About this opportunity

Lakeland Linder International Airport is requesting proposals for permitting and construction oversight of the southeast quadrant watermain extension project, with proposals due July 24, 2026. The scope includes extending an 8-inch watermain loop throughout the southeast quadrant development area to serve planned hangar and office developments, and replacing the existing 6-inch watermain along Airside Center Drive with a 12-inch public utility main.

Proposal price and a completed schedule of values (LAL_SE_Quad_WM_Extension_Bid_Form) are RFP submission requirements. Technical specifications and plans are provided in LAL_SE_Quad_WM_Extension_IFB_Tech_Specs.pdf and LAL_SE_Quad_WM_Extension_IFB_Plans.pdf. Addendum #2 (Revision) was issued June 29, 2026.

The Airport is subject to the Florida Department of Transportation (FDOT) indemnification requirements for contractors and consultants. Contractors must complete the PSM Contractor Annual Audit Form and Contractor Safety Evaluation Form. A human trafficking affidavit is required as a condition of contract award.

Opportunity text

Permitting, and construction oversight of the southeast quadrant watermain extension project at Lakeland Linder International Airport. The project will extend an 8-inch watermain loop throughout the southeast quadrant development area to serve planned hangar and office developments, and will include replacement of the existing 6-inch watermain along Airside Center Drive with a 12-inch public utility main

Proposal price and attachment I ( LAL_SE_Quad_WM_Extension_Bid_Form (schedule of values) are both RFP Submission Requirements

Files

File Type Posted
Watermain_Southeast_Quadrant_Extension_(Addendum_#3_Revision).pdf PDF
G-009_–_CONSTRUCTION_PHASING_PLAN_PHASE_3_Add_3.pdf PDF
G-008_–_CONSTRUCTION_PHASING_PLAN_PHASE_2C_Add_3.pdf PDF
G-007_–_CONSTRUCTION_PHASING_PLAN_PHASE_2B_Add_3.pdf PDF
G-006_–_CONSTRUCTION_PHASING_PLAN_PHASE_2A_Add_3.pdf PDF
G003_-_General_Notes_&_Safety_and_Security_Notes_Add_3.pdf PDF
G002_-_Index_of_Drawings_&_Summary_of_Quantities_Add_3.pdf PDF
CD101_-_Overall_Existing_Conditions_&_Demolition_Plan_Add_3.pdf PDF
Item_U-100_-_Water_and_Wastewater_Utilities_Add_3.pdf PDF
LAL_SE_Quadrant_Watermain_Addendum_3.pdf PDF
LAL_SE_Quad_WM_Extension_Bid_Form_Add_3.xlsx XLSX spreadsheet
Watermain_Southeast_Quadrant_Extension_(Addendum_#2_Revision).pdf PDF
LAL_SE_Quad_WM_Extension_Bid_Form_(schedule_of_values).xlsx XLSX spreadsheet
LAL_SE_Quad_WM_Extension_IFB_Plans.pdf PDF
LAL_SE_Quad_WM_Extension_IFB_Plans.pdf PDF
LAL_SE_Quad_WM_Extension_IFB_Tech_Specs.pdf PDF
LAL_SE_Quad_WM_Extension_IFB_Tech_Specs.pdf PDF
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Vendor.doc DOC document
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Consultant.doc DOC document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Vendor.doc DOC document
Show all 33

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity