The City of Ontario Engineering Department is requesting competitive sealed bids for the Sixth Street Roadway Improvements Project (Contract 2013, Project ST2509) with electronic bids due September 30, 2026 at 11:00 a.m. through PlanetBids. A pre-bid meeting and site walk are scheduled prior to the bid deadline. The successful bidder must hold a Class "A" contractor's license and comply with prevailing wage, labor registration, and all California public works requirements — critical eligibility filters.

The scope encompasses roadway and traffic calming work (22,700 square yards of pavement grinding, 2,850 tons of ARHM overlay, 1,450 tons of AC base paving, 4,450 linear feet of PCC curb and gutter, 15 ADA curb ramps, 3,450 square feet of PCC sidewalk, 8 rolled curb medians, 4 traffic detection loops); street light improvements (new poles, LED fixtures, decorative lights, pull boxes, conduit, trenching, and utility support); and landscaping and irrigation improvements (tree removal and planting, shrub and ground-cover installation, irrigation system components including controllers, drip lines, pop-up sprinklers, and PVC main and service laterals). The project also includes utility adjustments to grade (32 valve covers, 9 manhole rings and covers), monument restoration, and repainting of existing decorative lights.

Work must be completed within 90 working days from Notice to Proceed. Bid security equal to 10 percent of the total bid price is required (cash, certified check, cashier's check, or bid bond). The successful bidder must furnish Performance and Payment Bonds each equal to 100 percent of the contract price. Liquidated damages of $5,200 per calendar day apply for delays beyond contract completion. All bids must include the Non-Collusion Declaration, Public Works Contractor Registration Certification, Iran Contracting Act Certification, Fleet Compliance Certification, Contractor Information and Experience Form, and List of Subcontractors Form. Bidders and all listed subcontractors must hold valid Certificates of Reported Compliance for fleet vehicles per California Air Resources Board requirements. The City retains 5 percent of progress payments unless findings support 10 percent retention for complex work.

Opportunity text

The work to be performed under this contract consists of: Roadway & Traffic Calming Improvements: Grinding existing pavement, Placement of ARHM overlay, Placement of traffic detection loops, Constructing rolled curb medians, Constructing ADA curb ramps, Constructing PCC sidewalk, Constructing PCC cross gutter & spandrels, Constructing residential drive approaches, Removal and replacement of PCC curb and gutter, Removal and replacement of AC base pavement, and Signing & striping. Adjusting to Grade: Utility valve covers, Manhole covers and rings, Monument wells, and Other appurtenances as necessary. Street Light Improvements: Installing new streetlight poles, foundations, and LED light fixtures, Installation of decorative streetlights, Installation of pull boxes and conduit, Trenching, excavation, backfill, and trench repair, Utility support, and Other appurtenances necessary to complete the project as described in the project plans and specifications. Landscaping & Irrigation Improvements: Removal of existing trees, Planting new trees, Planting new shrubs and ground cover, Installation of backflow devices, Installation of tree bubblers, Installation of irrigation gate valves, drip valves, flush valves, control valves, and couplers, Installation of pop-up spray sprinklers, irrigation dripline, and tubing, Installation of wiring, conduit, sleeves, and irrigation controllers, PVC irrigation main line, PVC irrigation service lateral, Modifying existing landscaping and irrigation to match existing, Utility support, Trenching, excavation, backfill, and trench repair, and Other appurtenances necessary to complete the project as described in the project plans and specifications. Other Improvements: Stripping, cleaning, and repainting existing decorative streetlights, Removal of existing parkway drains, Relocating existing street signs, and Restoring and re-establishing existing monuments.

Files

File Type Posted
Sixth Street Roadway Improvements Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity