The Yuma County Flood Control District is seeking sealed bids for expansion of the Smucker Park Detention Basin, a stormwater infrastructure project, with bids due June 26, 2026 at 1:30 p.m. MST at the Yuma County Administration Building.

The scope encompasses earthen embankment construction (62,100 cubic yards of excavation and 24,200 cubic yards of fill), an elevated access way bisecting the basin, underground storm drain piping (reinforced concrete pipe ranging from 18 to 48 inches), storm drain connections including a new 42-inch system and temporary 12-inch bypass, site clearance and removal of existing infrastructure (pump station, pipes, catch basins, pavement), riprap placement, concrete and asphalt work, fencing, water line installation, and site lighting. The project is located northwest of Ray Smucker Park in Yuma County, Arizona, with completion required within 180 calendar days from Notice to Proceed.

The base bid amount is $4.5 million. Bid surety bonds or certified checks equal to ten percent of total bid amount are required at submission. The successful contractor must provide Performance and Labor & Materials Surety Bonds each equal to 100 percent of the contract amount under Arizona Revised Statutes Title 34, Chapter 2, Article 2, and Certificate of Liability Insurance with minimum limits of $2 million general liability and $1 million automobile liability, with the Flood Control District named as additional insured and waiver of subrogation required.

Contractors must comply with Arizona's Legal Arizona Workers Act and E-Verify requirements, certify non-collusion and non-engagement in boycotts of Israel, and are subject to Arizona law with venue in Yuma County courts. Payment is based on actual quantities at unit bid prices per Arizona Revised Statutes Section 34-221. Contract documents and plans are available from the Yuma County Department of Engineering for a refundable $100 deposit per set or online at www.yumacountyaz.gov/rfp. Prospective bidders must register on the Plan Holder's List to receive addenda and notices. Bidder inquiries must be submitted in writing via email to Alan Quintero, Yuma County Flood Control Manager, at least 72 hours prior to bid opening.

Opportunity text

The project includes expansion of the existing Detention basin northwest of the existing Ray Smucker Park. The basin will be formed by connecting an earthen embankment, which will generally run parallel to, and on the east side of the East Main Canal and will tie into the existing slope on the north and south side of the project. The new detention basin includes an elevated access way bifurcating the basin from east to west. An underground pipe will hydraulically connect north end of the basin to the outlet pipe, which will be constructed near the south end of the basin. One existing large, highly specialized concrete box culvert entering the basin from the east will bring storm water to the basin from 28th Street while a temporary 12 storm drain bypass at Westridge Drive will bring stormwater to basin during construction of the new 42 storm drain system.

Files

File Type Posted
Smucker Park Proposal Pamphlet.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity