Water Plant No. 2 Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 00322-0228-01
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Amy Hennard ahennard@quiddity.com (979) 731-8000
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Fort Bend County, Texas is requesting bids on Water Plant No. 2 Improvements, with proposals due October 1, 2026. The project scope includes demolition of existing equipment and construction of new water-treatment infrastructure.
Demolition work encompasses one 125,000-gallon welded steel ground storage tank, one 20,000-gallon hydropneumatic tank with foundation, and two 750-gpm booster pumps with foundation. Construction includes one new 200,000-gallon welded steel ground storage tank with self-supporting umbrella roof and foundation, one new 20,000-gallon hydropneumatic tank with foundation, two new 750-gpm booster pumps with foundation, associated electrical, structural, control, and piping systems, and site improvements including drainage, swales, and site grading. All work must result in a completely functional water plant as shown on the construction plans.
The County has posted contract documents and technical specifications (4 documents totaling 19MB) containing detailed material, equipment, and construction methodology requirements. The source does not identify contract value, contract term, place of performance, incumbent contractor, pre-bid meeting or site-visit dates, question deadline, evaluation criteria, or set-aside or preference programs applicable to this procurement.
Opportunity text
The work includes demolition of one (1) 125,000-gallon welded steel ground storage tank; one (1) 20,000-gallon hydropneumatic tank including foundation; two (2) 750-gpm booster pumps including foundation. Construction of one (1) 200,000-gallon welded steel GST, with self-supporting umbrella roof, including foundation; one (1) 20,000-gallon hydropneumatic tank including foundation; two (2) 750-gpm booster pumps including foundation; associated electrical, structural, controls, and piping; site improvements including drainage, swales, site grading, and all additional items and phasing shown on the construction plans or needed for the completely functional water plant.
Files
| File | Type | Posted |
|---|---|---|
| Contract Documents and Technical Specifications (4).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity