The City of Tacoma Public Utilities Department is soliciting design-build proposals for the Trilogy Reservoir and Booster Pump Station, with sealed bids due November 10, 2026. The project encompasses design and construction of a 3–4 million gallon above-ground reservoir serving the 810 pressure zone and an approximately 3,000 gallon-per-minute below-ground booster pump station serving the 950 pressure zone.

The design-build delivery method requires the selected contractor to provide both design and construction services under a single contract. Technical proposals must address engineering design, construction methodology, quality assurance, schedule, and safety protocols. Bidders must demonstrate relevant experience in similar water utility projects, including reservoir design, construction, and booster pump station installation.

Evaluation criteria include technical capability, cost competitiveness, contractor qualifications, and ability to execute this complex water infrastructure project. Pricing is evaluated as part of the overall proposal. A mandatory pre-bid conference was held to allow potential bidders to review project requirements and site conditions. Award is anticipated following evaluation of responsive proposals against stated selection criteria.

Opportunity text

This project will involve the design and construction of a 3-4 Million Gallon above-ground reservoir intended to serve the 810 pressure zone and an approximately 3,000 gallon-per-minute below-ground booster pump station to serve the 950 pressure zone.

Files

File Type Posted
TW26-0186F.pdf PDF