Purpose of award (summary of the goals and objectives of the project):the goal of this project is to conserve original lime plaster and gypsum finishes in the sacristy and baptistery of mission SAN…

Active Cooperative Agreement Awarded Last action

Award ID
P22AC01243
Recipient
Awarding agency
Obligated
$191,893

Award facts

Completion date 96% complete
Originally
Place of performance
Tumacacori-Carmen, AZ, USA

Award details come from USAspending.gov.

Description

Purpose of award (summary of the goals and objectives of the project):the goal of this project is to conserve original lime plaster and gypsum finishes in the sacristy and baptistery of mission SAN jose DE tumacacori. The church is the primary resource for which the park was established, as identified in the enabling legislation. The last comprehensive work on the interior was completed in 1984. Since then, the plaster has deteriorated, and preservation is needed.summary of project specific activities:develop treatment plan for the sacristy and baptistery of the mission church at tuma.complete the comprehensive condition assessment of the identified interior spaces of the church, using a variety of approaches (including visual evaluation, annotated ortho-rectified photomontage, non-destructive testing and analysis of surfaces and sub-surface issues) develop program for investigation and samplingdocument all past repairs as part of the baseline data, with particular focus on incompatible repairsprioritization of treatment areas based on material/design integrity, significance of features, level and rate of deterioration, and public visibility/accessdevelop of treatment recommendations to address causes of failure for the following: plaster loss, detachment of plasters, voids and inter-layer separation of plasters, friability of surface materials, adobe disintegration and loss, basal erosion, structural and micro-cracking, and failure of previous treatments; development of a treatment and monitoring approach and time-frameimplement in-situ treatmentremoval/replacement of incompatible repairscleaning surfacesremoval of saltsconsolidating disintegrating lime render/plasterstabilizing/replacing failing plaster edgesreattaching detached plastergrouting of cracks and voids in lime render/mortar -engineer needs to conduct structural assessment (not in contract)consolidation and reattachment of the painted finish coatsprovide originals (or copies) of all digital and hard copy information produced as part of the projectperformance goals including milestones and expected outcomes:develop treatment plan, complete treatments, and finalize a report for the NPS.beneficiaries:the project will benefit the upenn students, faculty, the public

Transactions

Action Obligated Date
Amendment This project will conserve original lime plaster and gypsum finishes in the sacristy and baptistery of mission SAN jose DE tumaccori. Activities include… $0
Amendment Programming supports a comprehensive network of cooperative study units to facilitate cooperative research, technical assistance, education, and training to… $0
Original award $191,893

Quick answers

Who received award P22AC01243?

P22AC01243 was awarded to The Trustees Of The University Of Pennsylvania by Intermountain Region (National Park Service) on September 1, 2022.

How much is award P22AC01243 worth?

$191,893 has been obligated on P22AC01243.