEGIN WITH CONSTRUCTION OF THE OUTLET STRUCTURES AND PIPES
DURING GRADING, THEN STABILIZE.
D. LIMIT DAILY TRENCH EXCAVATION TO THE LENGTH OF PIPE PLACEMENT,
INSTALLATION, AND BACKFILLING THAT CAN BE COMPLETED THE SAME DAY.
E. WATER THAT ACCUMULATES IN ANY OPEN TRENCH WILL BE COMPLETELY
REMOVED BY PUMPING, BEFORE PIPE PLACEMENT AND/OR BACKFILLING
BEGINS, TO A PUMPED WATER FILTER BAG. TRENCH PLUGS, AS SHOWN IN THE
DETAILS, ARE TO BE INSTALLED PER PADEP CHAPTER 102 REQUIREMENTS. ON
THE DAY FOLLOWING THE PIPE PLACEMENT AND TRENCH BACKFILLING, THE
DISTURBED AREA WILL BE GRADED TO FINAL SUBGRADE AND SEEDED AND
MULCHED OR STABILIZED PER THE PERMANENT SEEDING SCHEDULE.
9. INSTALL ALL UTILITY LINES (WATER, ELECTRIC, CABLE/INTERNET/PHONE):
UTILITIES SUCH AS PIPELINES WITH JOINTS THAT ALLOW A MANUFACTURED
LENGTH OF PIPE TO BE PLACED IN THE TRENCH WITH THE PIPE JOINT
ASSEMBLED/MADE IN THE TRENCH REQUIRE AN OPEN PIPELINE TRENCH THAT IS
ONLY SLIGHTLY LONGER THAN THE LENGTH OF PIPE BEING INSTALLED. THE
TOTAL LENGTH OF EXCAVATED TRENCH OPEN AT ANY ONE TIME SHOULD NOT BE
GREATER THAN THE TOTAL LENGTH OF PIPELINE/UTILITY LINE THAT CAN BE
PLACED IN THE TRENCH AND BACK-FILLED IN ONE WORKING DAY. PLACE
EXCAVATED MATERIAL ON THE UPSLOPE SIDE OF THE TRENCH. ANY
ACCUMULATED WATER SHALL BE REMOVED BY PUMPING THROUGH A PUMPED
WATER FILTER BAG. ON THE DAY FOLLOWING THE PIPE PLACEMENT AND
TRENCH BACKFILLING, THE DISTURBED AREA WILL BE GRADED TO FINAL
SUBGRADE AND SEEDED AND MULCHED, STABILIZED PER THE PERMANENT
SEEDING SCHEDULE, OR PAVED.
10.STABILIZE: APPLY PERMANENT STABILIZATION TO ANY REMAINING DISTURBED
AREAS. STABILIZE PROPOSED PAVED AREAS WITH STONE BASE.
11.RESEED: RESEED ANY DISTURBED AREAS THAT HAVE NOT ACHIEVED A UNIFORM
70% PERENNIAL VEGETATIVE COVER AFTER 30 DAYS.
PCSM CONSTRUCTION SEQUENCE
CONTRACTOR MUST CONTACT THE CONTRACTING OFFICER AND ENGINEER ON RECORD
FORTY -EIGHT (48) HOURS PRIOR TO THE COMMENCEMENT OF THE FOLLOWING STEP TO
COORDINATE CONSTRUCTION OBSERVATION OF THE PCSM BMPS.
1. IMPLEMENT PCSM PLAN: ONCE SITE HAS ACHIEVED A UNIFORM 70% PERENNIAL
VEGETATIVE COVER.
a. INSTALL STORM SEWERS FROM DOWNSTREAM TO UPSTREAM AS
GRADING OCCURS. INSTALL SILT SACKS IN ALL PROPOSED INLETS.
b. AFTER STABILIZATION OF ALL TRIBUTARY DRAINAGE AREAS, INSTALL
STORMWATER MANAGEMENT FACILITIES FROM DOWNSTREAM TO
UPSTREAM, STARTING WITH THE UNDERGROUND DETENTION TANK. FOR
EACH FACILITY (TANK), BEGIN WITH CONSTRUCTION OF THE OUTLET
STRUCTURES AND PIPES DURING GRADING, THEN STABILIZE.
2. ONCE UTILITY CONSTRUCTION IS COMPLETED, TESTED AND OPERATING, PLACE
PAVEMENT SUBBASE FOR THE PROPOSED PAD AND ROAD. REMOVE SILT SACKS
IN AREAS TO BE PAVED. PAVE ROADWAY AND PAD. REPLACE SILT SACKS IN
INLETS AFTER PAVING IS COMPLETED.
3. REMOVE ROCK CONSTRUCTION ENTRANCE AND SEED AND MULCH THE
DISTURBED AREAS.
4. APPLY PERMANENT STABILIZATION TO ANY REMAINING DISTURBED AREAS.
5. FINAL PHASE: WHEN CONSTRUCTION IS COMPLETE, AND ALL GROUND COVER IS
ESTABLISHED (GAUGED BY SEVENTY PERCENT (70%) PERENNIAL VEGETATIVE
COVERAGE IN VEGETATED AREAS) REMOVE THE REMAINING TEMPORARY
EROSION AND SEDIMENT CONTROLS.
a. DURING THIS REMOVAL PROCESS, FERTILIZE, SEED, AND MULCH
DISTURBED AREAS PER PERMANENT SEEDING SPECIFICATIONS.
b. IF VEGETATIVE GROWTH IS NOT ESTABLISHED WITHIN TWENTY (20) DAYS, RESEED IMMEDIATELY.
c. ALL COMPOST FILTER SOCKS, AND/OR SILT SACKS ARE TO BE REMOVED.
DISPOSE OF ANY REMAINING SILT, COMPOST FILTER SOCKS AND SILT
SACKS AS STATED IN THE RECYCLING AND DISPOSAL OF MATERIALS
SECTION OF THIS REPORT. SEED AND MULCH ALL REMAINING
DISTURBED AREAS.
d. SEED AND MULCH ANY REMAINING DISTURBED AREAS AFTER ALL OF THE
TEMPORARY EROSION AND SEDIMENT CONTROLS HAVE BEEN REMOVED.
e. INSTALL ANY EROSION BLANKETING ON STEEP SLOPES AS REQUIRED.
102.4(B)(5)(X) MAINTENANCE OF CONTROL FACILITIES
MAINTENANCE OF CONTROL FACILITIES
INSPECTION AND MAINTENANCE PROGRAMS WILL BE IMPLEMENTED DURING AND
AFTER CONSTRUCTION TO ASSURE THAT EROSION AND SEDIMENTATION MEASURES
ARE MAINTAINED. ALL EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
INSPECTED WEEKLY AND AFTER EVERY RUNOFF EVENT. INSPECTIONS AND
MAINTENANCE ARE TO BE DOCUMENTED ON THE PADEP VISUAL INSPECTION FORM
3150-FM-BWEW0083 IN ACCORDANCE WITH THE PENNSYLVANIA DEPARTMENT OF
ENVIRONMENTAL PROTECTION AND THE ALLEGHENY COUNTY CONSERVATION
DISTRICT GUIDELINES. REPAIRS AND MAINTENANCE WILL BE PERFORMED BY THE
CONTRACTOR AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE MEASURES AND
FACILITIES. ANY DEFICIENCIES MUST BE CORRECTED BY THE CONTRACTOR WITHIN
24 HOURS UPON IDENTIFICATION OF THE DEFICIENCY. ALL AREAS DISTURBED BY BMP
MAINTENANCE ACTIVITIES SHALL BE IMMEDIATELY STABILIZED WITH SEED AND
MULCH. SPECIFIC MAINTENANCE PROGRAMS FOR EROSION CONTROL BMPS ARE
DESCRIBED BELOW. ALL MAINTENANCE MEASURES ARE THE RESPONSIBILITY OF THE
CONTRACTOR AND OF THE INDIVIDUAL PERMIT HOLDER.
CONSTRUCTION WASTES INCLUDING, BUT NOT LIMITED TO, BUILDING MATERIALS,
CONCRETE WASH WATER, SANITARY WASTES, ETC. THAT COULD ADVERSELY IMPACT
WATER QUALITY MUST BE DISPOSED OF PROPERLY AT AN APPROVED DEP DISPOSAL
SITE. WHENEVER POSSIBLE, RECYCLING OF EXCESS MATERIALS IS PREFERRED
RATHER THAN DISPOSAL.
COMPOST FILTER SOCKS
COMPOST FILTER SOCKS WILL BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF
EVENT AND ANY REQUIRED REPAIRS, SUCH AS REPLACING OR RE-STAKING, WILL BE
MADE WITHIN 24 HOURS. SEDIMENT DEPOSITS WILL BE REMOVED WHEN IT REACHES
1/2 OF THE HEIGHT OF THE FILTER SOCK.
INLET PROTECTION
SILT SACKS SHALL BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF EVENT AND
CLEANED WHEN THEY REACH ½ OF THEIR CAPACITY UNLESS MORE FREQUENT
MAINTENANCE IS REQUIRED BY THE MANUFACTURER. ANY REPAIR WILL BE MADE
WITHIN 24 HOURS.
ROCK CONSTRUCTION ENTRANCE
ROCK CONSTRUCTION ENTRANCE THICKNESS WILL BE CONSTANTLY MAINTAINED TO
THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE OF ROCK MATERIALS
WILL BE MAINTAINED ON THE SITE FOR THIS PURPOSE. DRAIN SPACE UNDER WASH
RACK SHALL BE KEPT OPEN AT ALL TIMES. DAMAGE TO THE WASH RACK SHALL BE
REPAIRED PRIOR TO FURTHER USE OF THE RACK. ALL SEDIMENT DEPOSITED ON
ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE
IMMEDIATELY. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY
DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
THE COMPOST SOCK SEDIMENT TRAP SHALL BE INSPECTED WEEKLY AND AFTER EACH
RUNOFF EVENT. SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/3 THE HEIGHT OF
THE SOCKS. ANY REPAIRS WILL BE MADE WITHIN 24 HOURS.
FILTER BAG
THE PURPOSE OF A FILTER BAG IS TO REMOVE SEDIMENT FROM RUNOFF OR
GROUNDWATER WHICH IS PUMPED FROM THE WORK AREA. THE BAG MUST BE
LOCATED IN AN AREA THAT IS WELL-VEGETATED AND HAS A LAND SLOPE OF LESS
THAN FIVE PERCENT (5%) OR ON A BED OF AASHTO NO. 57 STONE. THE FILTER BAG
SHALL BE CONSTRUCTED OF NON-WOVEN GEOTEXTILE. THE BAG MUST TRAP
PARTICLES LARGER THAN 150 MICRONS. THE PUMPING RATE SHOULD NOT EXCEED
1/2 OF THE MAXIMUM RECOMMENDED BY THE BAG MANUFACTURER. FILTER BAGS
MUST DISCHARGE INTO STABLE, EROSION RESISTANT AREAS. THE FILTER BAG
SHOULD BE INSPECTED DAILY AND AFTER EACH PRECIPITATION EVENT. ANY
REQUIRED REPAIRS, SUCH AS REPLACING OF THE FILTER BAG, WILL BE MADE WITHIN
24 HOURS OF RECOGNITION OF THE FAILURE. THE FILTER BAG AND TRAPPED
SEDIMENT SHALL BE DISPOSED OF OFF-SITE WHEN THE BAG IS 1/2 FULL AT A DUMP
SITE APPROVED BY THE ALLEGHENY COUNTY CONSERVATION DISTRICT.
VEGETATION
INSPECT ALL SEEDED AREAS WEEKLY AND AFTER EVERY RUNOFF EVENT. RESEED
ALL AREAS THAT VEGETATION HAS FAILED TO ESTABLISH. REPAIR ALL ERODED
SLOPES, SEED AND MULCH AS NECESSARY.
DISTURBED AREAS
AS SOON AS SLOPES, CHANNELS, DITCHES AND OTHER DISTURBED AREAS REACH
FINAL GRADE THEY MUST BE PERMANENTLY STABILIZED. TEMPORARY STABILIZATION
SHALL BE ESTABLISHED IN ANY AREAS WHERE CONSTRUCTION ACTIVITIES HAVE
CEASED FOR FOUR (4) DAYS OR MORE AND WHERE CONSTRUCTION ACTIVITIES WILL
NOT RESUME WITHIN FOUR (4) DAYS. A PERMANENT COVER SHALL BE INSTALLED IN
ANY AREA WHERE CONSTRUCTION IS TO BE HALTED FOR MORE THAN ONE YEAR. NO
MORE THAN 15,000 SQUARE FEET OF DISTURBED AREA SHALL REACH FINAL GRADE
BEFORE INITIATING STABILIZATION OPERATIONS. ALL DISTURBED SLOPES 3:1 H:V OR
GREATER SHALL BE STABILIZED WITH SEED, MULCH, AND SLOPE STABILIZATION
FABRIC.
