00- Wood BAFO Pricing.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Master Agreement AZ|CTR060482
Contract number
CTR060482
Issued by
Arizona

About this file

This document is a Best and Final Offer (BAFO) pricing sheet for a Multimodal Transportation Planning On-Call contract, identified by the reference number BPM004111. The spreadsheet appears to be a detailed pricing breakdown for a professional services contract, likely involving a state or local government transportation agency, though the specific jurisdiction is not explicitly named in the provided document.

The pricing sheet outlines rates for 11 different professional roles, ranging from Administrative/Financial Support to Technical Expert, with estimated hours and negotiated unit prices. The total estimated contract value is $6,246,775.40, with a proposed reduced price of $5,942,906.06, representing potential savings of $303,869.34. Rates are quoted as not-to-exceed, fully burdened hourly rates, with the understanding that project-specific quotes will be competitively priced within these maximum rates. The contract appears to be structured as a time-and-materials or fixed-price contract, with project budgets to be negotiated on a task-by-task basis, and reimbursement for other direct costs and travel at actual rates per state accounting principles.

View the file

Other files

File Type Posted
00- BAFO_Wood_Response.pdf PDF
ACCEPTED CTR060482 GL,AL,WC 05.01.24-05.01.25.pdf PDF
ACCEPTED CTR060482 GL,AL,WC 05.01.25-05.01.26.pdf PDF
ACCEPTED CTR060482 PROF LIAB 11.01.24-10.31.25.pdf PDF
APPROVED ANY_ALL GL, AL, WC 07.01.21 - 07.01.22.pdf PDF
APP_Workflow_WSP.docx DOCX document
CTR060482 APPROVED 07.01.22-07.01.23.pdf PDF
CTR060482 WSP USA E&I Inc Q4-2024 Usage Report.xlsx XLSX spreadsheet
Q2-2022-USEAGE-REPORT-WOOD.xlsx XLSX spreadsheet
ACCEPTED CTR060482 PROFESSIONAL LIAB 11.01.23-10.31.24 .pdf PDF
CTR060482_Contract_Amendment_Summary_One__1_.pdf PDF
CTR060482_Contract_Amendment_Summary_Two__2_.pdf PDF
CTR060482_Pricing.xlsx XLSX spreadsheet
WSP USA E&I Inc_Q2 23 Usage Report (1).xlsx XLSX spreadsheet
WSP_USA E&I,Inc_Q4 Usage Report (1).xlsx XLSX spreadsheet
ACCEPTED CTR060482 GL, AL, WC 05.01.23 - 05.01.24.pdf PDF
ADOT_Procurement_Letter_2022-12-01__2_.pdf PDF
CTR060482 Post Award Sign in.docx DOCX document
CTR060482 WSP USA E&I Inc Q1-2025 Usage Report.xlsx XLSX spreadsheet
CTR060482 WSP USA E&I Inc_Q3-2024 Usage Report.xlsx XLSX spreadsheet
CTR060482_SPO_205_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
WSP Environmental USA Q1 2024 Usage Report - Task Order.xlsx XLSX spreadsheet
CTR060482 WSP USA E&I Inc Q2-2025 Usage Report.xlsx XLSX spreadsheet
CTR060482_Contract_Amendment_Summary_Three__3_.pdf PDF
WSP USA E&I Inc_Q2-2024 Usage Report.xlsx XLSX spreadsheet
WSP USA E&I Inc_Q3 23 Usage Report (1).xlsx XLSX spreadsheet
WSP USA E&I Inc_Q4 23 Usage Report (1).xlsx XLSX spreadsheet
Wood Initial Proposal.zip ZIP file
Wood_PLc_Usage Report -Q3 22.xlsx XLSX spreadsheet
q1 23 Usage Report - WSP (1).xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BPM004111 Multimodal Transportation Planning On-Call Pricing Sheet
Revised Negotiated Pricing
Discipline OneDiscipline TwoDiscipline ThreeDiscipline FourDiscipline FiveDiscipline SixDiscipline SevenDiscipline Eight
Contract RoleSUM of No of Estimated HoursUnit PriceExtended PriceOrifinal Unit PriceProposed Unit PriceOriginal PriceProposed PricePotential SavingsOrifinal Unit PriceProposed Unit PriceOriginal PriceProposed PricePotential SavingsUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended Price
ADMINISTRATIVE/FINANCIAL SUPPORT655$0.00$90.00$86.00$58,950.00$56,330.00$2,620.00$90.00$86.00$58,950.00$56,330.00$2,620.00$0.00$0.00$0.00$0.00$90.00$58,950.00
ANALYST4,651.00$0.00$115.00$110.00$534,865.00$511,610.00$23,255.00$115.00$110.00$534,865.00$511,610.00$23,255.00$0.00$0.00$0.00$0.00$115.00$534,865.00
CONSULTANT5,831.86$0.00$190.00$181.00$1,108,053.40$1,055,566.66$52,486.74$190.00$181.00$1,108,053.40$1,055,566.66$52,486.74$0.00$0.00$0.00$0.00$190.00$1,108,053.40
DEVELOPER505$0.00$210.00$200.00$106,050.00$101,000.00$5,050.00$210.00$200.00$106,050.00$101,000.00$5,050.00$0.00$0.00$0.00$0.00$210.00$106,050.00
ENGINEER2,746.00$0.00$160.00$152.00$439,360.00$417,392.00$21,968.00$160.00$152.00$439,360.00$417,392.00$21,968.00$0.00$0.00$0.00$0.00$160.00$439,360.00
GEOGRAPHIC INFORMATION SYSTEMS (GIS)5,804.00$0.00$165.00$157.00$957,660.00$911,228.00$46,432.00$165.00$157.00$957,660.00$911,228.00$46,432.00$0.00$0.00$0.00$0.00$165.00$957,660.00
GRAPHIC DESIGNER137$0.00$125.00$119.00$17,125.00$16,303.00$822.00$125.00$119.00$17,125.00$16,303.00$822.00$0.00$0.00$0.00$0.00$125.00$17,125.00
PLANNER5,332.12$0.00$200.00$190.00$1,066,424.00$1,013,102.80$53,321.20$200.00$190.00$1,066,424.00$1,013,102.80$53,321.20$0.00$0.00$0.00$0.00$200.00$1,066,424.00
PRINCIPAL1,346.50$0.00$220.00$209.00$296,230.00$281,418.50$14,811.50$220.00$209.00$296,230.00$281,418.50$14,811.50$0.00$0.00$0.00$0.00$220.00$296,230.00
PROJECT MANAGER6,810.29$0.00$200.00$190.00$1,362,058.00$1,293,955.10$68,102.90$200.00$190.00$1,362,058.00$1,293,955.10$68,102.90$0.00$0.00$0.00$0.00$200.00$1,362,058.00
TECHNICAL EXPERT1,500.00$0.00$200.00$190.00$300,000.00$285,000.00$15,000.00$200.00$190.00$300,000.00$285,000.00$15,000.00$0.00$0.00$0.00$0.00$200.00$300,000.00
Total$0.00$6,246,775.40$5,942,906.06$303,869.34$6,246,775.40$5,934,436.63$303,869.34$0.00$0.00$0.00$0.00$6,246,775.40
Rates quoted shall be not-to-exceed, fully burdened rates, and shall reflect the highest rate for any level of position for the role. The hours reflected in this table is based on an estimate only and does not represent any guarantee of work or projects. Pricing per hour will be used as not-to-exceed rates by the contractor in completing a specific project budget / quote. Project budgets shall be quoted with competitve rates relevant to the level of staff being recommended for perform on a project. For example, if two levels of an "analyst" are required for a particular work project, it would be expected that two different prices would be quoted on that project budget, and the highest could not exceed the awarded rate for that role. Though it is possible to award a time-and-materials contract in special circumstances permissible under federal funding, the contractor should not expect such an award for a project. Instead, the contractor's budget / quote will be normally be awarded as a not-to-exceed price established for the project, or as a fixed price by deliverable or task; except that other direct costs and travel must be reimbursed at actual per State Accounting Principles. The method of award will be identified in the task assignment / request for project quote document that explains a specific scope of work. All project-level quote shall be subject to negotiation.

Sheet2

Sheet3 image1.jpeg

File details come from the government source that posted it. Updated .