St. Paul Pump Replacement

Solicitation # S6350000013231
Posted 3/18/25, 5:01 PM
No Updates
Due 3/25/25, 5:00 PM
State
Oregon
Source
View
Similar Opportunities
The state and local contract opportunity involves the Oregon Department of Fish and Wildlife (ODFW) procuring a comprehensive Formalin Treatment system for the Willamette Hatchery, located in Lane County. The procurement specifically requires a contractor to design, deliver, install, and calibrate a new chemical treatment system for fish egg treatments, with precise technical specifications for chemical delivery rates between 1:600 to 1:400. Key deliverables include equipment procurement,...
The Minnesota Department of Natural Resources (DNR) is seeking bids for the 2025-566 East Metro Fisheries Pond 6 Well Pump Replacement project located in Ramsey County. The procurement is a Request for Bid (RFB) soliciting contractors to replace a well pump at the State Fair Fish Holding Pond (Pond 6), which broke down in fall 2024. The project requires providing all labor, equipment, materials, and incidentals to install a replacement pump, including a 400 GPM pump end, 15 HP 230V motor,...
The Oregon Department of Fish and Wildlife (ODFW) has initiated a Special Procurement by Rule process for a specialized repair and overhaul of a Hitachi excavator. The procurement focuses on comprehensive equipment repair services for a large excavator previously used in Research and Evaluation (R&E) projects, which was damaged during a loan to Warmwater at St. Louis ponds. PAPE Machinery in Eugene, Oregon, has been selected as the sole provider due to their specialized expertise in large...
The Tualatin Soil and Water Conservation District (SWCD) is seeking aquatic construction services for the Coffee Creek Aquatic Organism Passage Project located northwest of Glenwood, Oregon. The project involves removing an aquatic passage barrier by replacing existing 36" and 40" culverts with a new concrete bridge, realigning the stream channel, constructing a roughened riffle, and stabilizing the upstream bank. Key deliverables include stream channel re-alignment at a 2.8%...

The state and local contract opportunity involves the St. Paul Pump Replacement project, issued by the Oregon Department of Fish and Wildlife (ODFW) and located in Marion County. The procurement focuses on installing a new submersible pump at the St. Paul Ponds facility, with specific requirements to deliver 200 gallons per minute and restore critical water management infrastructure. The project was initiated after the existing pump ceased functioning in September 2024, with multiple repair attempts proving unsuccessful. Schneider Water Services has been selected as the contractor to procure and install the new submersible pump, connect it to the existing electrical configuration, and conduct comprehensive system tests to verify operational functionality. The contract specifies a completion deadline of June 15, 2025, with the contractor responsible for pump installation and ODFW providing project oversight and quality control. Key deliverables include full pump replacement, electrical connection, system testing, and adherence to Federal Davis-Bacon Act prevailing wage rates.

The contract has a total estimated value of $19,857.60, covering labor, materials, and equipment for the pump replacement, with full payment to be issued upon successful project completion. While no specific set-aside designations are mentioned, the contract includes standard compliance requirements for equal employment opportunity and environmental regulations. The contractor, Schneider Water Services, will be required to maintain multiple insurance coverages, including workers' compensation and commercial general liability insurance. The project is critical for maintaining water levels in the facility's ponds, which are essential for fish management objectives. The existing infrastructure involves connecting the new submersible pump to the current electrical system, suggesting minimal technological integration complexity. The contract incorporates standard state and federal compliance provisions, ensuring comprehensive regulatory adherence throughout the project's execution.

Generated 3/19/25, 7:28 AM