Upper Main Safety and Mobiity
Closed State & local contract opportunity Posted
- Solicitation number
- ITB 26-30, PRJ101097
- State
- Washington
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Julie Denton julie.denton@cityofvancouver.us (360) 487-8430
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Portland, Washington is requesting bids on the Upper Main Safety and Mobility infrastructure project under ITB 26-30, with bids due August 25, 2026. The project involves removal of one northbound travel lane between NE 39th Street and NE Hazel Dell Avenue, implementation of a protected two-way bicycle facility between E 40th Street and NE 45th Street, construction of a separated two-way pedestrian path adjacent to the bicycle facility from the southern driveway of Covington House to NE 45th Street, installation of enhanced bicycle crossings at intersections of F Street with E 39th Street and E 40th Street, and installation of shared lane markings on F Street between E 39th Street and E 40th Street.
Award decisions will be based on demonstrated competence, financial responsibility, and the lowest responsive bid meeting all specifications and requirements. The ITB establishes standard contractual obligations including insurance requirements, bonding, and prevailing wage compliance. Bid submissions must include technical specifications, pricing documentation, and contractor qualifications in the format and content specified in the solicitation documents.
Opportunity text
This Contract provides for the removal of one northbound travel lane between NE 39th Street and NE Hazel Dell Avenue. A protected two-way bicycle facility will be implemented between E 40th Street and NE 45th Street. Between the southern driveway of Covington House and NE 45th Street, a separated two-way pedestrian path will be constructed adjacent to the bicycle facility. Enhanced bicycle crossings will be provided at the intersections of F Street with E 39th Street and E 40th Street. In addition, shared lane markings (sharrows) will be installed on F Street between E 39th Street and E 40th Street and other work.
Files
| File | Type | Posted |
|---|---|---|
| ITB26-30 FinalAssembledv2.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity