Definitive Contract 69056722C000019

Award Date 7/1/22
Potential Completion Date 3/25/23
Potential Value $1.6M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Port Angeles, WA, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
1
Legislative Mandate
Walsh Healy Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This $1,763,223.25 firm fixed price contract was awarded by the Federal Highway Administration (FHWA), a civilian agency, to Bruch & Bruch Construction, Inc., a small business based in Port Angeles, Washington. The contract is for the "WA NPS OLYM 2015(4), SPRUCE RAILROAD TRAIL SEGMENT C" project, which involves construction services for the National Park Service in Olympic National Park. The contract has no set-aside designation. Bruch & Bruch Construction is the prime...
This is a definitive contract awarded by the U.S. Department of Transportation Federal Highway Administration to Massana Construction, Inc. (a self-certified small disadvantaged business) for $2,450,329.58. The contract is for minor bridge repair and preservation work at 18 bridges within Olympic National Park in Washington state, including epoxy coating, concrete repair, wood decking, bridge painting, and other small items. The work is to be completed by September 25, 2023. The original...
This is a $951,150.00 firm-fixed-price construction services contract awarded by the Federal Highway Administration, a civilian agency, to Ecogrind Site Solutions LLC, a small business. The contract is for the CONSTRUCTION SERVICES FOR PROJECT WA ERFO NPS OLYM 2022-1 (1), OLYMPIC NPS ERFO REPAIRS 2022 project, which involves road reconstruction, bank stabilization, riprap installation, and engineered log jam construction along a 0.05-mile section of North Shore Road in Olympic National Park,...
This is a $1,442,277.19 Definitive Contract awarded by the Department of Transportation Federal Highway Administration to the small disadvantaged business Conway Construction Company for the rehabilitation of the Staircase Road at Olympic National Park in Port Angeles, Washington. The contract is for construction services including roadway, sidewalk, and trail reconstruction; slope stabilization; retaining wall installation; culvert replacement; erosion control; asphalt paving; and associated...
This is a definitive contract awarded by the Department of Transportation Federal Highway Administration to Bruch And Bruch Construction Inc., a small business, to perform the "WA NPS OLYM 2016(1), SPRUCE RAILROAD TRAIL SEGMENT A" project. The $1,128,082.34 firm fixed price contract was awarded on September 26, 2017, with a completion date of December 7, 2018. The work involves road construction and maintenance activities such as grading, paving, drainage, erosion control, and...
This is a definitive contract awarded by the Department of Transportation Federal Highway Administration to Columbia Pacific Construction, LLC, a small business. The $7,430,022.27 contract is for the Hurricane Ridge Road, Phase II project, a road construction effort located in Port Angeles, Washington. The contract has a firm fixed price pricing type and a completion date of November 30, 2018. As a total small business set-aside contract, this award is reserved for small business concerns.
The Department of the Interior National Park Service Pacific West Region awarded a definitive contract valued at $305,460 to Bruch And Bruch Construction Inc. to provide asphalt paving services on the Hurricane Hill Trail located in Olympic National Park, Washington. The solicitation sought proposals to place new 2-inch thick asphalt concrete paving over a prepared substrate between July 6 and September 3, 2020 on approximately 1.6 miles of trail. As a 100% small business set-aside awarded under...
The Department of Transportation Federal Highway Administration awarded a $5.7 million firm fixed price contract to Bruch And Bruch Construction Inc. to construct Segment B of the Spruce Railroad Trail in Olympic National Park, Washington. The 1.8-mile trail segment involves clearing, excavation, aggregate base, shotcrete, drainage, fencing, signs, and construction of a prefabricated steel bridge. Major subcontractors include Snell Crane Service, Inc. for crane services, Lakeside Industries Inc....
The Department of Transportation Federal Highway Administration awarded a $2.3 million firm fixed price contract to Conway Construction Company to complete entrance station improvements at Olympic National Park in Port Angeles, Washington. The solicitation sought bids to renovate the Heart O the Hills Entrance Station building and grounds, including replacing the roof, siding, doors and windows; upgrading HVAC, electrical, and plumbing systems; repaving the parking area; and installing new...
This federal contract award from the Department of Transportation Federal Highway Administration is for the WA NPS OLYM 107(1), UPPER HOH RIVER EMERGENCY REPAIR project in Forks, Washington. The $455,752.30 firm fixed-price definitive contract was awarded to the small business prime contractor Bruch And Bruch Construction Inc. on June 11, 2018 with a completion date of October 12, 2018. Bruch And Bruch Construction Inc. is an experienced provider of construction services to federal agencies,...

The Department of Transportation Federal Highway Administration awarded a $1,565,740.52 definite contract to Bruch And Bruch Construction Inc. to repair slumps along approximately 11 miles of roads within Olympic National Park in Washington state. The work involves clearing, excavation, installing erosion controls, aggregate base, asphalt paving, drainage features, signage and pavement markings to restore structural integrity and drivability along affected segments of Hurricane Ridge Road and Obstruction Point Road. This total small business set-aside contract has a period of performance from July 1, 2022 to March 25, 2023. The solicitation sought bids to address roadway damage and improve safety for travelers through Olympic National Park.

Generated 12/29/23, 2:21 PM