Thompson Peak Parkway Bridge at Teata Pass Wash

Closed State & local contract opportunity Posted

Solicitation number
27IFB097
State
Arizona
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Scottsdale is requesting bids for construction of the Thompson Peak Parkway Bridge at Reata Pass Wash under IFB 27IFB097, with sealed bids due August 20, 2026 at 2:00 p.m. through the City's Bonfire Interactive portal and a pre-bid conference scheduled virtually via Microsoft Teams on July 30, 2026 at 9:00 a.m.

The scope includes bridge abutment and pier drilled shaft foundations, bridge substructure and superstructure, retaining walls, roadway paving, concrete curb and gutter, sidewalk, stabilized shared-use path, grading and drainage, signing and marking, landscape and irrigation, and bridge stone façade aesthetic treatments. Contractors must maintain an Arizona State Contractor's License and comply with federal and state immigration law requirements, including E-Verify Program participation. Minimum insurance coverage with A.M. Best ratings of not less than B++ is required, with certificates of insurance submitted on ACORD forms.

Bids will be evaluated on a lowest responsive and responsible basis, inclusive of all applicable taxes. A bid bond or cashier's check equal to ten percent of the total bid amount is required. The City reserves the right to award by individual line item, by group of line items, or as a total, whichever is deemed most advantageous. Contractors assume full responsibility for subcontractor performance and must obtain City approval before engaging additional subcontractors. Payment terms are within thirty days of invoice receipt, except where Title 34 circumstances apply, requiring payment within fourteen days.

Questions are due by 2:00 p.m. on August 12, 2026. Bid opening will be conducted as a remote Microsoft Teams Live Event. All required documentation, including bonds, insurance certificates, and IRS W-9 forms, must be submitted within ten calendar days of contract award notification.

Opportunity text

The Project consists of the construction of roadway, bridge, drainage, striping and signage improvements to Thompson Peak Parkway at the Reata Pass Wash. The improvements include but are not limited to bridge abutment and pier drilled shaft foundations, bridge substructure and superstructure, retaining walls, roadway paving, concrete curb, gutter, and sidewalk, a stabilized shared-use path, grading and drainage, signing and marking, landscape and irrigation, and bridge stone faade aesthetic treatments.