About this opportunity

The San Francisco Unified School District is requesting bids for removal and replacement of roof skylights at George Washington High School (SFUSD Project No. 12502), with bids due September 22, 2026 at 2:00 p.m., and a mandatory job walk on August 20, 2026. The District has established a 3% Disabled Veteran Business Enterprise (DVBE) Participation Goal requiring all bidders to submit DVBE worksheets with evidence of two advertisements published at least 14 days prior to bid opening.

Bidders must hold a California Class B General Building Contractor license with Asbestos and Lead Certification, or be a subcontractor with equivalent certification. This is a construction project involving removal of existing gym roof skylights and installation of new aluminum-framed skylights with translucent sandwich panels, skylight concrete roof curb modifications, sealants, roof repairs, miscellaneous plumbing work, and hazardous materials abatement. Work may be performed after school hours and weekends.

The estimated construction value is $540,000. Prevailing wage rates apply under California Labor Code sections 1770 et seq.; all contractors and subcontractors must comply with contractor registration requirements under Labor Code sections 1771.4 and 1725.5. Bid security of not less than 10% of the maximum bid amount is required. Each bid proposal must include a subcontractors list, a non-collusion declaration, and a statement of bidders' qualifications. The contract will be awarded to the responsible bidder submitting the lowest priced responsive total bid proposal. Bid proposals cannot be withdrawn for 90 days after opening. Bid documents are available from ARC Document Solutions San Francisco (100 Hooper Street, Suite 20, San Francisco, California 94107) for a non-refundable fee. Bid documents became available August 12, 2026. Proposals must be submitted to 135 Van Ness Avenue Lobby, San Francisco, California.

Opportunity text

The Project is generally described as, but not limited to, Removal of existing roof skylights in the school gym and replacing them with new aluminum-framed skylights with translucent sandwich panels, with skylight concrete roof curb modifications, sealants, roof repairs, miscellaneous plumbing work, and abatement of hazardous materials. Work may also require performing tasks after school hours and weekends.