Definitive Contract 697DCK23C00106
- Not listed
- This federal contract award to IPI Construction, a minority-owned, self-certified small disadvantaged business, provides $4,586,912.04 in funding for the construction of the ATCT (Air Traffic Control Tower) Modernization Project at Van Nuys Airport (VNY) in California. The contract is a Definitive Contract with a Firm Fixed Price pricing type. The project will include the replacement of the electrical distribution system, HVAC systems, and plumbing systems at the VNY ATCT. This contract was...
- The U.S. Federal Aviation Administration (FAA), an agency of the U.S. Department of Transportation, has awarded a $360,807.70 firm-fixed-price contract to Kaige Electrical Solutions, LLC, a small disadvantaged, veteran-owned business, for the construction of a Precision Approach Path Indicator (PAPI) system serving Runway 15 at Hollywood Burbank Airport in Burbank, California. This contract has a total small business set-aside designation. Kaige Electrical Solutions, LLC, which is registered...
- This federal contract was awarded by the Department of Transportation Federal Aviation Administration (DOT FAA) to Burton Construction, Inc., a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business. The contract, valued at $867,646.89, is for the relocation of power and lighting infrastructure at airports in Butte, Montana and McMinnville, Oregon, as well as the installation of Precision Approach Path Indicators (PAPIs) at Helena Regional Airport...
- This federal contract award, DTFACN15D00010|DTFACN15D00010CALL0001, was issued by the Southwestern Region of the Federal Aviation Administration (FAA), a civilian agency, to Burton Construction, Inc., a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business. The $169,520.61 firm-fixed-price delivery order is for the relocation of a power box for the Runway End Identifier Lights (REIL) in Farmington, New Mexico. This award is part of a larger $999...
- This is a definitive contract awarded by the Department of Transportation Federal Aviation Administration Headquarters to Burton Construction, Inc., a Service-Disabled Veteran-Owned Small Business, for miscellaneous repairs at the Paine Field Air Traffic Control Tower in Everett, Washington. The firm fixed-price contract has a potential value of $203,905.00 and a completion date of September 30, 2018. Burton Construction is a minority-owned, veteran-owned, Native American-owned, and small...
- This is a firm fixed-price definitive contract awarded by the Federal Aviation Administration (FAA) to Burton Construction, Inc., a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business located in Spokane, Washington. The contract, valued at $132,239.00, is for expanding an existing gravel pad and installing 6 pilings for a new foundation adjacent to a remote center air/ground (RCAG) communication facility in Barrow, Alaska. The contract has a...
- This is a firm-fixed-price contract awarded by the Federal Aviation Administration (FAA) to BVB Construction Inc., a minority-owned, small disadvantaged business, for the reconfiguration of the M-1 room at the Los Angeles Air Route Traffic Control Center (ARTCC) located in Palmdale, California. The contract, valued at $461,524.11, was set aside for small businesses and has a completion date of February 23, 2018. The contract is a definitive contract, meaning it is not part of a larger contract...
- This is a $1,802,613.07 firm-fixed-price definitive contract awarded by the Department of Transportation Federal Aviation Administration (DOT FAA) to Burton Construction, Inc., a small disadvantaged, minority-owned, veteran-owned, and service-disabled veteran-owned business, to establish navigational aids for Runway 05 at Pullman-Moscow Regional Airport in Pullman, Washington. The contract was set aside for total small business. Burton Construction holds multiple indefinite delivery/indefinite...
- This is a $2,402,129.32 definitive, firm-fixed price construction contract awarded by the Federal Aviation Administration (FAA) to Burton Construction, Inc., a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business. The contract is for construction services to replace the Runway 20 MALSR (Medium-Intensity Approach Lighting System with Runway Alignment Indicator Lights), Glide Slope, and Localizer at Bremerton National Airport (KPWT) in Bremerton,...
- This is a definitive contract awarded by the Department of Transportation Federal Aviation Administration Headquarters to Burton Construction, Inc. for the establishment of a high power distance measuring equipment (HPDME) at the Falcon Crest Utility Site located in Payson, Arizona. The contract has a firm fixed price of $151,639.26 and is set aside for small businesses. Burton Construction, Inc. is a minority-owned, veteran-owned, Native American-owned, service disabled veteran-owned business...
The Department of Transportation Federal Aviation Administration (DOT FAA) awarded a $823,223.14 definitive, firm-fixed-price contract to Burton Construction, Inc. (Burton Construction) for the construction of a new Precision Approach Path Indicator (PAPI) system for Runway 34R and installation of a new concrete pad and bollards at the existing VNY 16R PAPI at the Van Nuys Airport (VNY) in Van Nuys, California. This contract is set aside for total small business and is expected to be completed by May 31, 2024. Burton Construction is a minority-owned, veteran-owned, Native American-owned, service-disabled veteran-owned small business that provides a wide range of construction, renovation, repair, and maintenance services to federal agencies, including the DOT FAA.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00007 | Change Order | ($9k) | 3/27/24 | |
| P00006 | Other Administrative Action | $0 | 3/7/24 | |
| P00005 | Other Administrative Action | $0 | 2/28/24 | |
| P00004 | Other Administrative Action | $0 | 2/20/24 | |
| P00003 | Change Order | $0 | 2/5/24 |