Harvest water will serve up to 50,000 acre-feet per year (AFY) of recycled water produced from the echowater project to approximately 16,000 acres of agricultural and habitat lands in southern…
Ended Cooperative Agreement Awarded
- Award ID
- R23AC00485
- Recipient
-
Sacramento Area Sewer District UEI HMSCE2HG21J5
- Awarding agency
-
Bureau of Reclamation
Department of the Interior
- Obligated
- $469,487,197
Award facts
- Assistance listing
- 15.504 WaterSMART Water Recycling
- Completion date
- Funding
-
- $29,935,300.00 Federal
- $439,551,897.00 Non-federal
- Place of performance
- California, USA
Award details come from USAspending.gov.
About this award
This $469,487,197 Cooperative Agreement awarded by the Department of the Interior Bureau of Reclamation supports the Harvest Water project under the Water Recycling and Desalination Construction Programs (CFDA 15.504). The project will serve up to 50,000 acre-feet per year of recycled water produced from the EchoWater Project to approximately 16,000 acres of agricultural and habitat lands in southern Sacramento County, including portions of unincorporated South Sacramento County and the Stone Lakes National Wildlife Refuge. Key deliverables include environmental documentation and permitting, engineering design services, and construction of a new recycled water transmission and distribution system including a pump station, 14 miles of transmission pipelines, and 25 miles of distribution mains. The project aims to provide two-thirds of the maximum monthly agricultural irrigation demand, with the remaining needs met by existing private wells.
Description
- Activities
- Objective 1: contracts for administrative program managementobjective 2: contracts for environmental documentation and permitting servicesobjective 3: contracts support capital program management servicesobjective 4: contracts to prepare design plans and specificationsobjective 5: construct infrastructuredeliverable(s) expected outcome(s):- administrative program management office administration and support recycled water utility support landowner and stakeholder outreach and education environmental documentation and environmental permitting support groundwater accounting program groundwater monitoring ecological program technical support and oversight capital program coordination and regulatory strategy and advocacy support.- environmental consulting services through september 2026 to prepare project-level ceqa and nepa environmental documentation for program facilities not included in the original 2017 EIR, including associated environmental surveys. The contract also provides environmental permitting services.- engineering services through september 2026 associated with program management, project management, and establishing the basis of design for the programs pump station, 14 miles of transmission pipeline, 25 miles of distribution mains, and on-site connections.- contract for design of harvest water pump station contract for design of ELK grove transmission pipeline and franklin eschinger distribution pipeline projects contract for engineering design services for the harvest water central south distribution pipelines and west distribution pipelines contract for engineering design services for the harvest water on-farm and connections and assemblies.- construction of the program facilities through september 2026.beneficiary: the public
Quick answers
Who received award R23AC00485?
R23AC00485 was awarded to Sacramento Area Sewer District by Bureau of Reclamation (Department of the Interior) on August 11, 2023.
How much is award R23AC00485 worth?
$469,487,197 has been obligated on R23AC00485: $29,935,300 in federal funding and $439,551,897 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award