South Gate Citywide Intersection Improvements Project
Closed State & local contract opportunity Posted
- Solicitation number
- PW-RFP-718-ST
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Jose Loera jloera@sogate.org (323) 563-9578
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of South Gate Public Works Department is requesting proposals for the Citywide Intersection Improvements Project, a pedestrian and motorist safety enhancement at seven major intersections, with bids due August 27, 2026 at 10:00 a.m. Pacific Daylight Time.
The scope encompasses upgrading traffic signal hardware — installing retroflective back plates on existing signal heads and removing or replacing existing signal heads at various intersections. The project includes implementing Leading Pedestrian Intervals at three intersections along Firestone Boulevard; installing high-visibility crosswalks with advance limit lines at Firestone Boulevard and Garfield Avenue; and extending the raised median at Southern Place and Atlantic Avenue to prevent eastbound left turns. Work is performed within the City of South Gate, California (Los Angeles County).
Bids must be submitted in paper format using a lump-sum award type with line items. No bonding is required. An online question-and-answer period closes August 19, 2026 at 4:00 p.m. Pacific Daylight Time. No pre-bid meeting is scheduled. The RFP does not disclose estimated bid value, project start date, or project duration.
The project is classified under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors) and 541330 (Engineering Services). Contact Jose Loera, City of South Gate Public Works Department, at (323) 563-9578 or jjloera@sogate.org for inquiries.
Opportunity text
The purpose of the South Gate Citywide Intersection Improvement Project is to enhance pedestrian and motorist safety at seven major intersections. The desired improvements include but are not limited to upgrading signal hardware such as installing retroflective back plates on existing signal heads and the removal/replacement of existing signal heads with new signal heads at various intersections. The project will also accommodate pedestrians by increasing Leading Pedestrian Intervals (LPI) at 3 intersections along Firestone Blvd, and also install high visibility crosswalks with advance limit line at Firestone Blvd and Garfield Ave. The project will also extend the raised median at Southern Pl and Atlantic Ave to the south to prevent eastbound left turns.
Files
| File | Type | Posted |
|---|---|---|
| South Gate Citywide Intersection Improvements Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity