DOC-DIX CC- Remove and replace underground steamline JF
Ended Release Competitive Sealed Bidding Illinois Awarded
- Contract number
- 23-416CMS-BOPM4-P-47274 Release 83
- Awardee
- Triton Testing and Design
- Contracting organization
- Dixon Correctional Center
- Contract amount
- $104,100
Award facts
- Completion date
- UNSPSC codes
- 72101511 Air conditioning installation or maintenance or repair service
- 72151005 Boiler pressure controller installation
- 72154100 Distribution and conditioning system equipment maintenance and repair services
- 72151006 Boiler pressure controller maintenance or repair or operation
- 72151207 Heating and cooling and air conditioning HVAC installation and maintenance service
- 72154102 Heat exchanger maintenance or repair service
- 72154110 Fin fan cooling tower maintenance and repair service
Award details come from bidbuy.illinois.gov. Updated .
About this award
Triton Testing and Design has been awarded a Release Competitive Sealed Bidding contract by the Dixon Correctional Center in Illinois for infrastructure maintenance services. The contract, identified as 23-416CMS-BOPM4-P-47274, has a total contract value of $104,100.01 and is scheduled for performance from October 30, 2025, to June 30, 2026.
The contract encompasses two primary line items focused on underground steam line infrastructure repair. The first line item involves removing and replacing an underground steam line supplying BC0069, which includes excavation, backfilling, and utility locating, estimated at 200-240 man hours. The second line item specifies the installation of a Thermacor Duo Therm 505 prefabricated insulated steam pipe, approximately 300 linear feet with a 2-inch diameter, including one 90-degree bend and an expansion joint. The work is to be performed during standard business hours (Monday-Friday, 8 am-5 pm) in Region 2, with materials to be supplied at cost for repair purposes.
Line items
| Item | Total |
|---|---|
| Remove and replace underground steam line supplying BC0069. 200-240 man hours to include Excavation and back fill, 6" above steam line. Region 2: Basic hourly labor rate Mon-Fri 8 am-5 pm for the third year. Included is the Excavation and utility locating. Region 2: Basic hourly labor rate Mon-Fri 8… | — |
| Thermacor Duo Therm 505 prefabricated insulated steam pipe, 2" diameter roughly 300' with one 90* and expansion joint. Region 2: Materials at cost for repair for all 4 years. Region 2: Materials at cost for repair for all 4 years. | — |
Quick answers
Who was awarded contract 23-416CMS-BOPM4-P-47274?
Contract 23-416CMS-BOPM4-P-47274 was awarded to Triton Testing and Design by Dixon Correctional Center in Illinois on October 30, 2025.
How much is contract 23-416CMS-BOPM4-P-47274 worth?
Its contract amount is $104,100.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award