Subcontractor Opportunities* Fire Station No. 77 Restroom Remodel Project

Closed State & local contract opportunity Posted

Solicitation number
PW-27-29-SB
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Fontana is requesting bids for the Fire Station No. 77 Restroom Remodel Project under Invitation #PW-27-29-SB, with bids due September 17, 2026 at 2:00 p.m. PDT and a mandatory pre-bid meeting on September 3, 2026 at 10:00 a.m. PDT at the fire station location. Contractors must hold both Class "A" and Class "B" contractor's licenses.

The scope covers demolition and replacement of two existing showers/restrooms and one locker room (approximately 738 square feet total) at 17459 Slover Avenue, Fontana, California. Interior work includes new partitions, finishes, and replacement of mechanical, electrical, and plumbing systems to convert from one gang shower/restroom and one single-occupancy shower/restroom to five single-occupancy shower/restrooms. The remaining locker-room area becomes a new laundry room. Site improvements include ADA parking-stall modifications and path-of-travel adjustments to the front entry door (approximately 2,302 square feet). The contractor must furnish all labor, materials, equipment, transportation, and supervision.

The estimated bid value is $450,000, awarded as a lump sum. The contract term is 75 working days beginning September 7, 2026. Liquidated damages are set at $1,000 per calendar day of delay beyond the completion date. Bid bond is 10 percent; payment and performance bonds are each 100 percent. Bid prices must remain valid for 90 days.

Questions are due September 10, 2026 at 2:00 p.m. PDT. Bids must be submitted through the PlanetBids Vendor Portal. The contact is Elia Alvarez at 909-350-6605 or ealvarez@fontanaca.gov.

Opportunity text

The Contractor shall furnish all labor, materials, equipment, transportation, and supervision required to complete the Fire Station No. 77 Restroom Remodel located at 17459 Slover Avenue, Fontana, CA 92335. Scope of Work: The Scope of Work consists of demolishing and replacing (2) existing showers/restrooms and (1) locker room (approximately 738 S.F. total). Interior improvements include new partitions, opening, finishes, and replacement of mechanical, electrical, and plumbing systems as required to support the change from (1) gang shower/restroom and (1) single- occupancy shower/restroom to (5) single-occupancy shower/restroom. The remaining portion of improved floor area (portion of previous locker room) is converted to a new laundry room. In addition, this Project includes site improvements to the existing ADA parking stall (and adjacent parking spaces) along with modifications the existing path of travel to the front entry door as required for ADA compliance (approximately 2,302 S.F.)

Files

File Type Posted
Fire Station No. 77 Restroom Remodel Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity