Skylink Fire Pump and Component Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- PA1879
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- James Legerme jlegerme@dfwairport.com (972) 973-5600
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Dallas/Fort Worth International Airport is soliciting bids for replacement of fire pumps, jockey pumps, control panels, and connecting piping at multiple terminals, with proposals due September 29, 2026. Work spans Terminals A, B, E, C North, D, and the Terminal D garage within the Airport's Air Operations Area (AOA), requiring contractors to conduct thorough existing-condition reviews prior to commencing activities and to coordinate with airport operations throughout execution.
The scope includes fire-pump and control-panel replacement at Terminals A, B, E, and C North; installation of drain piping from floor control valves in Terminal D's two fire pump rooms; and fire-pump and control-panel replacement in the Terminal D garage. All work is performed within an active airport environment subject to AOA access and operational constraints. Contractors must demonstrate familiarity with the airport's existing fire protection systems and comply with applicable codes and standards governing fire protection equipment and installation.
A technical-specifications document (PA1879) establishes detailed equipment and materials requirements, available as a government file attachment. The source does not disclose estimated contract value, contract term, incumbent contractor, or evaluation criteria. Questions deadline and pre-bid meeting date are not stated in the available source material.
Opportunity text
The Work of this Contract comprises of replacement of the fire pump, jockey pump, control panel, and connecting piping within the pump room at terminals A, B, E, and C north, installation of drain piping from the floor control valves in the Terminal D (2) fire pump rooms, and replacement of the fire pump along with control panel replacement for the garage at terminal D. The contractor shall be responsible for reviewing all existing conditions associated with the work prior to commencement of work activities. Construction will be inside the Airports Air Operations Area (AOA). The Contractor shall be responsible for reviewing all existing conditions associated with the Work prior to commencement of work activities is required.
Files
| File | Type | Posted |
|---|---|---|
| PA1879 Technical Specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity