Sweetwater High School Fire Door Replacement Project
Open State & local contract opportunity Posted
- Solicitation number
- 26-2991-DP-0-2027/DP
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Donald Prince donald.prince@sweetwaterschools.org (619) 691-5540
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Sweetwater Union High School District is requesting bids on the replacement of five fire doors at Sweetwater High School to comply with NFPA 80 standards and local Authority Having Jurisdiction requirements under ITB, with bids due November 19, 2026 at 11:00 a.m., and a mandatory pre-bid meeting and site walk on October 27, 2026 at 8:30 a.m.
The scope includes furnishing all labor, material, equipment, transportation, and supervision for fire door replacement. Contractors must verify all measurements and construction requirements provided as rough estimates in the project documents. M/WBEs are encouraged to participate, though no set-aside or participation goal is specified.
A bid bond is required. The pre-bid meeting will be held at the Maintenance Conference Room, 642 Arizona St., Chula Vista, California 91911, and attendance at the site walk is mandatory for all prospective bidders. Late submissions will be returned unopened. Bids can be downloaded from DemandStar Corporation's website at https://www.demandstar.com for a document cost plus shipping. All inquiries must be directed exclusively to Donald Prince, Purchasing Manager; prospective bidders are cautioned against contacting other district staff or officials.
Opportunity text
Scope of work is for the replacement at Sweetwater High School of five fire doors to meet NFPA 80 standards and local Authority Having Jurisdiction (AHJ). Contractors must verify all measurements and construction requirements provided as rough estimates below. The covered work consists of furnishing all labor, material, equipment, transportation, and supervision for performing all necessary operations required for proper execution of scope of work as listed on the attached pages.
Files
| File | Type | Posted |
|---|---|---|
| Sweetwater High School Fire Door Replacement Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity