Replace entrance door chase hall e annex project #8169540: the contractor shall provide construction services necessary to replace yeaton hall's main entrance door assembly at the U.S. Coast guard…
Ended Awarded Last action
- Contract number
- 70Z0G118FPFA02600
- Awardee
-
One Way Development, Inc. UEI FSK3JMMKJHL9
- Awarding agency
-
Coast Guard
Department of Homeland Security
- Obligated
- $62,263
Award facts
- Opportunity
-
- 70Z0G118RPFA02600 Solicitation number
- Contract value 100% obligated
- $62,263.00 Current and potential, with all options
- Completion date 100% complete
- Current and potential, with all options
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Set-aside
- No set-aside
- Competition
- Full and Open Competition after exclusion of sources · 8 offers Multiple Award, Fair Opportunity
- Pricing
- Firm Fixed Price
- Place of performance
- New London, CT 06320, USA
- Legislative mandates
-
- Davis-Bacon Act FAR subpart 22.4
Award details come from SAM.gov/FPDS.
Transactions
| Action | Obligated | Date |
|---|---|---|
| Supplemental Agreement for work within scope | -$1,470 | |
| Other Administrative Action | $0 | |
| Other Administrative Action | $0 | |
| Original award | $63,733 |
Description
Replace entrance door chase hall e annex project #8169540: the contractor shall provide construction services necessary to replace yeaton hall's main entrance door assembly at the U.S. Coast guard academy. The door assembly includes; one set of wood double doors, all hardware, one wood window transom, one metal door frame, one door threshold, and the interior wood trim and blocking to the existing masonry opening as noted on the drawings. Work shall include but not be limited to the following: 1. Patch and repair the masonry opening and wood framed walls as required for installation of the new door frame and trim. 2. The new doors, frame, trim, etc. Are based on the original building drawings, historic photographs, field measurement of original components and current code requirements. All work shall be done by licensed contractors and shall comply with current codes and contract documents. 3. Remove the interior wood door trim and install new PVC trim to match existing size and profile. 4. Provide and install new door hardware, vertical mullion, aluminum threshold and exit devices. 5. Remove and reinstall adjacent marble wall base and plaster wall surfaces as required to perform the door assembly replacement work. 6. Prep, prime and paint all new doors, door frame, window transom and PVC trim. 7. Sand prime and paint the exterior entry; wood trim, wood base, wood side walls and soffit panels. 8. Prep prime and paint the interior (west) vestibule plaster wall, floor to ceiling. 9. Protect adjacent building components that are to remain from damage, including the marble and terrazzo vestibule floor, the exterior wood wall & soffit panels and the interior plaster walls and ceiling. Replace entrance doors at yeaton hall project #540276: the contractor shall provide construction services necessary to replace one set of exterior entrance doors in the northwest corner of chase hall's e annex at the U.S. Coast guard academy. Work shall include but not be limited to the following: 1. Remove the existing metal doors, door frame, door hardware and metal threshold and replace with new. The new doors shall match chase hall's original historic design intent. 2. Provide and install new door hardware, vertical mullion, aluminum threshold and access control devices as specified. 3. Prep new doors and new metal frame with concealed access control wiring and electronic hinges to the new panic hardware. Provide and install new hardware as specified. 4. Remove the existing wall mounted card reader and patch and repair masonry wall. Provide and install new access control card reader, cabling and wiring as specified. Provide and install new wiring runs between the door opening and the existing door control panels located in the electrical closet as designated on the plans. Perform all terminations. 5. Remove, repair and reinstall the adjacent terrazzo wall base and plaster wall surfaces as required to perform the door replacement work. 6. Prep, prime and paint the interior adjacent walls to the nearest cut-off point. Repair acoustic ceiling tile and grid as necessary. All work is to be performed in accordance with the following: specifications for replace exterior door chase hall e annex, USCG academy, new london, CT, project #8169540 and drawings CC-1279 (4 sheets); and specifications replace entry doors at yeaton hall, USCG academy, new london, CT, project #540276 and drawings CC-1295 (4 sheets).
Quick answers
Who was awarded contract 70Z0G118FPFA02600?
70Z0G118FPFA02600 was awarded to One Way Development, Inc. by Coast Guard (Department of Homeland Security) on June 4, 2018.
How much is contract 70Z0G118FPFA02600 worth?
The government has obligated $62,263 on 70Z0G118FPFA02600.
Is contract 70Z0G118FPFA02600 an order under another contract?
Yes. 70Z0G118FPFA02600 is a delivery order under 70Z0G118DPRV16100, an indefinite delivery contract, on Coast Guard RMACC 2019.
Was contract 70Z0G118FPFA02600 competed?
The extent of competition for 70Z0G118FPFA02600 was full and open competition after exclusion of sources. The government received 8 offers.
On GovTribe
See this award's full record
- Every transaction and funding action
- The awardee's other awards and teaming partners
- Similar awards and recompete opportunities
- Ask GovTribe AI about this award