NAVFAC northwest 8(a) MACC

Ended Awarded Last action

Contract number
N4425523D1608
Awardee
Awarding agency
Task orders
14 $38,037,624 obligated

Award facts

Opportunity
Combined order value
$38,037,624 Current and potential, with all options
Last date to order 100% complete
IDV ceiling 7% used
$510,000,000.00
Maximum order
$10,000,000.00
Award type
Multiple award
Who can order
Only the awarding agency
Set-aside
Competitive 8(a)
Competition
Full and Open Competition after exclusion of sources · 22 offers Two Step
Pricing
Firm Fixed Price
Legislative mandates

Award details come from SAM.gov/FPDS.

About this IDV

Naval Facilities Engineering Command Northwest awarded a Competitive 8(a) Multiple Award Construction Contract (MACC) to Chugach Solutions Enterprise, LLC, an Alaska Native Corporation-owned small disadvantaged business, on July 28, 2023, with a ceiling value of $510 million and an ultimate completion date of July 27, 2026. This indefinite delivery, indefinite quantity contract was solicited as a competitive 8(a) set-aside for six to eight awards under NAICS code 236220 (Construction of Commercial and Institutional Buildings) with a size standard of $39.5 million. The contract vehicle is designed to procure new construction, renovation, alteration, demolition, and repair work across the Naval Facilities Engineering Command Northwest area of responsibility spanning eleven states. Individual delivery orders under this regional MACC are anticipated to range from $100,000 to $10 million for administrative facilities, housing, childcare centers, warehouses, and other commercial and institutional buildings. Chugach Solutions Enterprise holds SBA 8(a) program certification through January 6, 2030, and frequently engages specialized subcontractors to execute complex projects.

Task orders issued under this vehicle demonstrate the breadth of construction and facilities support services delivered, including design-build military working dog kennel facilities ($7.43 million), blast door refurbishment projects ($5.22 million), electric vehicle charging facility infrastructure ($13.08 million), building envelope replacement and structural repairs ($1.60 million), clean room facility construction ($2.22 million), mechanical systems installation and replacement ($2.26 million), fire suppression system replacements ($665,641), roof covering replacements ($741,311), lift station replacement ($1.20 million), and miscellaneous infrastructure repairs and replacements at various Naval Base Kitsap, Puget Sound Naval Shipyard, and other Pacific Northwest naval installation locations. Performance locations have primarily been in Washington State (Silverdale, Bremerton, and Keyport) and Alaska (Kodiak), with completion dates ranging from 2024 through 2026. All task orders have been structured as firm fixed-price delivery orders, with the majority awarded without additional set-aside restrictions, allowing Chugach Solutions Enterprise to compete on the broader MACC vehicle available to certified 8(a) program participants.

Task orders

Task order Ordering agency Obligated Awarded
DB construct O2 clean room, B7000, TRF bangor-providing a clean room facility within existing building footprint of… N4425525F0237 Naval Facilities Engineering Command (Navy) $2,216,715
This design-build contract encompasses the complete replacement of three (3) crowded steel bullnoses at the… N4425525F0242 Naval Facilities Engineering Command (Navy) $721,961
This project is to add local, manual steam pressure reducing control stations at the main carrier docking piers, pier d… N4425525F0180 Naval Facilities Engineering Command (Navy) $2,262,912
Replace building envelope for various buildings, kodiak AK N4425525F0123 Naval Facilities Engineering Command (Navy) $1,595,404
Remove corrugated cement asbestos board roofing system, ventilation, fascia, damaged structural members. Replace with… N4425525F0116 Naval Facilities Engineering Command (Navy) $654,302
This construction project shall be a design build contract to include the discharge culvert stop log requirement for… N4425525F0093 Naval Facilities Engineering Command (Navy) $1,173,004
Relocate radar site psns N4425525F4026 Naval Facilities Engineering Command (Navy) $896,266
Evcf electric vehicle charging facilities, various locations, NAVFAC NW AOR N4425524F4346 Naval Facilities Engineering Command (Navy) $13,046,564
Replace roof coverings at coastal riverine B4070 N4425524F4398 Naval Facilities Engineering Command (Navy) $741,311
Design-build refurbish lapsc blast doors, B6500, swfpac N4425524F4317 Naval Facilities Engineering Command (Navy) $5,217,614
Design-build replace fire suppression system B1049, NUWC NBK-keyport N4425524F4266 Naval Facilities Engineering Command (Navy) $665,641
Firm-fixed-price for all labor, materials, equipment, and associated costs for a design-build project to replace lift… N4425524F4242 Naval Facilities Engineering Command (Navy) $1,196,477
P850U design-build construction of military working DOG kennel, NBK bangor, silverdale, WA N4425524F4083 Naval Facilities Engineering Command (Navy) $7,644,452
Minimum guarantee - chugach solutions enterprise N4425523F4406 Naval Facilities Engineering Command (Navy) $5,000
Show all 14

Transactions

Action Obligated Date
Supplemental Agreement for work within scope P00009 · 8(a) MACC FY23: chugach-capacity increase $0
Other Administrative Action P00008 · 8(a) MACC FY23: chugach-admin MOD $0
Other Administrative Action P00007 · Annual review $0
Other Administrative Action P00006 · Far clause class deviations $0
Change Order P00005 $0
Other Administrative Action P00004 · NAVFAC northwest 8(a) MACC-annual review. $0
Supplemental Agreement for work within scope P00003 · NAVFAC northwest 8(a) MACC-P00003-no cost administrative modification to add and update clauses. $0
Other Administrative Action P00002 · The purpose of this bilateral modification is to incorporate new provisions of limitations on subcontracting and subcontracting responsibilities and incorporate… $0
Other Administrative Action P00001 · NAVFAC northwest 8(a) MACC. Modification P00001-bid bond corrections. $0
Original award $0

Subawards

Subcontractor Amount Awarded
Chinook Properties, Inc. DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2… $324,900
Warfield Masonry LLC P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Provide and install all masonry. $449,500
Apex Steel, Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Erection of Structural Steel. $197,933
Miller Sheetmetal Inc. DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2… $440,260
Holmes Mechanical, Inc. DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2… $644,965
Jimmy's Contractor Services, Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Provide and install all roofing including all wood edge blocking… $434,741
Subcontractor not on record P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Provide Engineered and Stamped Design Drawings $57,593
Subcontractor not on record P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Foundation steel HSS (Hollow Structural Sections) columns gridlines… $383,105
Holmes Mechanical, Inc. THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B. Install manual steam… $826,713
Art Anderson Associates Inc. DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2… $78,000
Triton Marine Construction Corp. THIS DESIGN-BUILD CONTRACT ENCOMPASSES THE COMPLETE REPLACEMENT OF THREE (3) CROWDED STEEL BULLNOSES AT THE DEWATERING DISCHARGE SYSTEM FOR DRY DOCK 6, BUILDING… $411,975
Dickson Company DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2… $49,422
Ahearn Electric, Inc. DB CONSTRUCT O2 CLEAN ROOM, B7000, TRF BANGOR-PROVIDING A CLEAN ROOM FACILITY WITHIN EXISTING BUILDING FOOTPRINT OF BUILDING 7000 (B7000) TO ACCOMMODATE O2… $73,458
Friend Contractors LLC REPLACE BUILDING ENVELOPE FOR VARIOUS BUILDINGS, KODIAK AK Remove existing building wall and roof panels, windows, doors, insulation, and all applicable… $955,548
LMO Construction, LLC REMOVE CORRUGATED CEMENT ASBESTOS BOARD ROOFING SYSTEM, VENTILATION, FASCIA, DAMAGED STRUCTURAL MEMBERS. REPLACE WITH NEW STEEL ROOF SYSTEM INCLUDING… $159,470
LMO Construction, LLC THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B. Provide all labor, material,… $175,036
Art Anderson Associates Inc. THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B. Prepare design quality… $159,720
Kpff Inc. REPLACE BUILDING ENVELOPE FOR VARIOUS BUILDINGS, KODIAK AK Engineering support. $73,200
Inc. Of Washington Columbia Sheet Metal REMOVE CORRUGATED CEMENT ASBESTOS BOARD ROOFING SYSTEM, VENTILATION, FASCIA, DAMAGED STRUCTURAL MEMBERS. REPLACE WITH NEW STEEL ROOF SYSTEM INCLUDING… $223,130
Dickson Company REMOVE CORRUGATED CEMENT ASBESTOS BOARD ROOFING SYSTEM, VENTILATION, FASCIA, DAMAGED STRUCTURAL MEMBERS. REPLACE WITH NEW STEEL ROOF SYSTEM INCLUDING… $53,263
Viking Fence Company, Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Perform fire protection work $233,724
Triton Marine Construction Corp. THIS CONSTRUCTION PROJECT SHALL BE A DESIGN BUILD CONTRACT TO INCLUDE THE DISCHARGE CULVERT STOP LOG REQUIREMENT FOR MISCELLANEOUS REPAIR TO STOP LOG SEAT DUE… $601,485
LMO Construction, LLC P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Structural Concrete for Military Working Dog Kennel. Mod 2, 10/16/25:… $558,071
Art Anderson Associates Inc. THIS CONSTRUCTION PROJECT SHALL BE A DESIGN BUILD CONTRACT TO INCLUDE THE DISCHARGE CULVERT STOP LOG REQUIREMENT FOR MISCELLANEOUS REPAIR TO STOP LOG SEAT DUE… $78,660
Materials Testing & Consulting, Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Surveying support $85,000
Subcontractor not on record P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Surveying support. $43,955
Holmes Mechanical, Inc. FIRM-FIXED-PRICE FOR ALL LABOR, MATERIALS, EQUIPMENT, AND ASSOCIATED COSTS FOR A DESIGN-BUILD PROJECT TO REPLACE LIFT STATION IN COMPLIANCE WITH UFC 3-240-01… $750,060
Neudorfer Engineers, LLC P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Provide design phase commissioning plan, interim and final… $128,030
Awp, Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Traffic control $87,103
Fox Fire Prevention Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Provide materials, labor, and equipment to install wet and dry fire… $225,594
Tunista Construction LLC P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Construction for military working dog kennel. Obstacle course… $1,081,000
Subcontractor not on record P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Subcontractor shall furnish all labor and material to perform… $35,000
Pacific General Builders LLC REPLACE ROOF COVERINGS AT COASTAL RIVERINE B4070 Install new pan decking to overlap when screwed down with mechanical fasteners. Install new framing, sheetrock,… $126,132
Blue Mountain Electric, Inc. EVCF ELECTRIC VEHICLE CHARGING FACILITIES, VARIOUS LOCATIONS, NAVFAC NW AOR Turnkey installation of electrical vehicle charging facilities to provide power… $4,000,000
West Coast Mechanical Solutions LLC RELOCATE RADAR SITE PSNS Provide labor, equipment and materials to install generator equipment pad & cofferdam, provide 240 volt 100A 1 phase circuit for… $521,212
Pacific General Builders LLC P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Provide materials, labor and equipment to construct the new… $1,010,169
Miller Sheetmetal Inc. ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT COMPLETION DATE Furnish all labor and materials to install all HVAC (Heating Ventilation and Air Conditioning)… $1,371,216
Bronco Electric, Inc. EVCF ELECTRIC VEHICLE CHARGING FACILITIES, VARIOUS LOCATIONS, NAVFAC NW AOR Provide labor, equipment, and materials to install electric vehicle charging… $1,936,473
Long Building Technologies, Inc. FIRM-FIXED-PRICE FOR ALL LABOR, MATERIALS, EQUIPMENT, AND ASSOCIATED COSTS FOR A DESIGN-BUILD PROJECT TO REPLACE LIFT STATION IN COMPLIANCE WITH UFC 3-240-01… $50,916
Sabelhaus West Inc. ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT COMPLETION DATE Mobilize, mask/protect surfaces not to be coated, prime new gypsum walls and ceilings to prepare… $289,034
Wood Harbinger Inc. FIRM-FIXED-PRICE FOR ALL LABOR, MATERIALS, EQUIPMENT, AND ASSOCIATED COSTS FOR A DESIGN-BUILD PROJECT TO REPLACE LIFT STATION IN COMPLIANCE WITH UFC 3-240-01… $47,800
Bronco Electric, Inc. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Military Working Dog Kennel Replacement - Electrical. Mod 3, 5/11/26:… $1,174,132
Fox Fire Prevention Inc. ADMINISTRATIVE MODIFICATION TO CORRECT SHIP TO ADDRESS AND LINE OF ACCOUNTING COST CODE Replace Fire Suppression System at building 1049. $179,897
Bronco Electric, Inc. FIRM-FIXED-PRICE FOR ALL LABOR, MATERIALS, EQUIPMENT, AND ASSOCIATED COSTS FOR A DESIGN-BUILD PROJECT TO REPLACE LIFT STATION IN COMPLIANCE WITH UFC 3-240-01… $139,550
Jimmy's Contractor Services, Inc. REPLACE ROOF COVERINGS AT COASTAL RIVERINE B4070 Provide all labor, material, and equipment to erect exterior scaffolding rooftop access, remove gravel imbedded… $407,438
Ahearn Electric, Inc. ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT COMPLETION DATE Perform electrical/fire alarm work. $88,135
Nelson Engineering CO. MODIFICATION TO INCORPORATE ADMINISTRATIVE CORRECTIONS FOR THE LINES OF ACCOUNTING AND CONTRACT LINE ITEM NUMBERS. Design and Engineering services for… $1,538,346
Green Contracting Co Inc. ADMINISTRATIVE MODIFICATION TO UPDATE THE DD254. Refurbish blast doors in rooms 228, 309, 317, 320, 321 and 322. Replace hinges, modify locking pins, replace… $3,756,773
Nelson Engineering CO. ADMINISTRATIVE MODIFICATION TO UPDATE THE DD254. Provide design and engineering services during construction. $259,700
Nelson Engineering CO. P850U DESIGN-BUILD CONSTRUCTION OF MILITARY WORKING DOG KENNEL, NBK BANGOR, SILVERDALE, WA Engineering services during construction. $97,100
Show 40 more

Latest 50 listed here. See the rest on GovTribe.

Quick answers

Who was awarded contract N4425523D1608?

N4425523D1608 was awarded to Chugach Solutions Enterprise, LLC by Naval Facilities Engineering Command (Department of the Navy) on July 28, 2023.

How much is contract N4425523D1608 worth?

Orders under N4425523D1608 have obligated $38,037,624. N4425523D1608's own ceiling is $510,000,000. A single order can be worth up to $10,000,000.

How many orders have been placed under contract N4425523D1608?

14 orders have been placed under N4425523D1608, the latest on September 17, 2025.

Who can order from contract N4425523D1608?

N4425523D1608 is a multiple award indefinite delivery contract. Only the awarding agency can place orders on it.

Is contract N4425523D1608 part of a contract vehicle?

Yes. N4425523D1608 is part of NAVFAC Northwest 8(a) Small Business MACC Regional Contract.

Was contract N4425523D1608 competed?

The extent of competition for N4425523D1608 was full and open competition after exclusion of sources. The government received 22 offers. It was set aside: Competitive 8(a).

On GovTribe

See this IDV's full record

  • Every order and transaction
  • The awardee's other awards and teaming partners
  • Similar IDVs and recompete opportunities