Purchase Order AG05K3P130046

Award Date 9/18/13
Potential Completion Date 8/18/14
Potential Value $98K
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Toutle, WA, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The USDA Forest Service awarded a $343,869 firm fixed price contract to Viking Engineering and Construction LLC under the Great American Outdoors Act program. The contract involves replacing and upgrading the fire sprinkler system at the Johnston Ridge Observatory in Toutle, Washington for the agency's Pacific Northwest Region. Key work includes replacing dry pipe sprinkler piping, mains, and branch lines, installing new dry pendent sprinklers and access panels, and adding a nitrogen...
The Department of Transportation Federal Highway Administration awarded a $5.7 million firm fixed price contract to Bruch And Bruch Construction Inc. to construct Segment B of the Spruce Railroad Trail in Olympic National Park, Washington. The 1.8-mile trail segment involves clearing, excavation, aggregate base, shotcrete, drainage, fencing, signs, and construction of a prefabricated steel bridge. Major subcontractors include Snell Crane Service, Inc. for crane services, Lakeside Industries Inc....
This firm-fixed-price definitive contract was awarded by the Operations Center Northwest, a civilian agency, to Clearway Services LLC for the restoration of approximately 9.8 miles of existing stock trails in the North Fork John Day Wilderness area of the Umatilla National Forest. The work includes brushing, log removal, slough and berm removal, root and rock removal, stump and snag removal, turn restoration, rock wall construction, and stream crossing and drainage structure restoration. The...
The Department of Transportation Federal Highway Administration awarded a $1,565,740.52 definite contract to Bruch And Bruch Construction Inc. to repair slumps along approximately 11 miles of roads within Olympic National Park in Washington state. The work involves clearing, excavation, installing erosion controls, aggregate base, asphalt paving, drainage features, signage and pavement markings to restore structural integrity and drivability along affected segments of Hurricane Ridge Road and...
This federal contract award is for a project titled "OR DOT CRGNSA 100(1), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL OR DOT CRGNSA 100(3), HISTORIC COLUMBIA RIVER HIGHWAY SUMMIT CREEK VIADUCT OR HOODRIVER 18(1), WYETH TRAILHEAD", awarded by the Department of Transportation Federal Highway Administration to prime contractor Stellar J Corp on March 30, 2017. The $23,300,336.43 Definitive Firm Fixed Price contract is for the construction, improvement, and restoration of historic highway...
This is a $21,285,631.58 definitive, firm-fixed-price contract awarded by the Federal Highway Administration (FHWA), a civilian agency, to Crestline Construction Company, L.L.C. for the OR DOT CRGNSA 100(4) Historic Columbia River Highway State Trail, Mitchell Point Crossing project. The work involves tunneling, grading, paving, signing, striping, landscaping, structures, and rockfall protection along a 1.45-mile section of trail 3 miles west of Hood River, Oregon. The contract has a tentative...
The Department of Transportation Federal Highway Administration awarded a $77,924 firm fixed price delivery order against its 2019 Architect Engineer Construction Management Inspection Support master IDIQ contract to Nwi&T Atkins SB JV, LLC. The order is for Consultant Inspector II services to support rehabilitation work on Stevens Canyon Road between mileposts 5.0 and 14.0 in Oakbrook, Washington. Services will include inspection tasks to ensure quality as the prime contractor rehabilitates...
This is a delivery order awarded by the Federal Highway Administration (FHWA) to Jacobs Engineering Group Inc. under the Central Federal Lands Highway Division Full Service Design 2022 - 2027 IDIQ contract. The order is for $202,529.72 to perform scoping and design services for the removal and replacement of a section of the John Muir Trail in Yosemite National Park. The project, titled "CA ERFO NP YOSE 2023-2(1) JOHN MUIR TRAIL ICE CUT," involves removing a hanging block of granite...
This is a firm fixed-price definitive contract awarded by the National Park Service's Pacific West Region to the Washington State Department of Transportation (WSDOT) for $85,000.00. The contract is for operational and emergency road maintenance on sections of State Highway 410 (Mather Memorial Parkway) and State Route 123 within the boundaries of Mount Rainier National Park. The contract was awarded on a noncompetitive basis under the Simplified Acquisition Procedures. WSDOT, a state government...
The National Park Service awarded a $1,391,127.65 firm fixed-price definitive contract to JMG Constructors LLC, a woman-owned small business, to rehabilitate the Hurricane Ridge Day Lodge in Olympic National Park, Port Andrews, Washington. The project involves improvements to the electrical, plumbing, fire detection, elevators, roof, windows, doors, walls, floors, and restrooms to comply with accessibility standards. This contract was set aside for small businesses and is expected to be...

JOHNSTON RIDGE OBSERVATORY TRAIL WAY AND WALKWAY

Posted 9/18/13, 12:00 AM