Cooler Pressure Switch Repair
Active Release Competitive Sealed Bidding Illinois Awarded
- Contract number
- 23-416CMS-BOPM4-P-47274 Release 129
- Awardee
- Triton Testing and Design
- Contracting organization
- Dixon Correctional Center
- Contract amount
- $1,090
Award facts
- Completion date
- UNSPSC codes
- 72101511 Air conditioning installation or maintenance or repair service
- 72151005 Boiler pressure controller installation
- 72154100 Distribution and conditioning system equipment maintenance and repair services
- 72151006 Boiler pressure controller maintenance or repair or operation
- 72151207 Heating and cooling and air conditioning HVAC installation and maintenance service
- 72154102 Heat exchanger maintenance or repair service
- 72154110 Fin fan cooling tower maintenance and repair service
Award details come from bidbuy.illinois.gov. Updated .
About this award
Triton Testing and Design (V00003144) was awarded a competitively bid contract by Dixon Correctional Center in Illinois for equipment repair services valued at $1,090.00. The contract was executed on September 10, 2026, with a completion date of March 2, 2027. The primary deliverable consists of repair services for an Egg Cooler 219 unit, specifically addressing a faulty pressure switch, performed at the Dixon Correctional Center facility in Region 2. Labor services are provided at a basic hourly rate of $145 per hour for work conducted Monday through Friday, 8:00 a.m. to 5:00 p.m., with six units of service billable under this line item.
The contract includes materials support valued at $220 per unit, on a cost-basis for repairs spanning a four-year service period. This materials line item is structured as a single unit cost covering all materials required for ongoing repairs throughout the contract term. The contract structure indicates that Triton Testing and Design will provide both labor and materials necessary to restore the Egg Cooler 219 equipment to operational status and maintain it throughout the performance period ending March 2, 2027.
Line items
| Item | Total |
|---|---|
| Egg Cooler 219 Faulty Pressure Switch Repair; Region 2: Basic hourly labor rate Mon-Fri 8 am-5 pm for the fourth year. Region 2: Basic hourly labor rate Mon-Fri 8 am-5 pm for the fourth year. | $870.00 |
| Region 2: Materials at cost for repair for all 4 years. | $220.00 |
Quick answers
Who was awarded contract 23-416CMS-BOPM4-P-47274?
Contract 23-416CMS-BOPM4-P-47274 was awarded to Triton Testing and Design by Dixon Correctional Center in Illinois on September 10, 2026.
How much is contract 23-416CMS-BOPM4-P-47274 worth?
Its contract amount is $1,090.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award