The City of Inglewood Department of Public Works is requesting bids for water main replacement across approximately 18,000 linear feet in Inglewood Water Pressure Zone #1 under Invitation to Bid CB-26-21, with bids due August 13, 2026 at 11:00 a.m. PDT and a mandatory onsite pre-bid meeting on July 23, 2026 at 9:00 a.m. at the intersection of 117th Street and Cherry Avenue.

The scope covers replacement of existing water main with ductile iron pipe (DIP) on Cherry, Dehn, Simms, Christopher, Lemoli, 115th, 116th, 117th Streets and 118th Place between specified cross-streets, plus meter and fire hydrant exchanges on city streets per provided lists. Work is detailed in Inglewood construction drawing No. W-768 (Sheets 1–17). Bidders must hold a California Contractor license, Class "A" and "C34" combination.

The estimated bid value is $7.35 million on a lump-sum basis with line-item submission. The project commences January 4, 2027 for a duration of 265 working days. Bid bonds are 10 percent; performance and payment bonds are each 100 percent. Liquidated damages are assessed at $1,500 per calendar day for delays. Bids remain valid for 90 days from submission.

Questions close August 6, 2026 at 12:00 p.m. PDT. Bids must be submitted in paper format to the Inglewood City Clerk Office at 1 West Manchester Boulevard, Inglewood, California 90301. Additional information and response submission are available through the PlanetBids Vendor Portal. Contact Thomas Lee at the City of Inglewood Public Works Department for inquiries.

Opportunity text

Replacement of existing water main with DIP pipes about 18,000 linear feet on Cherry, Dehn, & Simms Avenues between Imperial Highway to 118th Place; Christopher Avenue between Lemoni Avenue and 118th Place; Lemoli Avenue between Alley North to Simms Avenue to 118th Place; 117th Street & 117th Place between Dehn Avenue and Lemoni Avenue; 115th Street & 116th Street between Dehn Avenue and Lemoni/Simms/Alley; Yukon Avenue between Imperial Highway and 119th Court; and 115th, 116th, 117th, 118th Streets & 118th Place between Yukon Avenue and Cherry Avenue see Inglewood construction drawing No. W-768 Sheet 1 to Sheet 17. Meter and Fire Hydrant exchange on City Streets per Lists.