Waterline Replacement

Solicitation # WC1123
Posted 7/30/25, 1:00 AM
No Updates
Due 8/20/25, 12:00 PM
Source
View
Similar Opportunities
The Oklahoma City Water Utilities Trust is seeking a prequalified Water Pipeline Contractor "C" for a waterline replacement project designated as WC-1114, located along Mulholland Drive between Woody Creek Drive and Saddle River Drive. The project requires a comprehensive waterline infrastructure improvement involving specific construction methods, materials installation, utility coordination, and adherence to local and state regulations. Bidders must be prequalified with a Water...
The State of Oklahoma, specifically Oklahoma County and Hobart City, is seeking a prequalified Water Pipeline Contractor "C" for a water main installation project designated as WC-1120. The procurement involves the installation of approximately 3,289 linear feet of 12-inch PVC waterline along SW 164th Street between Western Avenue and Serrano Drive. Key deliverables include meter relocations for 14 existing water services, installation of gate valves, fittings, fire hydrants, and...
The City of Oklahoma City is seeking a qualified Paving Contractor "A" for a comprehensive roadway widening, waterline, and sanitary sewer relocation project located on SW 29th Street from South Rockwell Avenue to South MacArther Boulevard. The procurement requires contractors to have specific prequalification classifications: PC-0525, WC-1037, and SC-1158. The project involves complex infrastructure improvements including roadway expansion, waterline and sanitary sewer relocation,...
The Oklahoma City Water Utilities Trust is seeking a prequalified Wastewater Pipeline Contractor "C" for the Tinker Lift Station Elimination, Area A project (TS-0007) located at Tinker Air Force Base in Oklahoma City. This infrastructure procurement involves comprehensive wastewater pipeline work, including renewal, replacement, and upgrade of potable water and domestic wastewater systems. The project requires extensive coordination with Tinker Air Force Base authorities, involving...

The Oklahoma City Water Utilities Trust (OCWUT) is seeking bids for a waterline replacement project (WC-1123) across five separate locations in Oklahoma City, with a specific focus on infrastructure improvement. The project requires a prequalified Water Pipeline Contractor "C" and involves installing approximately 380 linear feet of water lines ranging from 6-inch to 8-inch diameter at various addresses. Specific locations include 8617 Hillcrest Drive, 12109 Greenwick Drive, 609 SW 63rd Terrace, 1623 N Page Avenue, and 27 SW 29th Street. Deliverables include complete waterline replacement, including waterline abandonment, bore and steel encasement, pipe installation, valve replacements, and service connections. The project also requires comprehensive site restoration, utility coordination, and adherence to erosion control standards. A mandatory pre-bid conference is scheduled for August 6, 2025, at 4:00 PM, with electronic bid submissions due by 10:00:00 AM on August 20, 2025. The contract completion time is set at 150 calendar days, and bidders must submit detailed documentation including anti-collusion affidavits and business relationship affidavits.

The procurement emphasizes local business participation through the Small, Local and Minority Business Utilization Program, potentially creating opportunities for disadvantaged enterprises. Bidders must provide a maintenance bond for two years at 100% of the contract amount and comply with Oklahoma City Standard Specifications for Construction of Public Improvements. While no specific incumbent vendors are mentioned, the project requires comprehensive technical compliance, including specific requirements for pipe materials, tracer wires, and restrained joints. The Oklahoma City Water Utilities Trust reserves the right to reject any or all bids, with the contract expected to be awarded to the lowest responsible bidder meeting all prequalification and documentation requirements. Though a specific budget range is not explicitly stated, the project's complexity and multiple location interventions suggest a substantial infrastructure investment. Contractors will be responsible for detailed site management, including storm water pollution prevention, utility protection, traffic control, and post-construction restoration to match or improve existing conditions.

Generated 7/30/25, 5:14 PM