- Federal Grant Award Summary The Rail Development Commission Ohio received a $33 million Project Grant from the Federal Railroad Administration (FRA) under the Railroad Crossing Elimination Program (CFDA 20.327), awarded June 1, 2025, with a completion date of January 31, 2036. The grant funds project development, final design, right-of-way acquisition, and construction activities to grade-separate Race Road and close an at-grade crossing at Maddock Road in North Ridgeville, Ohio. Upon...
- This $1,392,826.25 Project Grant award from the U.S. Department of Transportation Federal Railroad Administration (CFDA 20.327 - Railroad Crossing Elimination) will allow Wells County, Indiana to reroute Hoosier Highway near Wells CR 300 S to Adams Street, eliminating three at-grade crossings on the Norfolk Southern rail line. The project will create a north-south corridor connecting State Routes 124 and 218, resulting in continuous vehicular travel flow, reduced delays, and reduced conflict...
- This Project Grant award of $5,595,000 from the Federal Railroad Administration's Consolidated Rail Infrastructure and Safety Improvements (CRISI) program, CFDA 20.325, will fund the Louisville & Indiana Railroad Co.'s "LIRC Safety, Sustainability, and Alternative Energy Project." The key elements of the project include: Replacing 7,200 deteriorating crossties on the Dutch and Columbus Industrial Leads, along with associated track elevations, surfacing, and alignments to ensure...
- The federal Project Grant award by the Federal Railroad Administration (FRA) under the Consolidated Rail Infrastructure and Safety Improvements (CRISI) program (CFDA 20.325) will fully replace the Curtis Creek Bridge and the Ghost Hollow Creek Bridge with steel and concrete structures. The $3,611,769 award to Burlington Junction Railway (BJRY) will bring the bridges to a state of good repair, reduce roadway congestion, decrease diesel fuel consumption by 500,000 gallons annually starting in...
- Federal Grant Award Summary The Rail Development Commission Ohio received a $19.5 million Project Grant from the Federal Railroad Administration (FRA) under the Railroad Crossing Elimination (RCE) Program (CFDA 20.327) awarded on August 1, 2025. The project delivers grade separation infrastructure improvements at the Hines Hill Road at-grade crossing in Hudson, Ohio (Pickaway County), with an anticipated completion date of August 31, 2031. The grade separation project will eliminate a documented...
- Summary of Federal Project Grant Award The Federal Railroad Administration (FRA) awarded $500,000 to the County of Allen on May 1, 2025, under the Railroad Crossing Elimination (RCE) Program (CFDA 20.327) to support the C.R.O.S.S. (Comprehensive Rail Overpass Safety Strategy) Scott Road Project in Fort Wayne, Indiana. The primary deliverables include a feasibility study evaluating the closure of the Scott Road rail crossing, conceptual engineering for both grade-closure and grade-separation...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded $1.25 million to the Michiana Area Council of Governments (MACOG) on May 1, 2025, under the Railroad Crossing Elimination (RCE) Program (CFDA 20.327) for the St. Joseph and Elkhart County, Indiana Rail Corridor Overpass and Improvements Project. This grant funds a comprehensive corridor study to identify and evaluate safety improvements at four highway-rail grade crossings impacted by the Norfolk Southern line...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded Louisville & Indiana Railroad Co a $12,984,000 Project Grant under the Consolidated Rail Infrastructure and Safety Improvements (CRISI) program (CFDA 20.325) effective September 1, 2025, with a completion date of March 31, 2028. The award funds critical repairs to the Clagg Lift Span of the 14th Street Bridge to extend its usable life. The recipient will replace all four bridge assemblies—including sheave,...
- This $5,000,000 Project Grant award from the Federal Railroad Administration's Consolidated Rail Infrastructure and Safety Improvements (CRISI) program will fund the Rio Valley Switching Company (RVSC) to complete final engineering design and construction activities necessary to rehabilitate two of the four rail lines it operates in Texas. The key products and services to be delivered through this funding include: 1) Upgrading approximately 28 miles of the Mission Line from excepted track to FRA...
- Federal Project Grant Award Summary The City of Powder Springs received a $1.0 million Project Grant from the Federal Railroad Administration (FRA) under the Railroad Crossing Elimination program (CFDA 20.327) awarded on May 1, 2025, with a completion date of January 31, 2027. This Track 1 planning proposal, undertaken in partnership with the Georgia Department of Transportation (GDOT) and Norfolk Southern Railway, will deliver conceptual engineering and preliminary environmental assessment...
THE PROJECT WILL FUND THE PRELIMINARY ENGINEERING, GRANT ADMINISTRATIVE SERVICES, FINAL DESIGN, AND CONSTRUCTION TO REPLACE APPROXIMATELY 14 MILES OF 75 LB RAIL WITH 115 LB RAIL. THE PROJECT ALSO INCLUDES REPLACEMENT OF 3 SWITCHES, INSTALLATION OF 4 NEW SWITCHES, RELOCATION OF TWO SWITCHES, REPLACEMENT OF 4 GRADE CROSSINGS, AND INSTALLATION OF RELATED TIES AND BALLAST.THE REPLACEMENT OF THE IDENTIFIED RAIL IN THIS RACE PROJECT WILL ALLOW FOR THE INDUSTRY STANDARD 286,000-POUND FREIGHT CAR TO MOVE SAFELY AND EFFICIENTLY ALONG THE HOOSIER SOUTHERN RAILROAD, REDUCING THE RISK OF DERAILMENT AND RAIL DEFECTS. ACCOMPLISHING THIS PROJECT WILL LEAD TO A REDUCTION IN COSTS FOR THE PERRY COUNTY PORT AUTHORITY AS WELL AS ALLOW THE INDUSTRIES THAT RELY ON THE TRAIN TO REDUCE INPUT COSTS, DUE TO INCREASED TONNAGE PER RAIL CAR, AND THEREFORE THE POTENTIAL TOINCREASE PRODUCTION.THE DELIVERABLES AND TASKS THAT WILL BE ACCOMPLISHED ARE: TASK 1: PROJECT MANAGEMENT - DETAILED PROJECT WORK PLAN, BUDGET, AND SCHEDULE TASK 2: FINAL DESIGN ENGINEERING TASK 3: CONSTRUCTION
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $11.6m | 7/14/25 |