The recipient will conduct environmental review, and construction activities to replace eleven culverts at four locations and install two new culverts at one location on the rapid city, pierre &…
Active Project Grant Awarded Last action
- Award ID
- 69A36526421310CRSSD
- Recipient
-
State Of South Dakota Department Of Transportation UEI LWAMCP81LP14
- Awarding agency
-
Federal Railroad Administration
Department of Transportation
- Obligated
- $1,098,615
Award facts
- Assistance listing
- 20.338 Consolidated Rail Infrastructure and Safety Improvements Program – Special Transportation Circumstances
- Completion date 38% complete
- Funding
-
- $878,892.00 Federal
- $219,723.00 Non-federal
- Place of performance
- South Dakota, USA
Award details come from USAspending.gov.
About this award
The Federal Railroad Administration awarded the State of South Dakota Department of Transportation $1,098,615 on December 1, 2025, under the Consolidated Rail Infrastructure and Safety Improvements Program – Special Transportation Circumstances (CFDA 20.338) to conduct environmental review and construction activities replacing eleven culverts at four locations and installing two new culverts at one location on the Rapid City, Pierre & Eastern Railroad's 163-mile Pierre-Rapid City subdivision between Fort Pierre and Rapid City, South Dakota. The recipient will also upgrade one timber trestle to 286,000-pound load capacity on the same subdivision. The project objectives are to improve safety, resilience, and service reliability by replacing undersized and aging culverts with hydraulically optimized structures capable of accommodating future stormwater flows from the Bad River and Boxelder Creek basins and strengthening the identified timber trestle. By increasing culvert capacity at five critical locations and upgrading the timber trestle, the project will mitigate flood risk, reduce derailment potential, and ensure uninterrupted rail service for all customers along the corridor. The recipient conducted preliminary engineering and final design activities separately from this grant agreement. Performance occurs in South Dakota with an ultimate completion date of March 31, 2028. Funding is obligated through cooperative agreement as reimbursement upon achievement of project milestones.
Description
The recipient will conduct environmental review, and construction activities to replace eleven culverts at four locations and install two new culverts at one location on the rapid city, pierre & eastern railroad?s (RCP & e) 163-mile pierre?rapid city (PRC) subdivision between fort pierre and rapid city, south dakota. The recipient will also upgrade one timber trestle to 286K capacity on the same subdivision. The recipient conducted preliminary engineering and final design activates separate from this grant agreement, as detailed further in this agreement. The objective of the project is to improve safety, resilience, and service reliability of the PRC subdivision by: replacing undersized and aging culverts with hydraulically optimized structures capable of accommodating future stormwater flows from the bad river and boxelder creek basins; and strengthening the identified timber trestle to a 286,000-pound load capacity.by increasing culvert capacity at these five critical locations and upgrading the timber trestle, the project will mitigate flood risk, reduce the potential for derailments, and ensure uninterrupted rail service for all customers along the corridor.
Quick answers
Who received award 69A36526421310CRSSD?
69A36526421310CRSSD was awarded to State Of South Dakota Department Of Transportation by Federal Railroad Administration (Department of Transportation) on December 1, 2025.
How much is award 69A36526421310CRSSD worth?
$1,098,615 has been obligated on 69A36526421310CRSSD: $878,892 in federal funding and $219,723 in non-federal funding.