Traffic Signal and Fiber Optic Communication Improvements

Closed State & local contract opportunity Posted

Solicitation number
26-869
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Los Angeles County is soliciting bids for traffic signal, fiber optic communication, intelligent transportation systems (ITS), and ADA ramp improvements along Pioneer Boulevard from 166th Street to Lakeland Road in California, with proposals due July 20, 2026.

The scope requires the contractor to furnish and install conduit, pull boxes, countdown pedestrian signal heads, accessible pedestrian signals and push buttons, push button posts, traffic signal poles, traffic signal cabinets, advanced transportation controllers, malfunctioning monitoring units, battery backup systems, service cabinets, video detection systems, detector loops, safety lighting, luminaires, internally illuminated street name signs, communication hub cabinets, fiber optic cable, fiber distribution units, fiber optic splicing, wireless radios, and Ethernet switches. All components must be fully installed, configured, integrated, tested, and commissioned to manufacturer specifications, special provisions, and project plans.

The contractor is responsible for furnishing all necessary labor, materials, equipment, and incidental work required to complete the project as specified in the contract documents.

Opportunity text

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. Works consists of traffic signal, fiber optic communication, ITS, and ADA ramp improvements along Pioneer Boulevard from 166th Street to Lakeland Road, and includes, but not limited to furnishing and installing conduit, pull boxes, countdown pedestrian signal heads, accessible pedestrian signals and push buttons, push button posts, traffic signal poles, traffic signal cabinets, advanced transportation controllers, malfunctioning monitoring units (MMU), battery backup systems (BBS), service cabinets, video detection systems, detector loops, safety lighting, luminaires, internally illuminated street name signs, traffic signal cabinets, communication hub cabinets, fiber optic cable, advanced transportation controllers, fiber distribution units, fiber optic splicing, wireless radios, and Ethernet switches. Contractor shall be fully installed, configured, integrated, tested and commissioned to the manufacturer's specifications, these Special Provisions, and the project plans.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity