Miami-Dade County Parks, Recreation and Open Spaces Capital Programs Division is requesting price quotations for structural repairs to the Tropical Park Stables A-E buildings, with quotations due August 11, 2026 at 2:00 p.m. and a non-mandatory pre-bid meeting scheduled for July 15, 2026 at 10:00 a.m. at the project site (7900 SW 40 Street, Miami, Florida 33155).
The scope covers concrete spall patching and epoxy crack repairs on the precast double T roof framing system and adjacent structural elements. Work includes removal of deteriorated concrete, evaluation and cleaning of exposed reinforcing steel, installation of replacement reinforcement where necessary, application of bonding agents, and placement of structural repair mortar to restore original profiles. Cracks will be routed, sealed, port installed, and injected with low-viscosity epoxy per manufacturer requirements. All materials—patching compounds, structural mortars, bonding agents, corrosion inhibitors, epoxy injection systems, and reinforcement—require Engineer of Record approval prior to use. The contractor must submit and gain approval of a mock-up demonstrating all repair procedures before commencing full production work. Repairs will be phased one stable at a time with full completion and acceptance of each building required before proceeding to the next. A primary General Building Contractor license is required.
The estimated contract value is $850,000, excluding contingencies and dedicated allowances. The contract carries a 365-calendar-day completion timeline with an anticipated start date of September 1, 2026. Liquidated damages are assessed at $250 per day for delays. Performance and payment bonds, bid bonds, and insurance coverage (worker's compensation; commercial general liability of at least $300,000 per occurrence and $600,000 aggregate; automobile liability of at least $300,000 combined single limit) are required. A mandatory 2% User Access Program fee applies to all payments. Award will be to the lowest responsible bidder. E-Verify employment eligibility verification is required. No DBE or SBE set-asides apply.
Opportunity text
CONTRACTOR shall furnish all necessary supervision, labor, tools, materials, and safety equipment required to provide a complete installation of the Tropical Park Stable A-E Building Repairs in accordance with the following. The work consists of performing structural repairs to the existing Stable A- E buildings at Tropical Park, including concrete spall patching and epoxy crack repairs on the precast double T roof framing system and adjacent structural elements. Repairs involve removing deteriorated concrete, evaluating and cleaning exposed reinforcing steel, installing replacement reinforcement where necessary, applying approved bonding agents, and placing structural repair mortar to restore original profiles. Cracks will be routed, sealed, port installed, and injected with low viscosity epoxy in accordance with manufacturer requirements. All repairs must be performed in accordance with the structural notes, material specifications, and repair details in the construction documents and coordinated with the Owner and Engineer throughout the process. This project involves rehabilitating deteriorated portions of the Stable A-E concrete roof system and related structural components to restore their integrity and performance. Contractor shall submit all proposed repair materialsincluding patching compounds, structural mortars, bonding agents, corrosion inhibitors, epoxy injection systems, and reinforcementto the Engineer of Record for review and approval prior to use. The Contractor shall prepare and submit an initial mock up of the proposed repair procedures, based on approved product submittals, demonstrating all steps of concrete spall repair and epoxy crack injectionincluding surface preparation, reinforcement cleaning, bonding agent application, patch placement, and port injection methodsfor review by the Owner, Engineer, and Special Inspector prior to proceeding with full production work. Contractor shall provide, install, maintain, and remove all necessary shoring and temporary bracing to ensure structural stability during repair operations. When required, engineered shoring drawings must be pre-pared and certified by a licensed professional engineer. The Contractor shall phase the work so that repairs are completed one stable at a time, with each stable fully repaired and accepted before work begins on the next, and progression shall occur only after final approval of the completed work by the Owner, the Special Inspector, and the Building Department. Work will be as per plans and specifications provided by Owner: Attachment A: Stable A Building Repair Plans Attachment B: Stable B Building Repair Plans Attachment C: Stable C Building Repair Plans Attachment D: Stable D Building Repair Plans Attachment E: Stable E Building Repair Plans The Contractor acknowledges and agrees that this scope of work includes the includes performing all structural repairs to the existing Stable AE buildings at Tropical Park, including concrete spall patching and epoxy crack injection on the precast double T roof framing system and adjacent structural components.
Files
| File | Type | Posted |
|---|---|---|
| miami-dade RPQ_No_2026TROPSR.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity