N Riverside Bldg 4 Concrete Work-DM
Active Release Competitive Sealed Bidding Illinois Awarded
- Contract number
- 25-416CMS-BOPM4-P-78767 Release 8
- Awardee
- Design Developers & Rehub INC
- Contracting organization
- ARNG Facilities
- Contract amount
- $20,480
Award facts
- Completion date
Award details come from bidbuy.illinois.gov. Updated .
About this award
Design Developers & Rehub INC has been awarded a competitively bid contract by the Army National Guard Facilities organization in Illinois with a total contract value of $20,480.00. The contract period runs from June 19, 2026, through June 18, 2027. The award was issued under Release Competitive Sealed Bidding procurement procedures and encompasses concrete and masonry restoration services at a Region 1 facility.
The scope of work includes demolition and replacement of an interior concrete floor (9 feet by 17 feet) at an entry door location, foundation crack repair, and installation of new 4,000 pounds per square inch (PSI) concrete flooring to match existing conditions. Additional work includes exterior concrete sidewalk demolition and replacement (3 feet by 20 feet) with proper water pitch drainage toward the street, brick removal and reinstallation around an upper window, tuckpointing and sealing, and comprehensive debris removal. Compensation is structured on a time-and-materials basis, including basic hourly labor (96 hours at $128 per hour), foreman hourly labor (32 hours at $135 per hour), and materials provided at cost ($3,872.00), all applicable during the first year Monday through Friday, 8 a.m. to 5 p.m. work schedule.
Line items
| Item | Total |
|---|---|
| Region 1: Group 1-Basic hourly labor rate Mon-Fri 8 am-5 pm FIRST YEAR. Demo: break up concrete floor inside corner by entry door (9ft x 17ft). Repair crack in concrete foundation then pour new concrete floor (4,000PSI) to match existing. Also, outside of entry door break up concrete sidewalk, pitch… | $12,288.00 |
| Region 1: Group 1-Foreman hourly labor rate Mon-Fri 8 am-5 pm FIRST YEAR. Demo: break up concrete floor inside corner by entry door (9ft x 17ft). Repair crack in concrete foundation then pour new concrete floor (4,000PSI) to match existing. Also, outside of entry door break up concrete sidewalk,… | $4,320.00 |
| Region 1: Materials at cost for all years. Materials need to complete work per vendor quote dated May 20, 2026. Region 1: Materials at cost for all years. | $3,872.00 |
Quick answers
Who was awarded contract 25-416CMS-BOPM4-P-78767?
Contract 25-416CMS-BOPM4-P-78767 was awarded to Design Developers & Rehub INC by ARNG Facilities in Illinois on June 19, 2026.
How much is contract 25-416CMS-BOPM4-P-78767 worth?
Its contract amount is $20,480.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award