SEDIMENT DISPOSAL
ALL SEDIMENT TAKEN FROM THE EROSION CONTROL FACILITIES WILL BE SPREAD AND
DRIED FOR USE IN ONSITE GRADING OR DISPOSAL OFF SITE. UNSUITABLE MATERIAL
SHALL BE HAULED FROM THE SITE FOR PROPER DISPOSAL. AS CONSTRUCTION IS
COMPLETED, VEGETATION ESTABLISHED AND STABILIZATION MEASURES FINISHED,
TEMPORARY EROSION CONTROL FACILITIES WILL BE REMOVED.
PERMANENT CONTROL MEASURES WILL INCLUDE, BUT ARE NOT LIMITED TO:
PERMANENT SEEDING AND LANDSCAPING. THESE FACILITIES WILL BE IMPLEMENTED
AND MAINTAINED AS CONSTRUCTION IS COMPLETED.
SEEDING AND MULCHING MATERIALS
a) TEMPORARY VEGETATIVE COVER. FROM FEBRUARY 15 TO MAY 15 AND AUGUST
15 TO OCTOBER 1, APPLY AVENGER TALL FESCUE, HOMERUN PERENNIAL
RYEGRASS, GRANDSLAM PERENNIAL RYEGRASS, AND CORSAIR KENTUCKY
BLUEGRASS AT THE RATE OF 261 POUNDS PER ACRE (6 POUNDS PER SQUARE
FOOT) BY BROADCASTING, DRILLING, OR HYDRAULIC APPLICATION FOLLOWED BY
NORTH AMERICAN GREEN S75BN (OR EQUIVALENT) ROLLED EROSION CONTROL
BLANKET (INSTALLED AND ANCHORED PER MANUFACTURER
RECOMMENDATIONS).
IN THE ABSENCE OF A SOIL TEST, LIME SHOULD BE APPLIED AT THE RATE OF 1
TON PER ACRE, AND FERTILIZER SHOULD BE APPLIED AT THE RATE OF 50 POUNDS
OF NITROGEN, 50 POUNDS OF P2O5 AND 10 POUNDS OF K2O PER ACRE (E.G. 500
POUNDS OF 10-10-10 PER ACRE).
b) PERMANENT VEGETATIVE COVER. SMOOTH AND FIRM SEEDBED WITH
CULTIPACKER OR OTHER SIMILAR EQUIPMENT PRIOR TO SEEDING. FROM
FEBRUARY 15 TO MAY 15 AND AUGUST 15 TO OCTOBER 1, APPLY AVENGER TALL
FESCUE, HOMERUN PERENNIAL RYEGRASS, GRANDSLAM PERENNIAL RYEGRASS,
AND CORSAIR KENTUCKY BLUEGRASS AT THE RATE OF 261 POUNDS PER ACRE (6
POUNDS PER SQUARE FOOT) BY BROADCASTING, DRILLING, OR HYDRAULIC
APPLICATION FOLLOWED BY NORTH AMERICAN GREEN S75BN (OR EQUIVALENT)
ROLLED EROSION CONTROL BLANKET (INSTALLED AND ANCHORED PER
MANUFACTURER RECOMMENDATIONS).
SEED AND SOIL SUPPLEMENTS (EXCEPT LIME) SHALL CONFORM TO THE
REQUIREMENTS OF FORMULAS D AND E IN SECTION 804 OF THE PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION FORM 408 (APPENDED). LIMING SHALL
CONFORM TO THE REQUIREMENTS LISTED ON PAGE 5.40 OF THE EROSION AND
SEDIMENTATION POLLUTION CONTROL PROGRAM MANUAL (APPENDED).
MULCH SHALL CONFORM TO THE REQUIREMENTS OF SECTION 805 OF THE
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION FORM 408.
IN THE ABSENCE OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .