Water Buoy System Mnt Rpr
Closed State & local contract opportunity Posted
- Solicitation number
- SFGOV-0000012047
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
San Francisco International Airport is requesting proposals for maintenance and repair services on its Water Perimeter Security Zone Buoy System under RFP 50449.01, with proposals due September 18, 2026 at 3:00 p.m. PDT.
The system comprises twenty-two float collar buoys positioned 200 yards offshore around the entire airport perimeter spanning approximately five miles. Each buoy is equipped with a 2,000-pound reinforced concrete anchor block with embedded 316L stainless steel chain, a 10-foot round sling, and a Sealite SL-60 solar-powered light with 2–3 nautical-mile visibility. The system has been operational since 2004. The scope includes maintenance inspections and repairs to anchoring hardware, buoy components, and associated infrastructure.
The contract term is five years. No estimated contract value is disclosed. The procurement is categorized as Consultants or Professional Services (NIGP 96258). Multiple bids are permitted, and edits to submitted bids are allowed. Questions and proposals must be submitted through the Airport e-Procurement Portal at https://procurement.opengov.com/portal/sfo/projects/296925. The primary contact is Quoc Truong, Principal Administrative Analyst, (650) 821-2029 or quoc.truong@flysfo.com.
Opportunity text
The Airport is seeking qualified suppliers (Proposers) to provide proposals (Proposal) for SFOs Water Perimeter Security Zone Buoy System (System) maintenance and repair services (Services). The System provides a visual barrier delineating the RESTRICTED AREA KEEP OUT zone around the airport shoreline. The existing System is comprised of twenty-two (22) float collar buoys that each have a 2,000-pound reinforced concrete anchor block with embedded 316L stainless steel chain, a 10-foot round sling connecting the buoy to the chain, and a Sealite SL-60 2-3 nautical-mile solar powered light. The float collar buoys are located 200 yards from the shoreline around the entire Airport spanning approximately five (5) miles. Since the Systems installation in 2004, maintenance inspections and repairs have been conducted on the anchoring hardware and buoy system
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity